Project Management EssentialsDRAFT for discussion only

Our Approach to the WorkshopDiscussionWe will introduce themodule topic with aninitial discussion on thetopic’s relevanceObjectivesLeadingPracticesWe will discuss leadingpractices in ProjectManagement andidentify elements thatwill help us succeed inthe fieldKnowledgeCheckEach module begins with Knowledge checks afterobjectives to ensure youeach leading practiceunderstand what we will section help you retainlearnfoundational informationTools & UsageCase ActivityA deep dive into toolsYou will team up andshow you the relevance apply leading practicesand application method and tools to a case studyfor each toolexampleSummary &ReflectionA concise summaryhelps you solidify keytakeaways from themodule and reflectionprovides an opportunityto discuss how you willapply PM skills2

Course Agenda – Day 1TopicDescriptionModule 1: Project Design Module 2: Project Planning Project Planning Overview Activity Planning Network AnalysisModule 3: Resource Planning & Budgeting Resource Planning & Budgeting Overview Cost Management BudgetingProject Design OverviewProject Planning MatrixLogic StructureWork Breakdown Structure (WBS)3

Course Agenda – Day 2TopicDescriptionModule 4: Risk Management Risk Management Overview Risk Management LifecycleModule 5: Stakeholder Management Stakeholder Management Overview Stakeholder AnalysisModule 6: Implementation Management Wrap-up & Evaluation Training Recap Final RemarksImplementation Management OverviewImplementation TrackingMonitoring Implementation ActivitiesClosing-Out Implementation Activities4

Module 1: Project Design

Project DesignThe Project Design Module includes both the Logic Model and Work BreakdownStructureWork Breakdown StructureLogic ModelEach unit incorporates a holistic learning approach with the following key components:Introduction& ObjectivesLeadingPracticesTools &UsageCaseActivitySummaryReflection6

Project Design Learning ObjectivesAfter This Unit, You Can: Understand the key steps in Project Design Identify the components of a Logic Model and their relationship Put the Logic Model in the context of Project Management Define a Work Breakdown Structure (WBS) and list the steps to create one Explain why the WBS is the foundation of a project Use the Logic Model and WBS Templates in a real-life situation7

The Project Planning MatrixIndicatorsMeans icatorsSource icatorsSource ofInformationAssumptions, RisksOutputsOutputIndicatorsSource ofInformationAssumptions, RisksService / ProductDeliveryHierarchy ofObjectivesResultsThe PPM is the Overview of the ProjectActivitiesResources InputsExternal Factors(Assumptions, Risk)Assumptions, Risks9

The Logic Model – The Intervention LogicThe five core components of the Logic Model include Inputs, Activities, Output,Outcome, and ImpactOpportunity to Increase EffectivenessOpportunity to Increase Efficiency5. Inputs4. ActivitiesResources associated Actions taken towith the projectproduce results(i.e. what will itcost to deliver theproject?)3. OutputThe deliveredservices that resultfrom a series ofactivities2. OutcomeThe objective theproject isdesigned tocontribute to1. ImpactThe effect of theproject on thebroader environmentPerformance Indicators10

WBS TemplateThe WBS template should be used to capture 100% of the work defined by theproject scope, and to capture all deliverables5. Inputs4. Activities3. Output2. Outcome1. ImpactIMPACTOUTCOMEWBS Alignmentwith nputsInputsInputsInputs11

The Work Breakdown Structure (WBS)Work Breakdown Structure (WBS) is a hierarchical breakdown of elements of thelogic model. The WBS serves to organize and define the total scope of the projectDecomposition: The subdivision of project deliverablesinto smaller, more manageable components until the workand deliverables are defined to the Activity, Sub-Activity orTask LevelITip: Create a WBS for the project before completing aConcept Note. The WBS will assist with determining thecontent for the Concept Note12

The WBS is the Foundation of the ProjectWBS is the link to project design and the first project planning activity1. What do I need to do?WBSRefine ScopeDefineActivities2. What do I do first? Howlong will it take?StartFinishSchedulingNetworkDiagram3. What resources will be needed?BudgetingResources13

