IN-SITE INTELLIGENT POWER SYSTEM MONITORING Quick Start Installation Guide – Medium Voltage Package WARNING— Death, serious injury, or fire hazard could result from improper connection or operation of this instrument. Read and understand this manual before connecting the device. If this equipment is not used in a manner specified by the manufacturer, the protection provided by the equipment may be impaired. Installation, service, and maintenance of your In-Site device must be performed by a licensed electrician in compliance with all applicable national and local codes and regulations. 2008– 2020 Power Standards Ltd. All rights reserved. No part of this document may be copied, reproduced, or translated into another language without the prior written consent of Power Sensors Ltd. “PQube ” is a registered trademark of Power Standards Lab. Power Survey and Power Standards Lab (DBA) Powerside The information contained in this document is subject to change without notice. POWERSIDE MAKES NO WARRANTY OF ANY KIND WITH REGARD TO THIS MATERIAL, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR USE. Powerside shall not be liable for errors contained herein or for incidental or consequential damages in connection with the furnishing, performance, or use of this material. If you do not accept this limitation on liability, please return the product to Powerside prior to use. Product manufactured in the United States of America. Visit Powerside.com for the latest installation instructions and useful tips on power quality. Page 1 In-Site Quick Start Guide MV (V.2) Technical Support US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392 In-Site.support@powerside.com

Unpack the box and check the components. Remove all protective tape and film. Ensure you have all components as show below. If parts are missing or broken, contact Technical Support. What’s included (1) In-Site gateway (4) 5A Current Transformers (CT) (1) Antenna Bracket (2) Antennas (2) Antenna Cables (50 ft.) Safety Installation should only be performed by an electrician professionally qualified for the specific equipment where the In-Site gateway will be installed. Follow all safety practices prescribed in local electrical code and professional best practices Follow all OSHA electrical safety guidelines as it related to work practices and personal protection equipment for work with lethal voltages Required materials 4 ea. of either #10 to #1/4 screws Powerside Commissioning App downloaded from the Apple or Google Play Store. Login credentials provided by Powerside. Contact Powerside Technical Support. Visit Powerside.com for the latest installation instructions and useful tips on power quality. Page 2 In-Site Quick Start Guide MV (V.2) Technical Support US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392 In-Site.support@powerside.com

Installation Disconnect the power necessary to make the installation location electrically safe. If In-Site is installed at the point of common coupling (service entrance), turn off the AC mains. Install as close to Point of Common Coupling (PCC) as possible while observing all local electrical standards i.e. NFPA 70 and NFPA 70E. To ensure safety follow Lock Out Tag Out (LOTO) procedures. Install In-Site gateway within 20 ft of connection point (length of CT secondary wiring). Note—Overcurrent protection devices (fuses) are installed in the unit. Replace in kind if required. voltage measurement lines: ATDR2 – 600Vac Class CC 2A Time Delay 200kA power supply: BK1-S505H-1-R – 250Vac 20mm 1A Time Delay Fuse 1kA Connect the 5A split-core CT’s on the 5A secondary leads of existing MV CT. Following the instructions provided with the CT, Install the CT with THE WHITE CT LABEL FACING TOWARD THE SOURCE (Figure 2). WARNING: Ensure that the CT’s secondary circuit is shortcircuited prior to work on CT circuit. Under no circumstances should the secondary circuit of the CT be operated without a shorting block in place as lethal voltages may be present. Connect CT leads for I1-I4 to terminals 1 — 8 per Figure 3 (below). Phases are color coded. L1 Red L2 Yellow L3 Blue N White 1 2 3 4 Figure 1 Enclosure Dimensions: 15.45” x 9.86” x 4.34. Overall (including mounting flange and antenna): 22.82” x 11.50 x 4.34” 5 Using installer-provided wiring install Mains AC voltage input wires for L1, L2, L3 on existing Potential Transformers (PTs) and Neutral and Ground (PE) per Figure 3 (below) for a WYE configuration. If configuring a DELTA system, input wires for L1, L2, L3, and Ground (PE). Figure 2 Using installer-provided wiring connect the power supply to a 120Vac source to terminals 11-12. 6 Visit Powerside.com for the latest installation instructions and useful tips on power quality. Page 3 In-Site Quick Start Guide MV (V.2) Technical Support US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392 In-Site.support@powerside.com

7 Install the antenna to connectors on the exterior of enclosure and check the cellular reception. If the cellular reception is weak, install the antennas in a better location using the provided cables and mounting bracket. Figure 3 8 While observing all appropriate safety requirements, return power to the affected systems. The In-Site gateway will power up and is awaiting commissioning. After 3 5 minutes, a green LED will indicate successful initialization. See Figure 4. If the unit does not power-up check the wiring. If the problem persists, contact Technical Support. Visit Powerside.com for the latest installation instructions and useful tips on power quality. Page 4 In-Site Quick Start Guide MV (V.2) Technical Support US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392 In-Site.support@powerside.com

