AMC2 Enclosure - 2 DIN Rails

7m ago
6 Views
1 Downloads
746.98 KB
18 Pages
Last View : 13d ago
Last Download : 3m ago
Upload by : Emanuel Batten
Transcription

AMC2 enclosure - 2 DIN rails AEC-AMC2-UL2 en Installation Manual

AMC2 enclosure - 2 DIN rails Table of Contents en 3 Table of contents 1 System overview 4 1.1 Components of the housing 4 1.2 Accessories Kit 6 2 Mounting the housing 8 3 Connection of the Devices 9 4 Connections for Supporting UPS 12 4.1 12 V Mode Operation 13 4.2 24 V Mode Operation 15 Bosch Sicherheitssysteme GmbH 2016-09 AMC2 enclosure - 2 DIN rails

4 AMC2 enclosure - 2 DIN rails en System overview 1 System overview 1.1 Components of the housing The metal housing includes the following components: Figure 1.1: Components of the Housing 2016-09 AMC2 enclosure - 2 DIN rails Bosch Sicherheitssysteme GmbH

AMC2 enclosure - 2 DIN rails System overview en Item No. Description 1 Cover grounding point 2 Mounting rail for PS and AMC 3 AMC grounding point 4 Cable knock-outs for reader 5 and signal cables 5 Cover tamper switch 6 Temperature sensor bracket 7 Clips for rechargeable batteries 8 Main grounding point 9 AMC-EXT grounding point 10 Power cable knock-out 11 Label 12 Three pin connector 13 Power supply connector Bosch Sicherheitssysteme GmbH 2016-09 AMC2 enclosure - 2 DIN rails

6 1.2 en System overview AMC2 enclosure - 2 DIN rails Accessories Kit The accessories kit includes the following cables. Install these cables as described in the chapter Connection of the Devices. Figure 1.2: Content of Accessories Kit 2016-09 AMC2 enclosure - 2 DIN rails Bosch Sicherheitssysteme GmbH

AMC2 enclosure - 2 DIN rails System overview en 7 Content of the Accessories Kit: Index Description A Pre-assembled cable to connect the AMC to the power supply B Pre-assembled cable to connect the rechargeable batteries to the UPS (uninterruptable power supply) which is included in the power supply C Battery cable for using 24V mode E Cable ties to secure the pre-assembled cable G Pre-assembled cable with temperature sensor H Three screw anchors S8 and wood screws M6 x 50 J Bracket for cable fixing Bosch Sicherheitssysteme GmbH 2016-09 AMC2 enclosure - 2 DIN rails

8 2 en Mounting the housing AMC2 enclosure - 2 DIN rails Mounting the housing Open the housing cover lock with the provided key and open the cover. Mount the metal housing at the desired position with the screw anchors provided with the enclosure. Use the screws at the points to mount the housing against the wall. Figure 2.1: Dimensions of the Housing 2016-09 AMC2 enclosure - 2 DIN rails Bosch Sicherheitssysteme GmbH

AMC2 enclosure - 2 DIN rails 3 Connection of the Devices en 9 Connection of the Devices Figure 3.1: Connections in the Enclosure Connect the readers and other peripheral devices as described in the AMC Installation manuals and in the manuals of the peripheral devices. Route the device cables through the knockouts in the top and right side wall of the housing, or through the rear of the housing. Notice! Make sure that the mains adapter has the correct output voltage (12V or 24V). Bosch Sicherheitssysteme GmbH 2016-09 AMC2 enclosure - 2 DIN rails

10 en Connection of the Devices AMC2 enclosure - 2 DIN rails When installing the enclosure, make sure to provide an appropriate disconnect device for the mains supply voltage. Removing a fuse or simply pulling the plug is not an appropriate means to disconnect the device! Warning! ! Risk of electric shock! Disconnect the mains supply voltage before doing any work at the devices inside the enclosure. Notice! All cables connected to the AMC modules and the power supply are classified as Class 2 Conductors, with the exception of the battery cable and the AC input cable. These two are non-power limited circuits. Notice! For UL installations a minimum of ¼” (6.4 mm) spacing is to be maintained between all class 2 or 3 conductors and all electric, light, power, Class 1 conductors, non-Class 2 or 3 signaling conductors, or medium-power network-powered broadband communications-circuit conductors (see areas 3 and 4 in Fig. 3.1). Mounting Components 1. Mount the AMC on the rail on the right (item 2 – Fig. 1.1) and left aside the power supply. 2. If rechargeable batteries are used, put them on the bottom of the housing and secure them using clip 7 (Fig. 1.1). The components described below refer to Cable A (Figure 1.2): Cable A - AMC Power Cable 1. Connect the 7-pin plug A1 to the AMC’s power supply connector (labeled: POWER). 2016-09 AMC2 enclosure - 2 DIN rails Bosch Sicherheitssysteme GmbH