Activity Planning TemplateThe Activity Planning Template helps align the logic model elements with the WBSIMPACTLinkOutcometo#OCs20% private .32.4OC1OUTCOME (OC)Reduction of timeto obtain newlicenseLinktoOPsOP1;OP2Output#OP1OUTPUT (OP)ACTY#ACTIVITY1As-is process mapping and analysis2Process re-engineeringLicensing ReformSUB-ACTIVITYReview and analyze previous reform efforts, past effortsMapping and diagnostics of the 6 trade and 4 non-tradeDesign survey re: experiences with licensingConduct surveyAs-is process mapping analysis completedIdentify best practices relevant to Afghan contextStudy as-is analysis, suggest reform proposals, setObtain endorsement of new process by Minister ofProcess re-engineering completePREDECResourceE-SSORS 5/4/1114

Module 2: Project Planning

Project Planning Learning ObjectivesAfter This Unit, You Can: Systematically identify relevant activities to achieve required outputs Define network analysis and its uses in project planning Perform a forward pass, a backward pass, and calculate a float Identify the critical path in your project plan16

Activity SchedulingDefining what goes first and how long activities take is the second step1. What do I need to do?WBSRefine ScopeDefineActivities2. What do I do first? Howlong will it take?StartFinishSchedulingNetworkDiagram3. What resources will be needed?BudgetingResources17

Activity Planning StepsActivity Planning typically includes three steps that allow the project schedule to becreatedPlanning StepDescription1. ActivityDefinitionIdentify activities thatwill generate projectresults2. ActivitySequencingIdentify the order ofactivities, consideringtheir relationship3. ActivityDurationEstimatingEstimate the timeneeded to completeactivitiesOutcomeProject ScheduleProper activity planning provides the framework for developing an integrated project approach andimplementation plan, ultimately allowing for the creation of the project’s Design Document18

Defining ActivitiesOutputs should be decomposed into activities that allow the project to achieve thedesired impact. These activities are typically:EstimatedManagedMeasuredEach activity outlined within the WBS must be complete and accurate, as it will beleveraged to develop the project yActivityActivityActivityActivityActivity19

Network Diagram TemplateThe Network Diagram Template may be created to schematically show thesequencing of projectsStartFinishA completed network diagram can be used to identify the critical path of a project, which is theseries of dependent activities that determines the shortest possible duration of a project20

Activity Duration EstimatingConsider these elements in estimating the number of work periods that will beneeded for each activity Potential and available resources and capabilities Constraints Delays and lag-times Risks and build-in reserve/contingency time Input from subject matter experts and historical information Assumptions Start and end dates for project activities21

Tools for Activity Planning and Network AnalysisMicrosoft Project is available for you to use as a Project Management toolMicrosoft Project Requires buying a license Industry standard; widelyaccepted and used in thecorporate environment Extensive help resources onlineand offline Does not require Java Excellent scheduling, resourceplanning, and cost tracking tool22

Module 3: Resource Planning &Budgeting

Resource Planning & Budgeting Learning ObjectivesAfter This Unit, You Can: Understand key restrictions to project management List steps involved in estimating resource requirements Understand elements that drive costs on a project Complete a resource estimation worksheet24

Estimating ResourcesThe third step, estimating resources, is critical for project success1. What do I need to do?Refine ScopeWBSDefineActivities2. What do I do first? Howlong will it take?StartFinishSchedulingNetworkDiagram3. What resources will be needed?BudgetingResources25

Cost Management ProcessesIn a competitive budgetary environment, formal cost management is a crucialproject management skillThree interactive processes are required to manage costs effectively:1. Estimate Costs(Planning)2. Determine Budget(Planning)3. Control Costs(Monitoring &Controlling)26

