ITT - Xylem Water Solutions & Water Technology Xylem US

2y ago
17 Views
2 Downloads
1.34 MB
56 Pages
Last View : 22d ago
Last Download : 3m ago
Upload by : Asher Boatman
Transcription

IT TGoulds PumpsG&L SERIESMODEL SSVInstallation, Operation andMaintenance InstructionsGoulds Pumps is a brand of ITT Corporation.www.goulds.comEngineered for lifeCommercial Water

SUBJECTPAGESSV Product Line Numbering System .3Safety Instructions .5Overview.5Product Description.5Applications .5Pre-Installation Checks .5Transportation and Storage.6Installation .7Start-Up.9Operation .10Maintenance.10Mechanical Seal Replacement (Sizes 1SV-4SV) .10Mechanical Seal Replacement (Sizes 33SV-92SV) .11Mechanical Seal Replacement (Sizes 33SV-92SV) Fitted with Cartridge Seals .13Motor Replacement.13Troubleshooting .13Engineering Data .14Typical Plumbing and Installation .14SSV Major Components .15DPS Versions .17Limited Warranty .18Declaration of Conformity .56Pump Model Number:Pump Serial Number:Control Model Number:Dealer:Dealer Phone No.:Date of Purchase:1SV2SVInstallation:Current Readings at ERIES/SÉRIE/SERIES3SV33SV4SV46SV66SV92SV

SSV PRODUCT LINE NUMBERING SYSTEMThe various versions of the SSV line are identified by a product code number on the pump label. This number is also the catalog number for the pump. Themeaning of each digit in the product code number is shown below. Note: Not all combinations are possible. Consult your G&L Pumps distributor.MODEL NOMENCLATURE (Sizes 1SV - 4SV)2 SV A 1 D 2 B 0 H EXAMPLE PRODUCT CODEH Horizontal Mount VIC Victaulic Connection (1SVB/D – 4SVB/D only)Mechanical Seal Options:Code No.0246RotaryHigh DutyCarbonSilicon CarbideGraphite FilledSilicon CarbideGraphite FilledHigh DutyCarbonNumber of Stages:B 2 F 6 KC 3 G 7 LD 4 H 8 ME 5 J 9 N 10 11 12 13StationarySiliconCarbideGraphiteFilledPQRT 14 15 16 18ElastomerReference ApplicationVitonGeneral ServiceEPRBoiler FeedVitonAbrasiveEPRHigh TemperatureV 20X 22Z 24Driver:(50 Hz, no single phase number 0, 1, 4)1 1PH ODP2 3PH ODP3 575V ODP4 1PH TEFCHP Rating:C ½ F 1½D ¾ G 2E 1 H 35 3PH TEFC6 575V TEFC7 3PH XP8 575V XPJ 5K 7½L 109 3PH TEFC with premium efficiency0 1PH XPM 15N 20P 25Hertz/RPM:1 60 Hz/3500 RPM2 50 Hz/2900 RPM, 190-380 V, (50 Hz motor)3 60 Hz/3500 RPM, 380 V4 50 Hz/2900 RPM, 460 V5 60 Hz/3500 RPM, 220-380 V, D.O.L.6 60 Hz/3500 RPM, 380 V, Y-DELTAMaterial and Suction/Discharge:A 304 stainless steel, in-line NPT threaded oval flange connections (1, 2, 3 only)B 304 stainless steel, in-line ANSI flange (1, 2, 3, 4SV)C 304 stainless steel, top/bottom ANSI flange connectionsD 316 stainless steel, in-line ANSI flangeProduct Line: Stainless VerticalNominal Flow:1 15 GPM 3 55 GPM2 28 GPM 4 86 GPMAlways specify the unit model and catalog number from pump nameplate when service ortechnical assistance is required.NOTICE: INSPECT UNIT FOR DAMAGE AND REPORT ALL DAMAGE TO THE CARRIEROR DISTRIBUTOR/DEALER IMMEDIATELY.3

