P L U M B I N G L E G E N D PLUMBING DESIGN CRITERIA

2y ago
26 Views
2 Downloads
6.91 MB
29 Pages
Last View : 18d ago
Last Download : 3m ago
Upload by : Jayda Dunning
Transcription

SYMBOLDESCRIPTIONThese drawings and their content are the property of SERA Architects Inc. and are to be utilized on this project. Reproduction of any part of this material, without the express written permission of SERA Architects Inc. is prohibited.1% SLOPEDIRECTION OF FLOWBALL VALVEPIPE UP OR UP & DNBUTTERFLY VALVEPIPE DOWNPIPE DROPGATE VALVETOP CONNECTION - BRANCH LINEBALANCING VALVEBOTTOM CONNECTION - BRANCH LINEFIRE MAINFAUTOMATIC WET SPRINKLERASANGLE GATE VALVECOLD WATERHOT WATER (120 F)TSOS & Y GATE VALVE (OUTSIDE SCREW & YOKEGATE VALVE)TSHOT WATER CIRC (110 F)OS & Y GATE VALVE WITH TAMPER SWITCHSOLENOID VALVE140HOT WATER (140 F)140HOT WATER CIRC (122 F)SANSDSANITARY SEWER, WASTE OR SOIL BELOW GRADE OR FLOORSTORM DRAINLUBRICATED PLUG VALVEPIPING BELOW GRADECHECK VALVEWASTE, OR SOIL ABOVE GRADE OR FLOORVENTPRESSURE REDUCING VALVERDROOF DRAIN PIPING, THE PIPES FROM ROOF DRAINSD (STORM DRAIN)RELIEF VALVEVACUUM RELIEF VALVEPRESSURE & TEMPERATURE RELIEF VALVEPUMPED DISCHARGEINDIRECT WASTEGWGREASE WASTECIRCUIT SETTERPWPROCESS WASTEBACKWATER VALVEPVPROCESS VENTGNATURAL GAS (7"W.C.)REDUCED PRESSURE BACKFLOW PREVENTERRPBFPPDIWDOUBLE CHECK VALVE ASSEMBLYDCVOVERFLOW DRAIN PIPINGDRAIN LINEDOUBLE DETECTOR CHECK VALVE ASSEMBLYDDCVODDAUTOMATIC AIR VENTPSPRESSURE SWITCHFAFLOW ALARMMGMEDIUM PRESSURE GAS (2 PSIG TO 5 PSIG)LGLOW PRESSURE GASCACOMPRESSED AIR(E)EXISTING PIPEICWINDUSTRIAL COLD WATERIHWINDUSTRIAL HOT WATERIHWRFSFLOW SWITCHTWTWRINDUSTRIAL HOT WATER RETURNTEMPERED WATERTEMPERED WATER RETURNUNIONSTRAINERSTRAINER WITH BLOW OFFDIDEIONIZED WATERO2OXYGENACETACETYLENEPIPE ANCHORCSPCOMBINATION STAND PIPEPIPE ALIGNMENT GUIDEDSPDRY STAND PIPECSPCOMBINATION STAND PIPEEXPANSION JOINTFLEXIBLE CONNECTOREXISTING TO BE REMOVEDCAP OR PLUGEMOBLIND FLANGEEMERGENCY SHUT OFF VALVECONCENTRIC REDUCERECCENTRIC REDUCERWWASTE STACKAQUASTATWATER HAMMER ARRESTORWHAPGPRESSURE GAUGE WITH COCKVCWVENT STACKSCOLD WATER RISERTTHERMOMETERHWCO/WCOCLEANOUT/WALL CLEANOUTFCOFLOOR CLEANOUTYCOYARD CLEANOUTHWRGTTTEST TEEWHWALL HYDRANTHBHOSE BIBBYHYARD HYDRANTTHRUST BLOCKFDCRDODPDHOT WATER RISERHOT WATER RECIRC. RISERGAS RISERROOF DRAIN RISEROVERFLOW DRAIN RISERPLANTER DRAINFIRE DEPARTMENT CONNECTIONCAAUTO FIRE SPRINKLER RISERCOMPRESSED AIR RISERFIRE DEPARTMENT VALVEFDVASFIRE DEPARTMENT VALVE CABINETAUTOMATIC WET SPRINKLER RISERFIRE SPRINKLER FLOOR CONTROL VALVEASDAUTOMATIC SPRINKLER DRAINSIEMESE FIRE DEPT. CONN.FIRE HOSE VALVEWSPWET STANDPIPE RISERFIRE ALARM BELLPLUMBING EQUIPMENTFDFLOOR DRAINFSMISCELLANEOUS EQUIPMENTFLOOR SINK W/ GRATE AS SHOWNHUB DRAINROOF RECEPTORROOF DRAINABOVEACCESS DOORAMERICANS WITH DISABILITIESACTSDSFSHTSNSTORM DRAINSQUARE FEETSHEETSHEET FSCICLGCOCONCCONNCONTRCONTABOVE FINISHED FLOORABOVE FINISHED GRADEACCESS PANELARCHITECTAUTO FIRE SPRINKLER RISERBELOWBUTTERFLY VALVEBRAKE HORSEPOWERBRITISH THERMAL UNITBALL VALVEBACKWATER VALVECOMPRESSED AIRCONDENSATE DRAINCAP FOR FUTURECUBIC FEET PER HOURCUBIC FEET PER MINUTECUBIC FEET PER SECONDCAST W/WGTY.B.SHUT-OFF VALVESPRINKLERSTAINLESS STEELSOLENOID VALVETHRUST BLOCKTRAP PRIMERTAMPER SWITCHTEST TEETYPICALURINALUNIONVACUUM BREAKERVENTVENT THROUGH ROOFWASTEWATER CLOSETWATER HAMMER ARRESTORWALL CLEANOUTWITHWEIGHTYARD BOXCSCIRCUIT SETTERCVCWCW(FU)DNCHECK VALVECOLD WATERCOLD WATER FIXTURE UNITDOWNDCVADDCVADOUBLE CHECK VALVE ASSEMBLYDOUBLE DETECTOR CHECKVALVE FFEFHFHVFINFLRFLSWFOFPSFRMFTDRAINAGE FIXTURE UNITHOT WATER RECIRCDIAMETERDOWNSPOUT NOZZLEDRAINDRAWINGDRAINAGE WASTE AND VENTEXISTINGELECTRICALFLOW ALARMFLEXIBLE CONNECTIONFLOOR CLEANOUTFIRE DEPARTMENT VALVEFIRE DEPARTMENT VALVE CABINETFINISHED FLOOR ELEVATIONFIRE HYDRANTFIRE HOSE VALVEFINISHEDFLOORFLOW SWITCHFUEL OILFEET PER APMOFLUSH TANKFIXTURE UNITFUTUREFLUSH VALVEGASGALLONSGAS COCKGALLONS PER HOURGALLONS PER MINUTEGATE VALVEHUB DRAINHORSEPOWERHOT WATERHOT WATER FIXTURE UNITINTERNATIONAL ASSOCIATION OFPLUMBING AND MECHANICALOFFICIALSICBOINTERNATIONAL CONFERENCE OFBUILDING OFFICIALSDIRECTION OF SLOPETRAP PIMERSHUT OFF VALVE IN CONCRETE YARD BOXABVADADA#SHEET NOTE1DETAIL NO.P2SHEET NO.OVERFLOW NVERT ELEVATIONIRRIGATIONLAVATORYPOUNDS (UNIT OF FORCE)LUBRICATED PLUG VALVEMAXIMUMTHOUSANDS BTU/HRMECHANICALMANUFACTURERMINIMUMMANHOLENORMALLY CLOSEDNATIONAL FIRE PROTECTIONASSOCIATIONNO.N.O.NICNUMBERNORMALLY OPENNOT IN CONTRACTOFCIOWNER FURNISHED CONTRACTORINSTALLEDOWPOCPLBGPRVPSPSIPTOIL WASTEPOINT OF CONNECTIONPLUMBINGPRESSURE REDUCING VALVEPRESSURE SWITCHPOUNDS PER SQUARE INCHPVPVRI&CPROCESS VENTPLUG VALVEROUGH IN AND CONNECTREDUCED PRESSURE PRINCIPLEBACKFLOW PREVENTERRPBFPPRESSURE TEMPERATURE TRAP(PETE'S PLUG)RPMREVOLUTIONS PER MINUTERVRELIEF VALVE1. CODES AND STANDARDSA. AMERICANS WITH DISABILITIES ACT, (ADA)B. BUILDING CODES ENFORCED BY THE AUTHORITY HAVING JURISDICTION INOREGON:1. 