Costs, Budgets, and MonitoringBy spending the appropriate time estimating costs, determining the budget, andcontrolling costs, the project can achieve its objectivesEstimate Costs(Planning)Determine Budget(Planning)Control Costs (Monitoring& Controlling)Inputs:Inputs:Inputs: Scope Activity Cost Estimates Project Management Plan Project Schedule Basis of Estimates Project Funding Requirements Risk Analysis Resource Calendars Staff and Consultant Updates Assumptions Contracts Type/Availability of Resources Consulting ResourcesTools & Techniques: ForecastingTools & Technique:Tools & Techniques: Performance Reviews Design to Budget Cost Aggregation Project Management Software Top-down Estimating Expert Judgment Bottom-up Estimating Budget RevisionOutputs: Budget ForecastsOutput:Outputs: Change Requests Activity Cost Estimates Cost Performance Baseline Project Management Plan Updates Basis of Estimates Project Funding Requirements Project Document Updates Project Document Updates27

Estimating by Type of ResourcePeople and travel drive the majority of the project expensesEstimate Activity Resources:Estimate the type and quantities of people, travel and other project costs required foreach activityPeopleBoth staff and consultants need tobe reflectedTravelTransportation and all othertravel-related expensesOther CostsMaterials, leases, and all otherservices or overhead28

Types of CostsConsider the impact of various types of costs on expense over timeDirect Costs Costs directly attributable to project work Examples: team travel; salaries; cost ofmaterialsFixed Costs Costs that do not change as productionchanges Examples: leases; other pre-arrangedcontractsVersusIndirect Costs Overhead items or costs that benefitmore than one project Examples: office support staff; use ofoffice spaceVersusVariable Costs Costs that change with the scope andtime spent Examples: staff salary; consultant fees29

Incorporating Costs within WBSWhen planning your activities, consider how the various activities and WBS outputswill effect costs and overall ActivityInputsInputsInputsInputsConsider thecosts associatedwith each workstream’sactivitiesConsider the costs associated with the inputs related to eachwork stream30

Budgeting TechniquesVarious budgeting techniques can be used depending on the projectDesign-to-Budget:Top-down Estimating:Bottom-up estimating:Used when the project budget isfixed. Costs are estimated byworking backwards from the totalbudget through prioritizing andassessing requirements until theproject can be completed withinavailable budget.This approach typically relies oncost histories from past projects,and knowledge of the specificparameters of those projects.Requires a cost estimate to bedeveloped for each of the workpackages in the WBS. Then,once the cost of each workpackage is estimated, theestimates can be added togetherto compile the total project costestimate.While top-down estimation is a quick way to establish a baseline for the project, it is rarely sufficientfor estimating project costs and should always be accompanied with a bottom-up estimationtechnique31

Considerations for Resource Planning & BudgetingAssumptions, risks, and external environment play a role in resource planning andbudgeting, potentially impacting total costsRisks Decrease of supply inputs Presence of competitors insimilar marketExternal Environment Political tensions Economic climate Environmental regulationsAssumptions Time required Resource availabilityResourcePlanningandBudgeting32

Project Management EssentialsDay 2DRAFT for discussion only

Course Agenda – Day 2TopicDescriptionModule 4: Risk Management Risk Management Overview Risk Management LifecycleModule 5: Stakeholder Management Stakeholder Management Overview Stakeholder AnalysisModule 6: Implementation Management Wrap-up & Evaluation Training Recap Final RemarksImplementation Management OverviewImplementation TrackingMonitoring Implementation ActivitiesClosing-Out Implementation Activities34

Module 4: Risk Management

Risk Management Learning ObjectivesAfter This Unit, You Can: Define risk, opportunity, and risk management Understand the importance of risk management List and define 5 general kinds of risk Explain the 4 steps in the risk management process Develop a plan to mitigate risks using a risk log Continually monitor and update risks over a project life cycle36

Introduction to Risk ManagementRisk is the probability of a condition or event with a negative impact on achieving abusiness objectivesRisk Management is the process of identifying, assessing and managing risks soas to avoid, mitigate, or control them37

Identifying Potential RisksStrategic: The potential risk of a failure to achieve WB’s strategic missionOperationalThe financial andreputational impactresulting frominadequate or failedinternal processes,people, and systems,or from externaleventsFinancialThe risk that financialcontributions fromdonors and clients areinadequate to fund thework in line with theBoard approvedstrategyStakeholderNegative perceptionon the part ofstakeholders includingclients, donors,affected communities,civil societyorganizations, or otherrelevant partiesSocial andEnvironmentalS&E environmentalassessment andmanagement systems;labor &workingconditions; pollutionprevention &abatement; communityhealth & safety;indigenous people38

