Department of Permitting ServicesDivision of Building Construction255 Rockville Pike, 2nd FloorRockville, MD 20850-4166Phone: 311 in Montgomery County or (240) 777-0311Fax rmittingservicesCommercial Building Permit Submittal RequirementsPROJECT INFORMATIONName of projectAddress of projectPermit TypeAP#Suite(mark one - each permit type requires a separate application) New Construction Addition to Existing Structure Alteration to Existing Structure (Part E not required) Change of Use Misc:Drawings provided (mark all that apply) Architectural (including Life Safety) Structural Electrical Mechanical Plumbing Energy/Green BuildingPLANS INCONSISTENT WITH THIS CHECKLIST WILL BE DENIEDComplete all Parts unless otherwise indicated. Indicate the sheet where the required information isprovided. If the information is provided on a series of sheets, indicate the first sheet where theinformation is provided. NA (Not Applicable) is only an acceptable response if “ NA” is provided.PART A – ARCHITECTURAL (ALL PROJECTS)RequirementOn Sheet1Written scope of work.2Sheet index.3List of applicable codes.Code analysis. (see Example A)4The code analysis must address all of the information presented inExample A, and the following: IECC Compliance Path (See Part F) Design live loads per floor Special use and occupancy conditions Tabulation of required fire-resistance ratings for variousstructural elements and/or assemblies.IBC Height & Area calculations. (see Example B)5 NAMixed use analysis with calculations. (see Example C)6DRAWINGS NA7Key plan with a point of compass. NAScaled and dimensioned foundation and floor plans showing the use8of all spaces/rooms and the means of egress arrangement.Scaled and dimensioned plans of handicap accessibility, facilities, Provided NA9and fixtures. NA10 Scaled reflected ceiling plans. NA11 Scaled roof plans clearly showing all openings.EGRESS NA12 Occupant load calculations (per IBC and NFPA). NA13 Egress plan and analysis.DETAILS, ELEVATIONS, SECTIONS

1415161718192021222324Clear indication of fire and/or smoke resistance rated partitionlocations and ratings, and Use Group separations and ratings.Include listed/approved design numbers used.Detailed fire rating of all exit stairs and shaft enclosures.Building exterior elevations, showing all openings.Building interior elevations, as appropriate.Complete sections and details for stairways, ramps (including theguards and hand rails with all dimensions shown), foundations,floors, walls, and roofs.SCHEDULESWindows and door schedules, including the hardware type anddescription.Room finish schedule.Partition schedule and wall legend.OTHERFor Industrialized Buildings. Copy (picture) of the Maryland Statecertification.Legend of symbols used on architectural drawings.Location and ratings of vertical shafts, flues, etc.PART B – STRUCTURAL (ALL 40414243444546 Provided NA NA NA Provided NA NA NA NA NA NAOn Sheet NA NA NA NA NA NA NA NA NA NAScale: Minimum 1/8.Foundation plans, sections and details.Floor framing plans, sections and details.Roof framing plans, sections and details.Beam (concrete structures), column and foundation schedules.Lateral load resisting elements, schedules and details.Structural notes and specifications.Geotechnical report.Retaining walls.Soil strengthening methods and underpinning.PART C – ELECTRICAL (ALL PROJECTS)RequirementElectrical site plan, including area lighting and service(s) provided,loads, and design calculations.Scaled floor plans and reflected ceiling plans indicating lighting andpower wiring diagrams, location of fixtures, outlets and equipment,clear indication of fixtures on emergency circuits or independentpower source, and exit sign markings.Emergency power generating equipment.Electrical power riser diagram.Ground fault protection.Grounding.Fire alarm riser diagram.List of electrical symbols used on drawings.Schedule for fixtures.Schedule for panels and switchboards.Schedule for transformers.Electrical load and energy designs. NAOn Sheet NA NA NA NA NA NA NA NA NA NA NA NA