AMC2 enclosure - 2 DIN rails 2. Connection of the Devices en 11 Attach connectors A3 to the PS-interface DC and A2 to the interface labeled OK. 3. Connect the grounding cable A4 at the grounding point 3 (Fig. 1.1). The components described below refer to Figure 1.1: Cable 12 - AC Power Cable Connect the 2-pin plug 13 on the interface AC of the power supply. Cable 5 – Tamper Cable Connect the loose ends of the cover tamper switch to the 2-pin screw connector on the top of the AMC marked with T. Position the cable in the space between the housing and the mounting rail. Danger! Risk of electric shock Make sure that all wires to be connected have Zero potential! Main AC supply X: 1. Connect the grounding cable to the housing at position 8 in 2. Connect the blue (neutral) wire to terminal N. 3. Connect the brown (phase) wire to terminal L1. figure 1.1. Notice! Shorten the external supply wires so that the ground (yellow/ green) wire is at least 20 mm (0.8 in.) longer than the live (blue and brown) wires. This ensures that the ground wire cannot be accidentally disconnected before live wires. Cable 1 – Cover grounding Cable 1. Connect cable 1 to the grounding point on the cover. 2. Close the cover. Bosch Sicherheitssysteme GmbH 2016-09 AMC2 enclosure - 2 DIN rails

12 4 AMC2 enclosure - 2 DIN rails en Connections for Supporting UPS Connections for Supporting UPS Notice! Before switching to battery operation disconnect the AC Power Cable (Fig. 1.1 – item 13) from the power supply. Notice! Use only 12V 7Ah batteries. Change lead batteries at least every 5 years Notice! In UL installations, if the fuse is blown, order cable No. F.01U. 328.004 with your regional spare part desk to replace the entire battery cable. Cable G - Battery temperature sensor cable 1. Attach connector G1 on the PS-interface labeled RTH. 2. Route the cable across the temperature sensor bracket 6 so that the temperature sensor G2 hangs approximitely 5 cm (2 in.) above the rechargeable batteries. 2016-09 AMC2 enclosure - 2 DIN rails Bosch Sicherheitssysteme GmbH

AMC2 enclosure - 2 DIN rails 4.1 Connections for Supporting UPS en 13 12 V Mode Operation To set the power supply to 12V mode set the switch as displayed in the image below. Figure 4.1: Power Supply Switch in 12V Mode Figure 4.2: 12V Mode - with one battery (left) and two batteries (right) Bosch Sicherheitssysteme GmbH 2016-09 AMC2 enclosure - 2 DIN rails

14 AMC2 enclosure - 2 DIN rails en Connections for Supporting UPS The 12 V mode can be configured using one or two rechargeable batteries. For a one-battery installation, refer to the Figure 4.2 (left), and perform the following procedure: 1. Connect B1 to the power supply position labeled BAT. 2. Connect B2a (black) to the rechargeable battery’s – terminal, and B2b (red) to the rechargeable battery’s terminal. 3. Stick the bracket (Fig. 1.2 – item J) on the back of the housing next to the batteries. 4. Connectors B3a and B3b remain unused - fix them using the bracket J. For the two-battery installation, refer to the Figure 4.2 (right) and perform the following procedure: 1. Connect B1 to the power supply position labeled BAT. 2. Connect B2a (black) to the rechargeable battery’s – terminal, and B2b (red) to the rechargeable battery’s terminal. 3. Connect B3a (black) to the second rechargeable battery’s – terminal, and B3b (red) to the second rechargeable battery’s terminal. 2016-09 AMC2 enclosure - 2 DIN rails Bosch Sicherheitssysteme GmbH

AMC2 enclosure - 2 DIN rails 4.2 Connections for Supporting UPS en 15 24 V Mode Operation To set the power supply to 24V mode set the switch as displayed in the image below. Figure 4.3: Power Supply Switch in 24V Mode Figure 4.4: 24V Mode Bosch Sicherheitssysteme GmbH 2016-09 AMC2 enclosure - 2 DIN rails