2011 OREGON PLUMBING CODE (OPC) WITH STATE AMENDMENTS.2. WATER SUPPLY:A. CONNECTING TO EXISTING SYSTEM IN THE BASEMENT OF EMU.B. PIPE SIZES ARE BASED ON MAXIMUMS 3 PSI FRICTIONS LOSS FOR COPPER PIPE AT A MAXIMUM VELOCITY OF 8 FPS, ANDPREDOMINANTLY FLUSH TANK TYPE SYSTEM REQUIRING A MINIMUM RESIDUAL PRESSURE OF 15 PSI.3. SANITARY SEWER:A. BUILDING SEWER SIZE 4 INCHES @ 2 % SLOPEB. TOTAL CAPACITY 216 DRAINAGE FIXTURE UNITSC. CONNECTED LOAD 120 D.F.U.4. STORM DRAIN:A. RAINFALL INTENSITY 1.3 INCHES/HOURB. STORM DRAIN (1) 4 INCH , (1) 6 INCH IS SIZED AT 3 INCHES/HOUR @ 1 % SLOPE900 SW Fifth Ave., Suite 1600Portland, OR 97204T. 503.227.5280F. 503.274.7674www.glumac.comJob. No.: 02.13.00545Contact: TODD KOLIBABA2. GAS SERVICE:A. MAIN SIZE 2 INCHESB. MAXIMUM DISTANCE 150 FEETC. CONNECTED LOAD 4630 CFHD. DELIVERY PRESSURE: 2 PSIengineers for a sustainable futureTM6. HOT WATER:A. CIRCULATED? YB. CONNECTING TO EXIST DOMESTIC HOT HEAT EXCHANGER SYSTEM.GENERAL NOTES1.ALL WORK AND MATERIAL SHALL BE IN ACCORDANCE WITH PLUMBING SPECIFICATIONS.2.AS-BUILT RECORD DOCUMENTS: AT PROJECT CLOSEOUT, CONTRACTOR SHALL SUBMIT DETAILED INSTALLATION DRAWINGS, CHANGE ORDERS AND SPECIFICATION CHANGESTO ARCHITECT FOR APPROVAL. REFER TO SPECIFICATIONS FOR ADDITIONAL DETAILS.3.ALL EXCAVATORS MUST COMPLY WITH ALL STATE AND LOCAL REQUIREMENTS INCLUDING NOTIFICATION OF ALL OWNERS OF UNDERGROUND UTILITIES AT LEAST 2 BUSINESSDAYS, BUT NOT MORE THAN 10 BUSINESS DAYS, BEFORE COMMENCING AN EXCAVATION.4.CONTRACTOR TO COORDINATE INSTALLATION OF GAS SERVICE WITH THE LOCAL UTILITY COMPANY, CONTACT ENGINEERING DEPARTMENT. ALL EXTERIOR GAS PIPING SHALLBE PAINTED.5.DETAILED INVESTIGATION OF EXISTING CONDITIONS ARE PART OF THE CONTRACT WORK. VISIT THE JOB SITE PRIOR TO BID. REVIEW AVAILABLE EQUIPMENT LAYOUTS,ASSEMBLY DRAWINGS AND INSTALLATION SCHEDULES.6.CONTRACTOR SHALL COORDINATE ALL UTILITY LINES EXITING OR ENTERING BUILDING WITH DIVISION 2 SPECIFICATIONS AND CIVIL ENGINEER'S UTILITY PLAN DRAWINGS ANDOTHER TRADES.7.BARRIER FREE REQUIREMENTS: PROVISIONS HAVE BEEN DESIGNED TO PROVIDE FIXTURES IN ACCORDANCE WITH A.D.A., ANSI AND STATE REGULATIONS. CONTRACTOR SHALLCOMPLY WITH ALL REQUIREMENTS AND REPORT TO ARCHITECT OR OWNER'S REPRESENTATIVE WHEN FIELD CONDITIONS PREVENT CORRECT INSTALLATION8REFER TO CRAFT CENTER OWNER EQUIPMENT LIST FOR ALL EQUIPMENT REQUIRING PLUMBING CONNECTION.9.FIRE SPRINKLER CONTRACTOR TO VERIFY ALL LOCATION IN THE CRAFT CENTER FOR HAZARD GROUPS.10.DESIGN AND INSTALLATION OF FIRE PROTECTION SYSTEM BASED ON THE REQUIREMENTS OF THE STATE OF OREGON FIRE CODE, INSTALLATION SHALL ALSO COMPLY WITHREQUIREMENTS OF THE LOCAL FIRE MARSHAL AND THE OWNERS INSURING AGENCY AND THE FIRE SPRINKLER SHALL COMPLY WITH THE STANDARDS OF THE CURRENTEDITION OF NFPA13.11.ALL SANITARY AND VENT PIPING SHALL BE SLOPED AT12.1/ "FT.,4EXCEPT WHERE NOTED AT1/ "FT.8TO CLEAR STRUCTURE IN ACCORDANCE WITH OSPSC TABLE 7-5.CONTRACTOR TO COMPLY WITH THE (REDUCTION OF LEAD IN DRINKING WATER ACT) LEAD-FREE NSF STANDARDS NSF/ANSI 372 OR NSF/ANSI 61-G, PUBLIC LAW 111-380PLUMBING DRAWING 100BPU100DLEGEND AND ABBREVIATIONS - PLUMBINGSCHEDULES - PLUMBINGGROUND LEVEL - NORTH WING - PLUMBINGGROUND LEVEL - HEARTH - PLUMBINGGROUND LEVEL - 1962 ADDITION - PLUMBINGGROUND LEVEL - SOUTHWEST - PLUMBINGLEVEL 1 - NORTH WING - PLUMBINGLEVEL 1 - HEARTH & MILLS CENTER - PLUMBINGLEVEL 1 - 1962 ADDITION - PLUMBINGLEVEL 1 - FOOD SERVICE - PLUMBINGMEZZANINE - LEVEL 1 SOUTH - PLUMBINGLEVEL 2 - NORTH WING - PLUMBINGLEVEL 2 - HEARTH & MILLS CENTER - PLUMBINGLEVEL 2 - 1962 ADDITION - PLUMBINGMEZZANINE LEVEL 2 - HEARTH & MILLS CENTER- PLUMBINGROOF PLAN - NORTHWING- PLUMBINGROOF PLAN - HEARTH & MILLS CENTER - PLUMBINGROOF PLAN - 1962 ADDITION - PLUMBINGROOF PLAN - SOUTHWEST - PLUMBINGUPPER ROOF PLAN - NORTH WING - PLUMBINGENLARGED EXISTING PLANS - PLUMBINGHOT & COLD WATER RISER DIAGRAMHOT & COLD WATER RISER DIAGRAMWASTE AND VENT RISER DIAGRAM - PLUMBINGSTORM RISER DIAGRAM (NORTH WING)FIRE PROTECTION RISER DIAGRAMDETAILS - PLUMBINGLEGENDS AND ABBREVIATIONS - PLUMBINGSCHEDULES - PLUMBINGUNDERGROUND PLAN - SECTOR A - PLUMBINGUNDERGROUND PLAN - SECTOR B - PLUMBINGUNDERGROUND PLAN - SECTOR D - PLUMBING13TH AVENUE & UNIVERSITY STREETDESCRIPTIONPLUMBING DESIGN CRITERIAUNIVERSITY OF OREGONSYMBOLABBREVIATIONSLEGENDERB MEMORIAL UNION - RENOVATION & ADDITIONPACKAGE 4SERA ARCHITECTS COPYRIGHT MO PLAN - GROUND LEVEL - PLUMBINGDEMO PLAN - LEVEL 1 - PLUMBINGDEMO PLAN - MEZZANINE LEVEL - PLUMBINGDEMO PLAN - LEVEL 2 - PLUMBINGDEMO PLAN - LEVEL 3 - PLUMBINGPOINT OF CONNECTION#POUNDS OR NUMBER3/13/2014 4:00:29 PMCHECKED BY:ISSUE DATE:PROJECT NO.:2014.03.1411045LEGEND ANDABBREVIATIONS- PLUMBINGP00050% CONSTRUCTION DOCUMENTSDECK DRAIN, PLANTER DRAIN