SSV PRODUCT LINE NUMBERING SYSTEMMODEL NOMENCLATURE (Sizes 33SV - 92SV)The various versions of the SSV line are identified by a product code number on the pump label. This number is also the catalog number for the pump. Themeaning of each digit in the product code number is shown below. Note: Not all combinations are possible. Consult your G&L Pumps distributor.33 SV B G 1 2 R 6 T A H EXAMPLE PRODUCT CODEPump Options (optional):H Horizontal mountingQ 1.0 Service Factor Version (AQ)D High Pressure Pump (DPS)T Alternative Motor FrameSeal Options:Mechanical SealCartridge SealCode No.ABCDLPRotaryStationaryCarbonSilicon CarbideSilicon CarbideCarbonSilicon CarbideElastomersVitonEPRVitonEPRVitonEPR– Metal parts on all seals are 316SS.– Silicon carbide is graphite filled.Motor Enclosure:D ODPX Explosion ProofT TEFCP TEFC Premium EffyMotor Voltage:1 115/2303 230/4602 2304 460HP Rating:G 2 HPH 3 HPJ 5 HPK 7½ HPL 10 HPM 15 HPN 20 HPP 25 HPQ 30 HPR 40 HP5 5756 208-230/4607 2008 190/380S 50 HPT 60 HPU 75 HPMotor Hertz/Speed/Phase:1 60 Hz/3500/14 60 Hz/1750/32 60 Hz/3500/35 50 Hz/2900/13 60 Hz/1750/16 50 Hz/2900/37 50 Hz/1450/18 50 Hz/1450/39 60 Hz/Variable/3Number of Reduced Impellers (can be 0, 1, 2) *Total Bowls/Stages:A 1E 5J 9B 2F 6K 10C 3G 7D 4H 8Flange Orientation:B Cast Iron/316 stainless steel, in-line ANSI flangeD 316 stainless steel, in-line ANSI flangeProduct Line:Stainless Vertical VerticalNominal Flow:33 150 GPM46 225 GPM66 350 GPM92 450 GPM* NOTE: Indicates number of reduced diameter impellers in the total staging.(Two would indicate 2 reduced diameter impellers.)4

SAFETY INSTRUCTIONSTO AVOID SERIOUS OR FATAL PERSONAL INJURYOR MAJOR PROPERTY DAMAGE, READ ANDFOLLOW ALL SAFETY INSTRUCTIONS IN MANUALAND ON PUMP.THIS MANUAL IS INTENDED TO ASSIST IN THEINSTALLATION AND OPERATION OF THIS UNITAND MUST BE KEPT WITH THE PUMP.This is a SAFETY ALERT SYMBOL.When you see this symbol on the pumpor in the manual, look for one of thefollowing signal words and be alertto the potential for personal injury orproperty damage.DANGER Warns of hazards that WILL causeserious personal injury, death or majorproperty damage.WARNING Warns of hazards that CAN causeserious personal injury, death or majorproperty damage.CAUTION Warns of hazards that CAN cause personal injury or property damage.NOTICE: INDICATES SPECIAL INSTRUCTIONSWHICH ARE VERY IMPORTANT ANDMUST BE FOLLOWED.THOROUGHLY REVIEW ALL INSTRUCTIONSAND WARNINGS PRIOR TO PERFORMING ANYWORK ON THIS PUMP.MAINTAIN ALL SAFETY DECALS.WARNINGUNIT NOT DESIGNED FOR USEWITH HAZARDOUS LIQUIDS ORFLAMMABLE GASES. THESEFLUIDS MAY BE PRESENT INCONTAINMENT AREAS.Hazardous fluidscan cause fire,burns or death.The purpose of this manual is to provide the necessary information for proper installation, operation andmaintenance of the SSV pump. The instructions andwarnings provided below concern the standard version,as described in the sale documents. Special versions maybe supplied with supplementary instructions leaflets.Please refer to the sale contract for any modifications orspecial version characteristics. Always specify the exactpump type and identification code when requestingtechnical information or spare parts from our Sales andService department. For instructions, situations or eventsnot considered in this manual or in the sale documents,please contact your distributor.Read this manual before installing and using the product.Improper use may cause personal injury anddamage to property and lead to the forfeiture ofthe warranty coverage.The SSV pump is a vertical multistage, non-self primingpump which can be coupled to standard electric motors.For the pump sizes 1SV-4SV, all the metal parts that arein contact with the pumped liquid are made of stainlesssteel. They are available in different versions accordingto the position of the suction and delivery ports and theshape of the connection flanges. For the sizes 33SV-92SV,some of the metal parts in contact with the pumpedliquid are made of stainless steel, others are made ofcast iron. A special version is available, in which all themetal parts in contact with the pumped liquid are madeof stainless steel. If you purchase a pump without theelectric motor, make sure that the motor you use is suitable for coupling to the pump. The 33SV-92SV pumpsare equipped with a special mechanical seal designedfor easy replacement without having to disassemble theentire pump.These pumps are suitable for civil and industrial waterdistribution systems, pressure booster, irrigation (agriculture, sporting facilities), water treatment, boiler feed,parts washing, cooling - air conditioning - refrigerationand fire fighting applications.G&L PumpsSSV 31CATALOG NUMBER25GPMFEETRPMDO NOT OPERATE AT CLOSED DISCHARGEGoulds Pumps, ITT Industries, Inc.478612345678Goulds Pumps Catalog NumberCapacity RangeTDH RangeRated SpeedRated HorsepowerMaximum Operating PressureMaximum Operating TemperaturePump Serial NumberConfirm that the pump is capable of meeting the desiredoperating conditions.1. MINIMUM INLET (SUCTION) PRESSUREIn general, the minimum suction pressure requiredis that which provides adequate NPSHA necessary tofeed the pump. The required NPSHr, expressed infeet, can be found on the performance curve for thepump at the specific duty point. It is recommendedthat the NPSHA exceeds the NPSHr by a minimumof (2) two feet as a safety margin and to insure longterm reliable performance of your SSV pump.PSMIN NPSHr 2 ft.NOTE: THE NPSHA MUST BE CALCULATED FORTHE SPECIFIC SYSTEM TO WHICH THESSV PUMP IS TO BE INSTALLED. PLEASECONTACT YOUR DEALER/DISTRIBUTOR IFYOU REQUIRE ASSISTANCE.5