727374 NASmoke detector, smoke alarm, and carbon monoxide alarmlocations.PART D – MECHANICAL (ALL PROJECTS)RequirementClear indication of type of heating equipment (oil, gas, electric, etc.)and corresponding fuel distribution lines.Clear indication of fuel and its distribution for generators.Reflected ceiling plans, roof plans, and elevations or sections,indicating size and location of duct work, piping, grilles, fire dampers,etc.Location and size of air handling equipment and plenums.Location and size of boilers, chillers, and cooling towers.Location of exhaust equipment and associated ducts and firedampers.Location of unit heaters, ventilators, rooftop units, heat pumps, ductheaters, etc.Clear indication of any smoke control system.Equipment schedule.Equipment details.List of mechanical symbols used on drawings.Commissioning plan (See Part F)On SheetPART E – SITE (NEW CONSTRUCTION, ADDTIONS, CHANGE OF USE)RequirementOn SheetSITE INFORMATIONVicinity map, north arrow, date and scale (preferred 1’ 30’).Property lines with bearings and distances.Lot or parcel numbers, block number, and record plat or deedreference.Calculations of building height, building lot coverage, density, greenarea, and parking calculations.Existing topography and proposed grading at contour intervals of notmore than two feet.Bodies of water, water courses, and 100-year floodplains.Vegetative cover/landfills.Locations and names of existing or proposed highways and streetsserving the site, showing center-lines, widths of paving, grades,median break points and right-of-way lines.SITE FEATURESLocation, height, area, and use of all structures.Front, side, and rear yard setbacks.Location of aboveground & underground fuel storage tanks & similarcontainers.Location of recreational areas, green areas, and other open spaces.Location and dimensions of all driveways, loading areas, directionaltraffic controls, points of access to surrounding streets, andwalkways.Location of all sewer, water and storm drainage lines, well and septicsystems, and all easements and rights-of-way.Landscape plan for showing all man-made features and the location,size, and species of all plant material. NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

7576777879808182838485868788899090919293FIRE PROTECTION (not required for Change of Use only)Fire department access site plan approved by MC DFRS.Fire flow data demonstration compliance with NFPA 1, Fire Code.Fire hydrant locations within 400’ of the building, sizes of all watermains feeding fire hydrants and buildings, and static pressure (ifknown), along with WSSC contract number and estimated date ofcompletion (if applicable).Location of all egress doors discharging to the outsideACCESSIBILITYAccessible route indicated on site plans - unobstructed from parkingto the building, including details of curb cuts, ramps, sidewalks, etc.Parking spaces count analysis, including the number and location ofrequired and provided accessible parking spacesPART F – IECC COMPLIANCE & GREEN BUILDING(see Commercial Energy Code information on DPS website)RequirementIECC COMPLIANCEIECC Compliance Path (provide in code analysis)Thermal envelope planThermal envelope details, including insulation, air barriers, daylightzones, and duct insulationFenestration scheduleElectrical: lighting and lighting controlsMechanical: system design criteria and economizersStatement of design compliance – stamped, sealed, signed, anddatedEnergy conservation analysis/computations (e.g. ComCheck) with astatement of compliance per Part IV of the DPS Commercial EnergyCode requirements documentUSGBC INFORMATION (NEW CONSTRUCTION ONLY)USGBC registration number provided.USGBC Rating indicated (Certified – Platinum).COMMISSIONING (NEW CONSTRUCTION ONLY)Mechanical systems commissioning and completion requirementsCommissioning plan provided that includes: Narrative description of activities during each phase Listing of specific equipment, appliances, or systems to betested, and a description of the tests Functions to be tested Conditions under which the test will be perform706657ed Measurable criteria for performanceStatement indicating documents, as specified in the CommercialEnergy Code: Building Envelope, Mechanical, Service Water Heatingand Lighting handout, are to be provided to the building owner within90 days of receipt of the certificate of occupancy.Name of party who will be conducting the functional testing.Total Building Performance Option. IECC or ASHRAE 90.1compliance report (Acceptable software: Energy Plus, DOE-2,BLAST, SPARK) – INDICATE ON CODE ANALYSIS (see ExampleA) NAOn Sheet NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