ELECTRIC WATER HEATER SCHEDULEITEMDESCRIPTIONTRAPARMWASTEWC-1WATER CLOSETINT4"2"1 1/4"---WALL MOUNTED, FLUSH VALVEWC-2WATER CLOSETINT4"2"1 1/4"---WALL MOUNTED, FLUSH VALVE, ADAUR-1URINAL2"2"11/2"3/ "4---WALL MOUNTEDUR-2URINAL2"2"11/2"3/ "4---WALL MOUNTED, ADAL-1LAVATORY11/4"11/2"11/4"1/ "21/ "2COUNTER MOUNTEDL-2LAVATORY11/4"11/2"11/4"1/ "21/ "2WALL MOUNTED, ADAVENTHWCWREMARKSFIXTUREEWH1SYSTEM SERVEDNORTH WINGEAST PENTHOUSETANKSIZE50RECOVERYWATTSVOLTSPHASETEMP.25 GPH@ 100 T6 KW4803115MANUFACTURERREMARKSMODEL NUMBER50FBOCKROUTE RELEIF TO FLOOR SINKTANK SCHEDULES-1SINK11/2"2"11/2"1/ "21/ "2SELF-RIMMING, 18 GA. STAINLESS STEELS-2SINK11/2"2"11/2"1/ "21/ "2SELF-RIMMING, 18 GA. STAINLESS STEELFSH-1FOOT SHOWER11/2"2"11/2"1/ "21/ "2WITH MIXING VALVEITEMSERVICEMANUFACTURER AND MODELCAPACITYSIZEWEIGHTFULLET1EXPANSION TANKWATTS10------REMARKSSET PRECHARGE TO 75 PSI900 SW Fifth Ave., Suite 1600Portland, OR 97204ET2MS-1MOP SINK3"3"11/2"3/ "43/ "4WITH RIM & WALL GAURDSDF-1DUAL DRINKING FOUNTAIN(2)1 1/4"11/2"11/4"1/ "2---WITH BOTTLE FILLERHB-1INTERIOR HOSE BIBB---------3/ "4----HB-2INTERIOR HOSE BIBB---------1/ "21/ "2IN RECESSED BOXFD-1FLOOR DRAIN2"2"11/2"------PROVIDE TRAP PRIMER FROM WATER CLOSET FLUSH VALVE OR TP-1/22"------WITH TRAP PRIMER2"------HALF GRATE, WITH TRAP PRIMEREXPANSION TANKWESSELSTTA-125T. 503.227.5280F. 503.274.7674www.glumac.comJob. No.: 02.13.00545Contact: TODD KOLIBABAPART OF FTDW-160engineers for a sustainable futureTM4"3"MANUFACTURER AND MODELCP1HOT WATERCIRCULATIONBELL & GOSSETPL SERIESCAPACITYGPMHEAD, FTTYPEHPRPM1/121750VOLTS PHASEWGTREMARKS11/2"3"FLOOR DRAINSERVICE4"11/2"3"FS-1FLOOR SINKRD-1LARGE ROOF DRAIN---------------SEE PLAN FOR PIPE SIZEOD-1LARGE OVERFLOW DRAIN---------------SEE PLAN FOR PIPE SIZEDSN-1DOWNSPOUT NOZZEL---------------SEE PLAN FOR PIPE SIZE, 12"AFGTP-1PRESSURE DROP TRAP PRIMER---------1/ "2------TP-2ELECTRONIC TRAP PRIMER---------1"---WALL MOUNTED, WITH -------6INLINE30'1201------EQUIPMENT RMODELUTILITY '-10"7'-10"---------FLA GPM / INCOMING PHASESTEAM PSIG---REMARKSALL FOOD PREP AREAS, SEE CIVIL DRAWINGS,FOR EXACT LOCATION---5106-2-GADomestic Heat Transfer Package EM RECOVERY MASTER CONTROL PANEL(GPM) / INCOMINGELECTRICALSTEAM PRESSUREVAC / HZ / PHASEFLA(PSIG)45 / 11460 / 60 / 325INSTALLATIONLOCATIONINDOORAPPROX. WEIGHT (LBS.)NOTESSHIPPINGOPERATING5,8007,2501-9UL LISTED PACKAGED SYSTEM TO INCLUDE THE FOLLOWING MAJOR COMPONENTS PRE-PIPED AND WIRED ON STRUCTURAL STEEL FRAME:TAGCOMPONENTMANUFACTURERMODELQUANTITYSEWAGE EJECTOR/SUMP PUMP SCHEDULEITEMLOCATIONMANUFACTURER AND MODELTYPENOTESUL listed panel in NEMA 1 (minimum) enclosure that includes: lockable main power disconnect handle, individuallockable motor service disconnects for recirculation/condensate/sump pumps, motor overload and short circuitprotection for recirculation/condensate/sump pumps, protected control power transformer(s) on primary & secondarysides, recirculation pump "Hand-Off-Auto" switches, condensate & sump pump "Test-Off-Auto" switches with springreturn to "Off" from "Test", recirculation/condensate/sump pump "Run" lights, condensate & sump pump electricalternating relays and lead pump failure backup, sump pump "High Water Alarm" light with automatic reset, andsingle point power connection for panel.MCP-5Master Control Panel(MCP)FlowThermN/A1 eaSP-1 & 2Sump Pumps (ShippedLoose)WeilNo. 24452 eaWH-1 & 2Domestic HeaterCemlineV45SSH1036-DW2 ea45 GPM recovery each, 50 F to 140 F, 7# shell pressure, 3/4" O.D. copper tubes with double-wall construction,150# ASME, 0.0005 fouling factor, 45 gallon 316 stainless steel tank, integral bronze circulator, electronic controlvalve, double-solenoid safety relief, vacuum breaker, relief valve, with Cemtrol controller mounted to side of MCP.CRU-2Condensate PumpsXylem DomesticPump301.5CC1 eaBronze fitted pumps, duplex configuration, 36 gallon cast iron receiver, (2) heavy-duty 2-pole float switches, eachpump sized for 30 GPM @ 15# discharge pressure, 1/2 HP, 3500 RPM, ODP motors, dial thermometer, dischargepressure gauges & balance valves for each pump, 2" vent & overflow, 1" drain and 3" inlet.RP-1Domestic RecirculationPumpBell & GossettNBF-36B1 eaTP-1Tempered DomesticRecirculation PumpBell & GossettNBF-36B1 eaET-3Expansion TankWesselsTTA-1251 ea60 gallon tank volume, 150# ASME, pre-charged, FDA approved butyl diaphragm, 1" stainless steel systemconnection, sized at 60# system pressure, 150# maximum tank pressure, 50 F initial temperature, maximumtemperature of 170 F, and system volume of 1,350 gallons of water.TCV-1Tempering ValveHeat TimerETV1 ea3-way mixing valve, 1-1/4" system connections, stainless steel body & trim, electronic actuator, wth Heat Timercontroller and module for BMS connectivity mounted to side of MCP.Cast iron, single-seal, submersible style, sized for 50 GPM @ 27' head, 1 HP, 3450 RPM, 2" discharge, passes 3/4"solids, and 40' power cord length. Weil items shipped loose with skid to be field installed/wired: SP-1 & 2, (4) modelno. 8230 N.O. mechanical floats with 40' cord length and cover mounting bracket, and No. 8805 wet well cover with(2) 20" model no. 8817 pump opening covers.SP1ELEVATORSUMPSP2BOILER ROOMZOELLER CO.MIGHTY-MATEWEIL2445SUB.SUB,BASIN XISTINGPUMP CAPACITYGPMHEAD, FT50(2) RKSW / HIGH LEVEL ALARM2"PROVIDE COVER 8805, (2) 20"8817 PUMP OPENING COVERS,W / HIGH LEVEL ALARM,(4) 8230 FLOATS WITH 40' CORDS13TH AVENUE & UNIVERSITY STREETFD-2ITEMUNIVERSITY OF OREGON3"PUMP SCHEDULEERB MEMORIAL UNION - RENOVATION & ADDITIONPACKAGE 4SERA ARCHITECTS COPYRIGHT 2012These drawings and their content are the property of SERA Architects Inc. and are to be utilized on this project. Reproduction of any part of this material, without the express written permission of SERA Architects Inc. is prohibited.PLUMBING FIXTURES SCHEDULE3-speed, all bronze construction, 0.36 HP, 3300 PM, sized for 5 GPM @ 17' head.REVISIONS3-speed, all bronze construction, 0.36 HP, 3300 PM, sized for 10 GPM @ 27' head.1)UL listed package includes a heavy-duty, welded structural steel frame and base built to AWS D1.1 specifications. All components are pre-mounted, piped, wired, and hydro-tested before being paintedFlowTherm's standard gray, water-based enamel. All piping, pipe materials, welding procedures, valves, fittings, and hardware are in accordance with ASME B31.9 standards.2)Package includes lot interconnecting headers, piping, fittings, strainers, isolation/balance/check/relief valves, suction diffusers, thermometers, pressure gauges, flex connectors, and steam traps as shown onthe flow diagram.3)4)5)6)7)8)9)CHECKED BY:ISSUE DATE:PROJECT NO.:2014.03.1411045Domestic heat transfer system is enabled, sequenced and monitored by the Building Management System. BMS contractor to ship skid mounted controllers, temperature sensors & wells, pressure switches &sensors, flow & steam meters, BTU meters, and wiring diagrams to FlowTherm for installation and wiring at fabrication facility. Control panel for local alarms, pilot lights, disconnects, etc. is provided and wiredby FlowTherm. FlowTherm will install wiring & conduit between skid equipment and Master Control Panel. Other devices requiring remote installation are to be supplied, installed and wired by BMS contractorin the field. Steam meter shall be type that requires 5 pipe diameters up and downstream of device, similar Veris Accelabar.Power and control wiring to/from FlowTherm panel is by Div. 26 and BMS contractor, respectively.Skid dimensions shall not exceed 12.5' L x 8' H x 6' W, including the anchor chairs.42" of service clearance is required in front of the Master Control Panel.Equipment vents/drains/overflows and other system piping connections to the package are the responsibility of the installing contractor.Package does not include spring isolators, vibration eliminator mounts, special mounting brackets, special seismic construction, certification, seismic frame calculations, seismic anchorage calculations, orseismic testing, insulation for piping and components, calcium silicate pipe shields or insulated pipe supports. Skid shall be bolted to concrete floor or housekeeping pad.Condensate piping shall be sloped towards condensate return unit's inlet.SCHEDULES PLUMBINGP00150% CONSTRUCTION DOCUMENTS3/13/2014 4:00:38 PMNOTES:

SERA ARCHITECTS COPYRIGHT 2012QRSTUVWH-1W3"RDUP & DN(750 SF)WH-1223"SAN UP1 1/2"V UP900 SW Fifth Ave., Suite 1600Portland, OR 972042"SAN UP1 1/2" V UPOUTDOOR PROG.& BIKECENTER007TMJANITOR017MS-11 1/2"V UP2"FD-12"SAN UPRENTAL BIKE STORAGE007A3/4"HWR UPFF6"RD UP(5440 SF)STORAGE006A4"FS-1OFFICE015AASST. COORD.006COFFICE007BDIRECTOR006B4"SANUP & DNWC-2L-1WSP-1OFFICE012A2"V DNASUO0036"RDUP & DN(3430 SF)?CONF. STORAGE009STORAGE012E?ASUO WALK-UP COUNTER003AELEC020CSD-1ASD-1CORRIDORH0192"V DNL-1SMALL CONF010?4"SANUP & DN6"RD UP(3586 SF)6"DSN SPILLTO PLANTER(3586 SF)WC-2SUSTAINABILITY COALITION004ELEVE26"RDUP & DN(6830 SF)UP20WC-12"FD-12" SANUP & DNACCOUNTING TECH.003G6"RD UP(5300 SF)2"SAN UP1 1/2"V UPL-1SPILL ASDTO FSSTAIR 5S003WC-1?ACCOUNTANT003FSPILL 2"PD TOFLOOR SINK2"FD-14"SAN UPVENDING0192" V UP?LACTATION/ LIBRARY012DCORRIDORH004TP-2CORRIDORH015PD4"SAN DNV. SM. CONF008WC-1FIRE RISERAND GROUNDFLOOR VALVEASSEMBLY2"V UP2"V DNGENDER WC-1INCLUSIVERESTROOM014S-1SURVIVAL CENTER/ STUDENTINSURGENT005LEADERSHIP ADVISOR003EL-1L-2WC-2 G.I.018PD?4"SAN UP2"V UPUP2"SANUP & DNWH-121STOR015AA4"SAN UP1"HW UP6"RD DN(5440 SF)1"CW UP2"FD-12"CW UPOP OFFICE007BBFIRE / WATER016PD2"V UP2"FD-1STAIR 4S00219.5FTP-14"FS-12"V UPVESTIBULEV00218.82"V DNF?engineers for a sustainable future1 1/2"V UPS-1OFFICE COORDINATOR003BCIRCULATIONH0022 1/2"CW DN2" V UP2 1/2" BACKFLOWSTUDENT VETERANS CENTER0153" SAN DNERB MEMORIAL UNION - RENOVATION & ADDITIONPACKAGE 4CLUB SPORTS00620.6T. 503.227.5280F. 503.274.7674www.glumac.comJob. No.: 02.13.00545Contact: TODD KOLIBABASP1?LGBTQA02219WOMENS CENTER & SWAT0126"RD DN(5300 SF)?FC / MANIFOLD013DF-1?18VESTIBULEV003STUDENT STREETH003MEDIUM CONFERENCE ROOM023UPSTAIR 1S00417HEARTHL001WH-116.513TH AVENUE & UNIVERSITY STREETPUNIVERSITY OF OREGONThese drawings and their content are the property of SERA Architects Inc. and are to be utilized on this project. Reproduction of any part of this material, without the express written permission of SERA Architects Inc. is prohibited.NREVISIONSGROUND LEVEL FLOOR PLAN - SECTOR A - PLUMBINGSCALE: 1/8" 1'-0"3/13/2014 4:00:58 PMCHECKED BY:ISSUE DATE:PROJECT NO.:KEY PLAN(NTS)2014.03.1411045GROUND LEVEL- NORTH WING PLUMBINGP150A50% CONSTRUCTION DOCUMENTS1