The Risk Management LifecycleRisk Management is a dynamic process, beginning at the planning phase of aproject, and continuing throughout the project life cycleRisk Management is divided in four phases:1. RiskIdentificationIdentifying, loggingand classifying risks.2. RiskAssessmentAssessingprobabilities andimpact to prioritizerisks.3. Risk MitigationDeterminingresponse to risks.4. Risk Monitoringand ControlContinuousmonitoring andupdating.39

Phase 1: Risk IdentificationThe first step consists in identifying, logging, and classifying the risksIdentification GuidelinesDocumentation Guidelines1. Brainstorm a comprehensive list – do not try toanalyze or solve at this point1. State the risk and the area of impact and be asspecific as possible2. Use PM documents for identification(WBS, work plan, stakeholder analysis)2. Use complete sentences and do not includequestions or action items3. Work with your team (they will be doing thework; with project and regional leadership, theyhave the experience) to identify risks3. Document risks based on categories consistentwith your workLow Capacity of Client Implementation TeamsLow Commitment of Key Client GroupsCompetition for Qualified IndividualsInability to Maintain MomentumFailure to Scale Pilot Projects40

Phase 2: Risk AssessmentThe second step consists of assessing risk probability and impact in order toprioritize risksAssessment Guidelines1. Assess probability of risk occurring2. Assess impact of risk occurring3. Determine appropriate risk quadrant4. Assess stakeholders involved (bubblesize)5. Determine risk priorityProbability of RiskMappingImpact of Risk Occurring The size of the bubble indicates thelevel of influence of resources involved The location indicates the level ofinfluence and impact The color indicates group category41

Phase 3: Risk MitigationThe third step is determining a response to risksAvoidEliminate the threat by eliminating the causeMitigateReduce the probability or impact of the riskAccept & BudgetAccept the risk and budget for contingenciesTransferSeek outside responsibility for risk management (outsource)42

Phase 4: Risk Monitoring & ControlThe final step, monitoring and controlling risk, requires ongoing discipline ofexecutionRisk Monitoring & Control1. Execute2. EvaluateContinuousExecution3. Document43

Risk Management LogA Risk Management Log encapsulates the risk management process throughoutthe project lifecycle and should be constantly updatedIdentificationRisk #DescriptionAssessmentCreated BySAMPLESAMPLEFinding resources of the rightskill set might be difficultProjectTeam robability(Likelihood)Action to be dEstablish relationship withprofessional Associations anduniversities to access pool ofpotential candidates.John Smith4/2/10Low 0-5StatusIn ProgressRisk SeverityScoring:Medium 6-12High 13-2544

Module 5: Stakeholder Management

Stakeholder Management Learning ObjectivesAfter This Unit, You Can: Define stakeholder and stakeholder engagement/management List and explain the steps for conducting a stakeholder analysis Define the strategies to manage stakeholders in your project List and explain the steps involved in creating a communication plan46

Overview of Key TermsStakeholders are individuals, groups, and organizations that will impact or beimpacted by the implementation of the projectStakeholder Management is a structured approach to identifying and handling all aspects ofstakeholder involvement and participation in the project.Stakeholder Engagement is a continuous process of actively developing and buildingrelationships with stakeholders throughout the life of the project.Common Stakeholders: Project sponsor(s) or donor(s) Local consultants / academic institutions Clients, beneficiaries, and NGOs CMU, GP, and CCSA WBG colleagues Other (e.g. media outlets)47

Stakeholder AnalysisStakeholder analysis is the process of identifying and assessing the potential impactof stakeholders on the projectKey OutcomesKey Activities Determine who is important to theproject’s success Identify the stakeholder’s potential effecton the project Identify potential risks or projectroadblocks Determine how to best involvestakeholders Develop enhanced relationships Define clear assumptions &potential risks Manage expectations ofengagement48