In-Site Gateway Indoor Installation Diagram Inside Building Utility Power Disconnect Switch Utility Disconnect Utility Meter LV Installation (up to 600V) Transformer Building Disconnect Transformer Distribution Panel 3-phase Motors Distribution Panel Single Phase Lighting & Appliances MV Installation (above 600V)

Figure 4 Figure 5 9 Activate the In-Site gateway using the Powerside Commissioning In-Site phone App. Commissioning takes approximately 15 20 minutes. Launch the Powerside Commissioning App. Log in with the credentials provided by Powerside. Visit Powerside.com for the latest installation instructions and useful tips on power quality. Click on the serial number of your PQube 3. See cover panel figure 5 Page 5 Click on each parameter to verify and set your settings as needed. In-Site Quick Start Guide MV (V.2) Technical Support US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392 In-Site.support@powerside.com

Only Wye and Delta are supported. Choose your configuration and nominal voltages by pressing down the arrow keys. The CTs are preconfigured for 5A Standard CT. You must enter the PT ratio. No CT required on I5 (GND). Earth current will be calculated The convention used is a counterclockwise rotation: L1 (red), L2 (yellow), L3 (blue). If vectors do not match this, verify wiring and CT direction. Tips: If you get the errors below, move your phone closer to the device, hit OK to try again or contact Powerside support. Visit Powerside.com for the latest installation instructions and useful tips on power quality. Page 6 In-Site Quick Start Guide MV (V.2) Technical Support US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392 In-Site.support@powerside.com

Click ONBOARD DEVICE to apply settings from App to In-Site device. Review settings. Cancel if changes needed or hit Apply to proceed with uploading data to the cloud. In-Site tries to correlate your location with its internal database. If it can’t find a match (detected with your smartphone), the App will require entering the Measurement Point name manually. A validation code will be given when the data has been successfully uploaded to the Powerside cloud 10 11 Before leaving the site, contact Powerside technical support (US (888) 736-4347 ǀ Canada (877) 333-8392) to validate data is sent to the cloud. Your In-Site gateway installation and configuration are now complete. Allow up to 72 hours for your “Measurement Point” to go live on In-Site. Please contact In-Site. support@powerside.com for assistance or further information on our product. Powerside and PQube are registered trademarks of Power Survey and Equipment Ltd. and Power Standards Lab. 2020 Powerside. All rights reserved. Visit Powerside.com for the latest installation instructions and useful tips on power quality. Page 7 In-Site Quick Start Guide MV (V.2) Technical Support US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392 In-Site.support@powerside.com

In-Site Quick Start Guide MV (V.2) Technicalinstructions and useful tips on power Support US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392 In-Site.support@powerside.com Visit Powerside.com for the latestinstallation quality. Page 1 IN-SITE INTELLIGENT POWER SYSTEM MONITORING Quick Start Installation Guide - Medium Voltage Package

Related Documents:

intelligent vehicles in recent years. Intelligent vehicles tech-nologies are based on the information of the ego vehicle and its surroundings, such as the lanes, roads, and other vehicles, using the sensors of intelligent vehicles [4], [5]. The sensors in intelligent vehicles can be divided into internal and external sensors.

changes in the control loop configuration. Intelligent power supplies can monitor internal temperatures and supply power to cooling fans only when needed. They can also dynamically change the control loop behavior to provide the optimal system response for the load conditions. Intelligent Power Conversion Lowers Standby Power Consumption

NFS2-640 Intelligent Addressable Fire Alarm System Intelligent Fire Alarm Control Panels dn-7111:b † A-13 NFS2-640 7111pho2.jpg General The NFS2-640 intelligent Fire Alarm Control Panel is part of the ONYX Series of Fire Alarm Controls from NOTIFIER. As a stand-alone small-to-large system, or as a File Size: 710KBPage Count: 10

intelligent tutor to understand the course or the lesson. An intelligent tutoring system can also provide real-time data to teachers and developers looking to improve teaching methods. Because educational institutions cannot allocate a human tutor to every student, intelligent tutoring systems are

INFINITI Intelligent Key System The INFINITI Intelligent Key system allows you to lock or unlock the vehicle, open the trunk and start the engine. NOTE: It is important to make sure the Intelligent Key is with you (that is, in your pocket or purse). The operating range of the Intelligent Key is within 31.5 in (80 cm) from each request switch.

The Intelligent Transmitter/0 to 20 mA Output Interface Module contains four Intelligent Transmitter interface channels and four 20 mA dc analog output channels. The module is a main type and . The Intelligent Transmitter interface portion of the module is a transmitter host, thus enabling the system to receive digital messages from the

An intelligent parking management solution can automatically recognize vehicle license plates, detect parking vacancy, assign available parking slot, and can also enable Intelligent vehicle search function to assist users efficiently. Traffic Management Surveillance System Intelligent Parking ARK-5420ID Intel Core i5 (Ivy) 32 GB mSATA

may be taken on an instrument with only one manual. Consequently, in Grades 1–3, some notes may be transposed or omitted, provided the result is musically satisfactory. Elements of the exam All ABRSM graded Organ exams comprise the following elements: three Pieces; Scales, arpeggios and exercises; Sight-reading (with an additional Transposition exercise in Grades 6–8); and Aural tests .