SERA ARCHITECTS COPYRIGHT 2012LMNSHEET NOTES1. NEW RETAIL SPACE PROVIDE 1" COLD WATER STUB FORFUTURE T.I. WORK, PROVIDE INDIVIDUAL METERED FOR EACHRETAIL SPACE.20.612. NEW PUB LOCATION PLUMBING FIXTURES -TBD.PROVIDE 1" COLD WATER STUB FOR T.I. WORK, AND INDIVIDUALMETER.These drawings and their content are the property of SERA Architects Inc. and are to be utilized on this project. Reproduction of any part of this material, without the express written permission of SERA Architects Inc. is prohibited.3. NEW COFFEE SHOP LOCATION PLUMBING FIXTURES - TBDPROVIDE 1"COLD WATER STUB FOR T.I. WORK, AND INDIVIDUALMETER.4. 3/4" HOT WATER SUBBED FOR FUTURE T.I. WORK. PROVIDE HOTWATER METER AT EASH RETAIL SPACE.5. SEE DOMESTIC COLD WATER RISER DIAGRAM 1/P6.01 FOR NEWAND EXISTING SYSTEMS.2119.56. 1" COLD WATER STUBBED FOR FUTURE T.I. WORK., PROVIDECOLD WATER METER AT EACH RETAIL SPACE.2900 SW Fifth Ave., Suite 1600Portland, OR 97204T. 503.227.5280F. 503.274.7674www.glumac.comJob. No.: 02.13.00545Contact: TODD KOLIBABA20SP118.83engineers for a sustainable futureTMSTAIR 6 (E)S001?CARD 17.017HEARTHL001716.216UPHOLDEN T049?6HEARTH - SOUTHL001C4MARKET / COFFEE050914.216?PUB KITCHEN046A?414MARKET050A2STAIR 1 (E)S00913TH AVENUE & UNIVERSITY STREETSTAIR 6 (E)S00119TICKET OFFICE002UNIVERSITY OF OREGONCARD OFFICE001CIRCULATIONH002ERB MEMORIAL UNION - RENOVATION & ADDITIONPACKAGE 46"O" LOUNGEL005SEE SHEET P150CSEATINGL005A1VESTV005GROUND LEVEL FLOOR PLAN - SECTOR B - PLUMBING2014.03.141104512SCALE: 1/8" 1'-0"ELEV (E)E43/13/2014 4:01:18 PMCHECKED BY:ISSUE DATE:PROJECT NO.:1112.2AABBCCDDEEFFTELECOM031G GKEY PLANMEN032HHJKLM(NTS)GROUND LEVEL- HEARTH PLUMBINGP150B50% CONSTRUCTION DOCUMENTS4"GW DN