2. MAXIMUM INLET PRESSUREThe following table shows the maximum permissibleinlet pressure. However, the actual inlet pressure pressure against a closed valve must always be lowerthan the maximum permissible operating pressure.Pump1SV2SV3SV4SV33SV46SV66SV92SVNumberof Stages2-16 Stages17-22 Stages2-15 Stages16-22 Stages2-13 Stages14-16 Stages2-10 Stages11-12 Stages1-10 Stages1-10 Stages1-6 Stages1-6 StagesMaximumInlet Pressure250 psi (17 bar)250 psi (17 bar)250 psi (17 bar)250 psi (17 bar)250 psi (17 bar)250 psi (17 bar)250 psi (17 bar)250 psi (17 bar)Pump Size1SV 2SV 3SV 4SV61217Min. Flow 3500 RPM 3(gpm)2900 RPM 361014Pump Size33SV 46SV 66SV 92SV4070 100Min. Flow 3500 RPM 35(gpm)2900 RPM 8101420NOTE: If this cannot be archived, then a bypass/recirculate line is recommended.Do not run the pump against a closeddischarge for longer than a few seconds.250 psi (17 bar)(staging at 3500 RPM)SeriesAt 250º FPSI / Bar2-16 Stages325 / 251SV17-22 Stages580 / 402-15 Stages325 / 252SV16-22 Stages580 / 402-13 Stages325 / 253SV14-16 Stages580 / 402-10 Stages325 / 254SV11-12 Stages580 / 401-6 Stages362 / 2533SV7-10 Stages580 / 401-5 Stages362 / 2546SV6-10 Stages580 / 401-5 Stages362 / 2566SV6 Stages580 / 4092SV1-5 Stages362 / 25NOTE: Oval flange (1-3SV) maximum workingpressure is 232 psi (16 bar).4. TEMPERATURE CAPABILITYThe SSV pump is capable of pumping liquids withinthe below temperature range:-22º F to 250º F (-30º C to 120º C)-22º F to 250º F (-30º C to 120º C)NOTE: In order to provide adequate cooling for theelectric motor, the ambient temperature mustbe 32º F to 104º F and the relative humidity at104º F must not exceed 50%.For temperatures above 104º F and for installationssites located at elevation in excess at 3000 feet abovesea level it may be necessary to derate the motorperformance. Please contact your distributor/dealer forassistance.6For continuous operation the minimum flow raterecommended is specified below.WARNING3. MAXIMUM OPERATING PRESSURE1-4SV33SV-92SV5. MINIMUM NOMINAL FLOW RATETo prevent overheating of the internal pump components, make sure that a minimum water flow isalways guaranteed when the pump is running.6. NUMBER OF STARTS PER HOURFor electric pumps coupled to motors supplied byGoulds Pumps, the maximum number of work cycles(starts and stops) in one hour are as follows:3/4-3HP5-1015-2025-75# of Starts555For more details, refer to technical manual.5If you use a different motor fromthe standard one supplied by GouldsPumps, please consult with the motor manufacturerto find out the maximum number of work cyclesallowed.WARNING7. POWER SUPPLY REQUIREMENTSWARNING Make sure that the supply voltagesand frequencies are suited to thecharacteristics of the electric motor. Check themotor rating plate.In general, the supply voltage tolerances for motoroperation are as follows:HzPhase606060133UNV230230 / 460460 %1010101. TRANSPORTATION AND HANDLING OFPACKED PRODUCTThe SSV pump is packed in cartons or woodencrates having different dimensions and shapes.Some cartons (the supporting baseis made of wood) are designed to betransported and handled in the vertical position.Other cartons, as well as the wooden crates, aredesigned to be transported and handled in the horizontal position. Protect the product against humidity, heat sources and mechanical damage (collisions,falls, .). Do not place heavy weights on the cartons.WARNING