PART G – ADDITIONAL REQUIREMENTS (ALL PROJECTS)RequirementOn Sheet NAProject specifications for complex structures.Updated 09-18-2015EXAMPLE A – Code Analysis (Requirement 4)CODE ANALYSISExisting BuildingIBCNFPAIBC occupancy classification(s)Type of constructionNumber of stories above gradeHigh Rise(Y/N)Covered Mall(Y/N)IBC 510 Pedestal Construction (Y/N)Fully Sprinklered (Y/N)Fire Alarm(Y/N)Floor area of renovationOccupant loadEnergy Compliance PathProposed AlterationIBCNFPAsq. ftsq. ft.EXAMPLE B – Height & Area Calculations (Requirement 5)HEIGHT & AREAHeightAreaUse 1Use 2Use 3Use 4TabularSprinkler IncreaseTotal AllowedActualTabularSprinkler IncreaseFrontage IncreaseTotal AllowedActualEXAMPLE C – Mixed Use Calculations (Requirement 6)SEPARATED MIXED USEUse 1Use 2Use 3Use 4TOTALAreaOccupant LoadSeparations ReqNON-SEPARATED MIXEDUSEUse 1Use 2Use 3Use 4TOTALAreaOccupant LoadSeparations Req

PT1.2.3.4.5.Name of ProjectAddress of project w/ suite/unitContact information: Name, mailing address, email address, phone numberArchitect information: Name, mailing address, email address, phone numberDesign professional’s seal, signature, and professional certification

50 Reflected ceiling plans, roof plans, and elevations or sections, indicating size and location of duct work, piping, grilles, fire dampers, etc. NA . 51 Location and size of air handling equipment and plenums. NA . 52 Location and size of boilers, chillers, and cooling towers. NA . 53 Location of exhaust equipment and associated ducts and fire

Related Documents:

and cut sheets of all devices and panels. REVISIONS : - Need Revision Submittal form - Need Architect's Narrative - Need clouds and deltas - Signature is required. www.davie-fl.gov Deerfield Beach (8/27/2015) EPD submittal / Approval required prior to Bldg Dept submittal. Apply 'on-line' for Security Code & Application Number. Walk-thru review .

Once a Permit has been cancelled, no work can recommence under that Permit. A new Permit to Work must be completed for the remainder of the work and approved by the Permit Issuer. 5.9 Permit extension In instances where it is necessary to extend a Permit beyond the original expiry time / date e.g. the task has

a permit-required confined space. No permit-required confined space may be entered without a valid entry permit. The entry permit must contain the following informa on: the iden ty of the permit space to be entered and the purpose of the entry, the date and the authorized dura on of the entry permit, a lis ng of authorized

CITY OF SARTELL SUBMITTAL CHECK LIST & QUESTIONAIRE FOR NEW HOMES The City of Sartell must receive the following information to start reviewing your application. Your building permit application will . Sartell, MN 56377-0140 (320) 258-7317 Fax (320) 253-3337 FEES Permit Valuation: _ Permit Fee _ .

DPP Submittal 4 This is mostly an issue with model corrections Example: 1 DPP could be a seasonal model . *If there is a discrepancy in data between the DPP Submittal Form and the IDEV file, the IDEV data is used. . o 46% - DPP Submittal Form issues

The submittal items managed for a project can be packaged in the e-Builder system. The packages can be categorized by trade or CSI code, depending on the needs of the user managing the items. Once a Submittal Package is created, items contained in the Submittal Register can be added to their perspective package and transmitted for a formal .

Provide the following in a sealed envelope or package as indicated above in Submittal Check List item C.: Paper Copies One original copy of your complete submittal, arranged as indicated in Sections 3.01 and 3.02. Twelve copies of the complete original submittal. Electronic copies (USB drive, labeled with company name): One electronic copy of the complete submittal in either Word or PDF

c. For a Revision to an existing permit or shop drawings, select "Application for Revision/shop drawing". d. For Permit Extensions, select "Permit Extension". e. For a Re-issueof an expired permit, select "Permit Reissuance". f. For a Change of Contractor to a permit, select "Change of Contractor".