SERA ARCHITECTS COPYRIGHT 2012LMNSHEET NOTES1312.71.RECONFIGURED RESTROOMS PROVIDE NEW LOW FLOWPLUMBING FIXRUTES AND RECONNECT TO EXISTING SERVICE."O" LOUNGEL005These drawings and their content are the property of SERA Architects Inc. and are to be utilized on this project. Reproduction of any part of this material, without the express written permission of SERA Architects Inc. is EV (E)E412"FD-111.5WC-1WC-1 WC-1 AWC-2WC-1DF-1JANITOR035L-1MEN032UR-1 UR-212L-1GI1900 SW Fifth Ave., Suite 1600Portland, OR 9720411L-1T. 503.227.5280F. 503.274.7674www.glumac.comJob. No.: 02.13.00545Contact: TODD KOLIBABA10engineers for a sustainable futureTMUP9.5STAIR 3S006TECHNOLOGY LOUNGEL005CCIRCULATIONH045EXISTING PIIPING INTHIS AREA WILL NEEDTO BE REROUTED8CAMPUS DIGITAL PRINTCENTER0367CORRIDORH036SEATINGL005B65ELEVATOR (E)E3STAIR (E)S008MAIN ELECTRICAL1274NOT IN SCOPESEE PACKAGE 12" CW UP4" SAN UP1/2"TP LINE UP TOASSEMBLY ABOVE32"SAN UPPACKAGE 4SCOPE13TH AVENUE & UNIVERSITY STREETSEATINGL005BUNIVERSITY OF OREGONERB MEMORIAL UNION - RENOVATION & ADDITIONPACKAGE 49REVISIONS23/4"HW, CW UPPOC 3/4"HW, 2"CWTO EXISTING UNDERPACKAGE 1UP2"CW UP2"SAN UPSTAIR (E)S00714"SANCAPPED FOR FUTURE T.IPACKAGE 54"SAN UPCHECKED BY:ISSUE DATE:PROJECT NO.:3/13/2014 4:02:09 PM0.5FGHJCKKEY PLAN1GROUND LEVEL FLOOR PLAN - SECTOR C - PLUMBINGSCALE: 1/8" 1'-0"(NTS)2014.03.1411045GROUND LEVEL- 1962 ADDITION- PLUMBINGP150C50% CONSTRUCTION DOCUMENTS1/2"TP LINE UP TO ASSEMBLY ABOVE

