5.D Qualification of water supplies 5.D.1 Introduction 5.D.2 Risk analysis 5.D.3 Design qualification 5.D.4 Installation qualification 5.D.5 Operational qualification (OQ) 5.D.6 Transfer to the user 5.D.7 Process validation/performance qualification (PQ) 5.D.8 Qualification report 5.E Operation of water supplies

An equipment qualification is handled in different phases of the equipment lifecycle, start-ing with design qualification, installation qualification, and then operational qualification and performance qualification. Every step in the equipment qualification formally comprises a plan, the execution and a report.

exempting qualification. B Structure of the qualification The structure of the qualification and syllabus subjects is shown on the following diagram. C Progression through the qualification Subjects within each learning pillar of the qualification are designed to be sequential, from operational to strategic level, encouraging

Operational qualification Operational qualification (OQ) 13. Operational qualification (OQ) should follow Installation qualification. 3.10 OQ normally follows IQ but depending on the complexity of the equipment it maybe performed as a combined Installation/Operation Qualification (IOQ). OQ could include but is not be limited to the following:

Installation Qualification Plan Sample Revision Number: 1.0 Page 12 of 16 Revision Date: 8/7/2012 8.6 Installation Qualification Summary Report The Installation Qualification Summary Report for Sample will be updated to describe the testing associated with the Prerequisite Software and Hardware section, including

INSTALLATION QUALI INSTALLATION QUALIFICATION FICATION (1) INSTALLATION INSTALLATION QUALIFICATION QUALIFICATION (1) 1 rue du Petit Clamart - B.P. 50 78142 VELIZY CEDEX - FRANCE Tél. 01.46.29.99.60 - Fax. 01.46.30.87.30 ETUDES & DEVELOPPEMENT VALIDATION C 1/4 NSCA 161/16 LC reference : 37K53E Page Rev. Page Customer reference : 45382135/392 IQ .

Qualification Standards (Template) April 2006 . TwinJet Instructor/Evaluator Qualification Standards . crewmembers, instructors, other evaluators and other operational personnel. In an effort to remain aligned with traditional check airman policy, the AQP term “evaluator” is . Evaluation Qualification Continuing Qualification Strategy .

covers the three stages of qualification needed to release a temperature-controlled storage area for routine use: installation qualification (IQ), operational qualification (OQ) and performance qualification (PQ). Related topics are covered in the following Technical Supplements: Temperature mapping of storage areas.

The installation qualification must be completed prior to execution of the operational qualification phase. Operational Qualification Operational qualification demonstrates that the installed equipment is functioning within established limits as specified by Helmer. The operational qualification must be completed prior to the execution of the .

8. Installation Qualification, Operational Qualification and Process Qualification page 30 9. Example of Validation Protocol page 33 10. Example of a qualification Proforma page 35 11. Validation sign off report page 50 12. Acknowledgements and Declarations of interest page 51

INSTALLATION / OPERATIONAL QUALIFICATION PROTOCOL Rev. 04-05-2020 1/6 The following Installation Qualification (IQ) & Operation Qualification (OQ) is intended to be a guideline. Local IQ & OQ procedures can vary depending on intended use. The IQ & OQ is concluded if all the criteria of acceptance are verified and the possible deviations are .