SMS Tutorials SRH-2D – Culvert Structures with HY-8 SMS v. 13.1 SRH-2D Tutorial Culvert Structures with HY-8 Objectives This tutorial demonstrates the process of modeling culverts in SRH-2D coupled with the Federal Highway Administrations HY-8 culvert analysis application. The “SRH-2D Simulations” tutorial should have been completed before attempting this one. All files for this tutorial are found in the “Input” folder within the “ SMS SRH-2D HY8 Culvert” tutorial folder. Prerequisites Requirements Time SMS Overview SRH-2D SRH-2D – Simulations SRH-2D Mesh Module Scatter Module Map Module P Page 1 of 12 a g e 15–20 minutes

SMS Tutorials SRH-2D – Culvert Structures with HY-8 1 2 3 Model Overview . 2 Getting Started . 2 Creating the Culvert Structure . 3 3.1 Creating the Structure Arcs . 4 3.2 Assigning Culvert Structure Attributes in HY-8 . 6 4 Saving, Exporting, and Launching the Simulation . 8 5 Visualizing the Results . 9 6 Conclusion . 12 1 Model Overview An existing SRH-2D model will be used to facilitate the setup for this tutorial. SRH-2D provides two different ways to define a culvert. The recommended method to simulate a culvert in SRH-2D is to couple the FHWA HY-8 culvert model with SRH-2D. This tutorial will demonstrate this. The second approach for simulation of a culvert involves incorporating the lower half of the culvert barrel into the mesh/grid. This approach is not described in this tutorial. The area being modeled in this tutorial is located at the confluence of the west and middle forks of the Gila River, located in New Mexico. During high flows, a significant amount of water is backed up near one of the roadway bridges causing flooding upstream. The purpose of this tutorial is to simulate a culvert relief structure near the bridge to mitigate the flooding. It should be noted that the HY-8 culvert model was developed as a still pool calculation. Therefore, it does not simulate the change in flow due to momentum. SRH-2D includes momentum. There is an option to use total head rather than simple water level to partially account for this limitation. 2 Getting Started To begin, do the following: 1. Open a new instance of SMS. 2. Select File Open to bring up the Open dialog. 3. Navigate to and select the “Gila Structure.sms” project found in the / SMS SRH2D HY8 Culvert /Input folder for this tutorial. 4. Click Open to import the data. In the Project Explorer, duplicates of the “ Regular Flow” simulation and “ BC” coverage have been made to expedite the model setup process. The duplicates have been renamed as “ Culvert Flow” and “ Culvert BC” respectively. In addition, the “ Culvert BC” has been added to the “ Culvert Flow” simulation in place of the original P Page 2 of 12 a g e

SMS Tutorials SRH-2D – Culvert Structures with HY-8 “ BC” coverage. The culvert structure will be created within the “ coverage and simulated in the “ Culvert Flow” simulation. Culvert BC” The process of duplicating these items and swapping out the boundary condition coverage was demonstrated in the “SRH-2D Simulations” tutorial. 1. In the Time steps window, scroll through the time steps and select the final time interval at “0 02:30:00”. The project should

An existing SRH-2D model will be used to facilitate the setup for this tutorial. SRH-2D provides two different ways to define a culvert. The recommended method to simulate a culvert in SRH-2D is to couple the FHWA HY-8 culvert model with SRH-2D. This tutorial will demonstrate this. The second approach for simulation of a culvert involves

Related Documents:

Launch SRH-2D. 2. The SRH-2D model wrapper will appear and begin to run the Pre-SRH-2D application. Once that is finished, the SRH-2D window will appear and begin running. While running SRH-2D, three DOS windows will appear. One is the SRH-2D graphic window and the other two are showing the residuals and water surface elevations at the monitor .

SRH-2D Tutorials Bridge Pressure Flow SMS v. 12 SRH-2D Tutorials Bridge Pressure Flow Page 1 of 11P a g e SRH-2D Tutorial Bridge Pressure Flow Objectives This tutorial demonstrates the process of creating a pressure flow boundary condition within SRH -2D to model pressurized flow beneath a brid ge.

STEAMIST PRODUCT CATALOG AND PRICE LIST 3 SMS SAUNA HEATERS MODEL PRICE kW MIN/MAX CU FT RANGE CONTROL PRODUCT CODE ELECTRICAL MAX VOLTS PHASE AMPS BREAKER*** WEIGHT** SMS-45* Built-in 0400 240 1 19 30 140 lbs SMS-60* SMS-80* SMS-60R SMS-80R SMS-80R-3 SMS-100 240 lbs SMS-100-3 SMS-125 SMS-125-3 SMS-145 SMS-145-3 All .

While running SRH-2D, progress is shown in the Simulation Run Queue dialog. 2. Expand the "Regular Flow" item in the top portion of the Simulation Run Queue dialog, then expand the "SRH-2D" item as showing in Figure 5. Figure 5 SRH-2D Simulation Run Queue 3. Highlight the "SRH-2D" item to populate the lower portion of the dialog. 4.

IV. PIPE CULVERT Pipe culvert may be a single or multiple pipes; therefore, if it’s used a single culvert, then a large diameter culvert is required if the width of the water channel becomes greater than multiple pipe culvert is going to use in that place. The multiple pipe culvert i

sediment transport problem. SRH-2D also provides detailed hydraulic output that can be used to estimate pier and abutment scour potential. 1.1 Background The Cimarron River example used in the SMS "SRH-2D Sediment Transport" tutorial will be use in this tutorial. If needed, review the "SRH-2D Sediment Transport" tutorial

SMS Gateway Center does now have exclusive pipeline for OTP SMS delivery. SMS delivery will be instant to the recipient with the fail-safe method. Our exclusive OTP SMS Gateway will only allow who sends out OTPs to their clients. Hence, this requires pre-approved SMS template to use this gateway. OTP SMS Service Features OTP SMS Route

the tank itself, API standards prescribe provisions for leak prevention, leak detection, and leak containment. It is useful to distinguish between leak prevention, leak detection and leak containment to better understand the changes that have occurred in tank standards over the years. In simple terms, leak prevention is any process that is designed to deter a leak from occurring in the first .