SERA ARCHITECTS COPYRIGHT 2012KEYED NOTESThese drawings and their content are the property of SERA Architects Inc. and are to be utilized on this project. Reproduction of any part of this material, without the express written permission of SERA Architects Inc. is prohibited.1.#SEE SHEET P5.01 FOR PLUMBING EQUIPMENT LAYOUT.12.712.21/2"HW,2"GW UPWASTE PIPING TO BEREPLACED AND REROUTE ANY KITCHENWASTE LINES TO THENEW GREASE INTERCEPTOR900 SW Fifth Ave., Suite 1600Portland, OR 97204T. 503.227.5280F. 503.274.7674www.glumac.comJob. No.: 02.13.00545Contact: TODD KOLIBABAengineers for a sustainable futureTMPOC 1/2" HWTO EXISTING1"CW,3/4"HW,X"G UPEQUIP045E?9.5?OFFICE045D91"CW,3/4"HW,X"G UPSMALL CONFERENCE044STORAGE043B82"V UPMIXING043ACOMPUTER LAB042STUDENT RESOURCE STUDIO04371"CW,3/4"HW,X"G UPCORRIDORH036CAP 4" SAN AT MAIN6MARKETING041CALL CENTER040CORRIDORH0385ELEV MACHINE039DELEVATOR (E)E3MECHANICAL0381STAIR (E)S008413TH AVENUE & UNIVERSITY STREETRACK ROOM045FKWVA04510?UNIVERSITY OF OREGONGENERAL MGR045GERB MEMORIAL UNION - RENOVATION & ADDITIONPACKAGE 4MUSIC LIBRARY045KREVISIONS3BCDEFCHECKED BY:ISSUE DATE:PROJECT NO.:3/13/2014 4:02:31 PM12014.03.1411045GROUND LEVEL FLOOR PLAN - SECTOR D - PLUMBINGSCALE: 1/8" 1'-0"KEY PLAN(NTS)GROUND LEVEL- SOUTHWEST PLUMBINGP150D50% CONSTRUCTION DOCUMENTSA

SERA ARCHITECTS COPYRIGHT 2012These drawings and their content are the property of SERA Architects Inc. and are to be utilized on this project. Reproduction of any part of this material, without the express written permission of SERA Architects Inc. is prohibited.MNPQRSTUVW900 SW Fifth Ave., Suite 1600Portland, OR 97204T. 503.227.5280F. 503.274.7674www.glumac.comJob. No.: 02.13.00545Contact: TODD KOLIBABA3"RDUP & DN(750 SF)engineers for a sustainable futureTM2"FD-1JAN1133"V UPVSA109FAPASU KP109G223/4"HW RPZ,3/4"CW RPZPROVIDE 3/4"HW, CWMALE HOSE BIBCONNECTIONSMS-1V SMALL CONF ROOM112MEDITATION115NASU109DLARGE CONF ROOM108E504MECHA109ECORRIDORH11413/4"HWRUP & DNFSH-1WOMENS WASH1162"V UP1 1/2"V DN1"CW UPS-12"SAN UPSTAIR 4S1026"RDUP & DN(5440 SF)L-12"V UP2"V UPWC-23WC-119.5L-1MULTICULTURAL CENTER1091"CW DN4"SAN DNBWA109BMEN110MSA109L4"SAN UP2"V DNBSU109ACAER109N6"RD UP(5300 SF)2"V UP3"SAN UP1 1/2"V UPUPX"V UP & DNCSD-1ASD-1CORRIDORH118UR-23/4"HW & CWUP & DNL-13"SANUP & DNL-12"FD-1202"V DN4"SANUP & DN6"RDUP & DN(3586 SF)WC-2CORRIDORH1106"RD DN(6830 SF)6"RD DN(5300 SF)2"SAN UPUR-12"V UP6"RDUP & DN(3430 SF)18.8MEDIUM CONF ROOM1044" SANUP & DNFFUPCORRIDORH105DF-1ELEC118MCC DIRECTOR109MWSP-1WC-1WOMEN111STOR.109KUPSTAIR 5S1032"FD-1L-1CONF STORAGE107212"V DNTELECOM4"SAN E504117UP & DNMEDIUM CONF ROOM119196"RD UP(6830 SF)18BRIDGEH104SEATING121DNUP1716.51REVISIONSLEVEL 1 FLOOR PLAN - SECTOR A - PLUMBINGSCALE: 1/8" 1'-0"3/13/2014 4:02:50 PMCHECKED BY:ISSUE DATE:PROJECT NO.:KEY PLAN(NTS)2014.03.1411045LEVEL 1 - NORTHWING PLUMBINGP151A50% CONSTRUCTION DOCUMENTS1 1/2"V DN13TH AVENUE & UNIVERSITY STREETFSH-12"V DNMENS WASH114ERB MEMORIAL UNION - RENOVATION & ADDITIONPACKAGE 420.6UNIVERSITY OF OREGON1 1/2"V DN

SERA ARCHITECTS COPYRIGHT 2012These drawings and their content are the property of SERA Architects Inc. and are to be utilized on this project. Reproduction of any part of this material, without the express written permission of SERA Architects Inc. is prohibited.LMNRELOCATED GAS METER20.6GMECH103RECONNECT TO EXISTINGGAS LINE ROUTED TOTAYLOR LOUNGE FIRE PLACES213"FD-1900 SW Fifth Ave., Suite 1600Portland, OR 97204PROVIDE 1"RPZFOR HVAC MAKE UP WATERT. 503.227.5280F. 503.274.7674www.glumac.comJob. No.: 02.13.00545Contact: TODD KOLIBABAHB-119.5engineers for a sustainable futureTMSTAIR 7S110?UP2018.8ELEVE119UPSTAIR H10117TAYLOR LOUNGE10116.21615.515DNDNDNSTAIR (E)S109STAIR 2S10513TH AVENUE & UNIVERSITY STREETDNSTAIR 4S102ERB MEMORIAL UNION - RENOVATION & ADDITIONPACKAGE 4UPNEW FIRE PROTECTIONRISER, RECONNECT TO EXISTINGSYSTEMUNIVERSITY OF OREGONDUCKSTORE102REVISIONS14.214BFISHBOWL FOOD SERVICESEATING170EMU LOBBYL101DNDNCHECKED BY:ISSUE DATE:PROJECT NO.:1312.72014.03.14110453/13/2014 4:03:05 PMSEATINGL005AA1BLEVEL 1 FLOOR PLAN - SECTOR B - PLUMBINGSCALE: 1/8" 1'-0"CDEFGHKEY PLAN(NTS)LEVEL 1 HEARTH & MILLSCENTER PLUMBINGP151B50% CONSTRUCTION DOCUMENTSUP