16 en Connections for Supporting UPS AMC2 enclosure - 2 DIN rails Cables B and C - Battery Cables 1. Connect the plug connector B1 on the PS-interface labeled 2. Attach connector B2b (red) to the pin of the first with BAT. rechargeable battery. 3. With cable C connect the – pin of the first rechargeable battery to the pin of the second rechargeable battery. 4. Attach connector B2a (black) to the – pin of the second rechargeable battery. 5. Stick the bracket (Fig. 1.2 – item J) on the back of the housing next to the batteries. 6. Connectors B3a and B3b remain unused – fix them using the bracket J. 2016-09 AMC2 enclosure - 2 DIN rails Bosch Sicherheitssysteme GmbH

Bosch Sicherheitssysteme GmbH Robert-Bosch-Ring 5 85630 Grasbrunn Germany www.boschsecurity.com Bosch Sicherheitssysteme GmbH, 2016

2016-09 AMC2 enclosure - 2 DIN rails Bosch Sicherheitssysteme GmbH. 12 V Mode Operation To set the power supply to 12V mode set the switch as displayed in the image below. Figure 4.1: Power Supply Switch in 12V Mode Figure 4.2: 12V Mode - with one battery (left) and two batteries (right) 4.1

Related Documents:

Note from the Publisher The Ruby on Rails 3 Tutorial and Reference Collectionconsists of two bestselling Rails eBooks: Ruby on Rails 3 Tutorial:Learn Rails by Example by Michael Hartl The Rails 3 Wayby Obie Fernandez Ruby on Rails 3 Tutorial:Learn Rails by Exampleis a hands-on guide to the Rails 3 envi- ronment.Through detailed instruction,you develop your own complete sample

2012-up Honda Fit Double DIN or DIN with Pocket GM5205B 2010-up Chevrolet Cruz Double DIN or DIN with Pocket HA1714B 2012-up Honda CRV Double DIN or DIN with Pocket HA1715B 2011-up Honda Odyssey Double DIN or DIN with Pocket HD7000B 1996-2012 Harley Davidson dash kit and harness CR1293B 2011-up Jeep Cherokee/Dodge Durango Double DIN or DIN with .

1 750 V Gr.C 660 V Gr.C NFC DIN UL CSA ACD13-6 ACD23-6 BO3 10x3 mm BO6 15x6 mm SFB1 SFB2 SFB3 RC610 SPBO SPBO R 3 2 1 ACD13-6 (DIN 1 - DIN 3) ACD23-6 (DIN 2 - DIN 3) ACD13-6 (DIN 1 - DIN 3) BO3 BO6 10 x 3 6 x 6 15 x 6 X X X XX XX ACD23-6 (DIN 2 - DIN 3) Rail 35 x 7,5 x 1 PR3.Z2 Rail 35 x 15 x 2,3 PR4 Rail 35 x 15 x 1,5 PR5 Ra

The DIN Standards corresponding to the International Standards referred to in clause 2 and in the bibliog-raphy of the EN are as follows: ISO Standard DIN Standard ISO 225 DIN EN 20225 ISO 724 DIN ISO 724 ISO 898-1 DIN EN ISO 898-1 ISO 3269 DIN EN ISO 3269 ISO 3506-1 DIN EN ISO 3506-1 ISO 4042 DIN

SLIP-ON FLANGE ND 10 FOR ISO-PIPE DIN 2576 g. VLAKKE LASFLENS ND 10 VOOR DIN-BUIS DIN 2576 BRIDE PLATE À SOUDER PN 10 POUR TUBE DIN DIN 2576 FLANSCHE, GLATT ZUM SCHWEISSEN ND 10 FÜR DIN ROHR DIN 2576 SLIP-ON FLANGE ND 10 FOR DIN-PIPE DIN 2576 "All models, types, values, rates, dimensions, a.s.o. are subject to change, without notice" 173 6

rails dbconsole rails db # starts up the Rails db console Command Shortcut Description Help: All commands can be run with -h for more information rails g scaffold zombie name:string bio:text age:integer rails g migration RemoveEmailFromUser email:string rails g mailer Zombi

Contributing to Ruby on Rails Rails is not 'somebody else's framework.' This guide covers a variety of ways that you can get involved in the ongoing development of Rails. API Documentation Guidelines This guide documents the Ruby on Rails API documentation guidelines. Ruby on Rails Guides Guidelines This guide documents the Ruby on Rails guides .

Plays are sometimes written from scratch; others are well known. KS3 Dramatic Society Club . of those students currently studying for ABRSM theory exams. Bring your lunch and have a chat. School Choir Large mixed (male and female voices) choir open to all years and abilities, which prepares for major musical events. Senior Jazz Combo Wild and unpredictable band of senior musicians in years .