Step 1: Identify Potential StakeholdersThe first step is to determine all people, groups, and institutions that will affect, or beaffected, by the projectWBGOne approachis to think interms ofcategoriesand then listyour keystakeholdersClientsDonors &PartnersBeneficiaries& Other CMU, GP, and CCSAWBG Science of Delivery TeamGlobal / Regional / Engagement LeadsFacilitators, Coaches, and Change Specialists Ministry of Finance Ministry of Infrastructure MD of Partner Bank Local Consultants Academic Institutions Civil SocietyCommunity GroupsPressPrivate Sector Organisations

Project Management Essentials DRAFT for discussion only. Our Approach to the Workshop 2 We will introduce the module topic with an initial discussion on the topic’s relevance Discussion Case Activity Leading Practices Summary & Reflection We will discuss leading practices in Project Management and

Related Documents:

Northern Bank & Trust Co. Patriot Community Bank People's United Bank Pilgrim Bank Radius Bank RTN Federal Credit Union Santander StonehamBank TD Bank The Cooperative Bank The Savings Bank The Village Bank Walpole Cooperative Bank Wellesley Bank Winchester Co-operative Bank Abington Bank Bank of Canton Blue Hills Bank Boston Private Bank & Trust

M/s G.M. Kapadia & Co., Chartered Accountants Bankers HDFC Bank Ltd. (Primary Banker) Axis Bank Ltd. Bank of Baroda Bandhan Bank Ltd. Citibank N.A. CSB Bank Ltd. DCB Bank Ltd. Deutsche Bank ESAF Small Finance Bank ICICI Bank Ltd. IDFC Bank Ltd. Indian Bank RBL Bank Ltd. Saraswat Co-op Bank Ltd. State Bank of India Suryoday Small Finance Bank Ltd.

Essentials of Knowledge Management,Bryan Bergeron Essentials of Patents,Andy Gibbs and Bob DeMatteis Essentials of Payroll Management and Accounting,Steven M.Bragg Essentials of Shared Services,Bryan Bergeron Essentials of Supply Chain Management,Michael Hugos Essentials of Trademarks and Unfair Competition,

10. HDFC Bank Limited 11. ICICI Bank Ltd 12. Indian Overseas Bank 13. ING Vysya Bank 14. Kotak Bank -Virtual card 15. Shivalik Bank 16. Standard Chartered Bank 17. State Bank of Bikaner and Jaipur 18. State Bank of India 19. State Bank of Mysore 20. State Bank of Travencore 21. Syndicate Bank 22. The Federal Bank Ltd 23. The Karur Vysya Bank Ltd

commerce bank eastern bank-east west bank everbank firstbank first hawaiian bank-first horizon bank firstmerit bank-first national of. nebraska first niagara flagstar bank f.n.b.corp. frost national bank fulton financial hancock bank iberiabank m b financial new york community banks old national, bank one west bank people's united bank raymond .

Essentials of Financial Risk Management, Karen A. Horcher Essentials of Intellectual Property, Paul J. Lerner and Alexander I. Poltorak Essentials of Knowledge Management, Bryan Bergeron Essentials of Patents, Andy Gibbs and Bob DeMatteis Essentials of Payroll Management and Accounting, Steven M. Bragg

Deka Bank Deutsche Girozentrale Deutsche Bank AG DNB Bank ASA DZ BANK AG Helaba (Landesbank Hessen-Thüringen) HSBC ICBC (London) plc ING Bank Intesa Sanpaolo Investec Bank plc KBC Bank KfW IPEX-Bank KommunalKredit Austria AG Landesbank Baden-Württemberg (LBBW) Macquarie Group mBank SA Mizuho Bank National Australia Bank National Bank of Abu Dhabi

State Bank of India State Bank of Mysore State Bank of Patiala State Bank of Travancore Syndicate Bank Tamilnadu Mercantile Bank TNSC Bank UCO Bank Union Bank of India United Bank of India Vijaya Bank YES Bank . Instruction to follow during first time use of Karur Vysya