SERA ARCHITECTS COPYRIGHT 2012LMNDNDN1312.7These drawings and their content are the property of SERA Architects Inc. and are to be utilized on this project. Reproduction of any part of this material, without the express written permission of SERA Architects Inc. is prohibited.EMU LOBBYL101FLEXIBLE SPACEL101A12.512.212SEATINGL005AELEV (E)E411.5STAIR (E)S111UPSTORAGE132VERY SMALL CONFERENCEROOM131VERY SMALL CONFERENCEROOM130900 SW Fifth Ave., Suite 1600Portland, OR 97204T. 503.227.5280F. 503.274.7674www.glumac.comJob. No.: 02.13.00545Contact: TODD KOLIBABA11engineers for a sustainable futureTM109.54"RD UPTIED OVERFLOW INTO THEPRIMARY ROOF DRAIN ON THEVERT AS PER CODE AND SIZEAT 3"/HR DOWN STREAM.3"RD/OD UP(1450 SQFT)8FOUNTAIN COURT SEATING134B4"RD DN(1450 SQFT)4"RD DN(1450 SQFT)7SEATING134C4"RD UPTIED OVERFLOW INTO THEPRIMARY ROOF DRAIN ON THEVERT AS PER CODE AND SIZEAT 3"/HR DOWN STREAM.3"RD/OD UP(1450 SQFT)6FOYERH134FOOD SERVICE VENDOR 3151ROGUE CONFERENCE ROOM(MEDIUM)1405ELEVATOR (E)E3STAIR (E)S108VERY LARGE CONFERENCEROOM146CONFERENCE STORAGE1474?UMPQUA CONFERENCEROOM (SMALL)141UR-2POC 3/4"HW,CW &TO EXISTING VERY LARGE CONFERENCEROOM1452"SAN DNL-1L-2HALLWAYH143DF-1L-1313TH AVENUE & UNIVERSITY STREET9DNUNIVERSITY OF OREGONERB MEMORIAL UNION - RENOVATION & ADDITIONPACKAGE 4STAIR 3S006WC-2TOILET1442L-1WC-1 WC-1WC-22"FD-1WHATP-2STAIR (E)S107STORAGE149A1V LARGE CONFERENCEROOM STORAGE145A4"SAN DNCHECKED BY:ISSUE DATE:PROJECT NO.:2014.03.1411045WCO3/13/20

circuit setter vacuum relief valve relief valve pressure reducing valve lubricated plug valve angle gate valve gas riser vent stacks cold water riser gate valve pressure & temperature relief valve check valve butterfly valve symbol description gw grease waste hot water circ (110 f) hot water (120 f) 140 140 g natural gas (7"w.c.) fco floor .

Related Documents:

3 www.understandquran.com ‡m wQwb‡q †bq, †K‡o †bq (ف ط خ) rُ sَ _ْ یَ hLbB َ 9 آُ Zviv P‡j, nv‡U (ي ش م) اْ \َ َ hLb .:اذَإِ AÜKvi nq (م ل ظ) َ9َmْ أَ Zviv uvovj اْ ُ Kَ hw ْ َ Pvb (ء ي ش) ءَ Cﺵَ mewKQy ءٍ ْdﺵَ bِّ آُ kw³kvjx, ¶gZvevb ٌ یْ"ِKَ i“Kz- 3

A-Level Business Studies Question and Answers 2020/2021 All copyright and publishing rights are owned by S-cool. First created in 2000 and updated in 2013, 2015 & 2020. 2 Contents People in the Workplace (Questions) . 3 People in the Workplace (Answers) . 4 Budgeting, Costing and Investment (Questions). 6 Budgeting, Costing and Investment (Answers) . 7 Business Objectives and .

counseling appointments. ontact Army hild Youth Services re-garding hourly childcare. an I see another provider? Absolutely. After your appointment, please speak with a MSA and they will be happy to assist you in scheduling an appointment with another provider. Frequently Asked Questions

Artificial Intelligence (AI) is growing at a great pace and is spreading across many industry sectors. AI as a concept was first coined in the 1950s and has been the basis for a plethora of science fiction novels and movies. Now, 60 years later, AI is rapidly entering nearly every industrial sector and is increasingly embedded into modern society. The UK government is dedicated to advancing .

While opening an AutoCAD 2000 drawing, you can use the Partial Open option to work with only part of the drawing file. If you are working with a large drawing, you can partially open the drawing and select a specific view and layers to work with instead of loading the entire drawing. See “Using Par- tial Open and Partial Load” on page 311. To open a drawing 1 In the Startup dialog box .

Rumki Basu, Introduction to Public Administration Suggested Readings : Mohit Bhattacharya, Public Administration : Structure Process and Behaviour Felix Nigro, Modern Public Administration Prasad and Prasad, Administrative Thinkers, Sterling Publications. Amita Singh, Public Administration : Roots and Wings, New Delhi Galgotia

38 Application to single member companies of enactments and rules of law PART 4 A COMPANY’S CAPACITY AND RELATED MATTERS Capacity of company and power of directors to bind it 39 A company’s capacity 40 Power of directors to bind the company 41 Constitutional limitations: transactions involving directors or their associates

The AP Biology Curriculum is framed around the AP Biology course and Exam Description Effective Fall 2019 where 4 Big Ideas serve as the foundation of the course and allow student to create meaningful connections among course concepts. There is a set of core concepts called Enduring Understanding, which will be used to guide the AP Biology