Lift and handle the product carefully,using suitable lifting equipment. Observe allthe accident prevention regulations.When you receive the pump, check the outside ofthe package for evident signs of damage. If the product bears visible signs of damage, notify our distributor within 8 days from the delivery date.2. ANCHORINGThe pump must be anchored securely with bolts toa concrete foundation or equivalent metal structure(shelf or platform). If the pump is large-sized andneeds to be installed near rooms inhabited by people,suitable vibration-damping supports should be provided to prevent the transmission of the vibrationsfrom the pump to the reinforced concrete structure.The dimensions of the pump base and anchoringholes are shown.3. UNPACKING THE PRODUCTUse suitable equipment. Observe all theaccident prevention regulations in force. Liftand handle the product carefully, usingsuitable lifting equipment.When you receive the pump, check the outside ofthe package for evident signs of damage. If the product bears visible signs of damage, notify our distributor within 8 days from the delivery date.The installation operations must be carriedout by qualified and experienced personnel.Use suitable equipment and protections.Observe the accident prevention regulations in force.Always refer to the local and/or national regulations,legislation and codes in force relating to the selection of the installation site and the water and powerconnections.1. SITE SELECTIONMake sure that no obstructions or obstacles hinderthe normal flow of the cooling air delivered by themotor fan. Make sure there is adequate clearancearound the pump for the maintenance operations.Whenever possible, raise the pump slightly fromthe level of the floor. See the figures below and atthe top of the next column for possible installationconfigurations. Horizontal operation requires specialmounting with a horizontally configured pump.L27.09 (180)8.46 (215) 9.44 (240)10.44 (265)L35.91 (150)7.48 (190) 8.66 (220)9.44 (240)9.65 (245) 11.42 (290)12.4 (315)L4ØA0.50 (13)0.60 (15)N4øAxNL44. HANDLING THE PRODUCTLift and handle the product carefully, usingsuitable lifting equipment. Observe theaccident prevention regulations in force.The product must be securely harnessed for liftingand handling. Some electric pumps have eyeboltsthat can be used for this purpose.L11SV 2SV 3SV 4SV 33SV 46SV 66SV 92SVInches (mm)3.94 (100) 5.12 (130) 6.69 (170)7.48 (190)L22. STORING THE PACKED PRODUCTAmbient temperature 32º F to 104º F.Short Term: (Less than 6 months) Goulds Pumpsnormal packaging procedure is designed to protectthe pump during shipping. Upon receipt, store in acovered and dry location.Long Term: (More than 6 months) Rotate shaftseveral times every 3 months. Refer to driver andcoupling manufacturers for their long term storageprocedures. Store in a covered dry location.L1L33. ANGULAR ALIGNMENTAngular alignment of the suction and dischargeflanges can best be accomplished using calipers at thebolt locations. See figure below.NOTICE: DO NOT DRAW PIPING INTO PLACE BYFORCING THE PUMP SUCTION OR DISCHARGE CONNECTIONS.7

4. PIPINGDischarge and suction piping should be no smallerthan the respective pump opening and should bekept as short as possible, avoiding unnecessary fittings to minimize friction losses.NOTICE: PIPING MUST BE INDEPENDENTLY SUPPORTED AND NOT PLACE ANY PIPINGLOADS ON THE PUMP.If suction piping larger than pump suction is required, an eccentric pipe reducer, WITH THESTRAIGHT SIDE UP, must be installed at the pumpsuction.If the pump is installed below the liquid source,install a full flow isolation valve in the suction pipingfor pump inspection or maintenance.NOTICE: DO NOT USE THE ISOLATION VALVEON THE SUCTION SIDE OF THE PUMPTO THROTTLE PUMP. THIS MAY CAUSELOSS OF PRIME, EXCESSIVE TEMPERATURES, DAMAGE TO PUMP AND VOIDWARRANTY.If pump is installed above the liquid source, the following MUST be provided:To avoid air pockets, no part of the suction piping should be above the pump suction.On any horizontal piping sections, slope pipingupward from liquid source.All suction pipe joints MUST be airtight.Use a foot valve for priming, or for holdingprime during intermittent duty.The suction strainer or suction bell MUST be at least3 times the suction pipe diameter.Insure that the size and minimum liquid submergence, over the suction inlet, is sufficient to preventair from entering through a suction vortex. See typical suction piping Figures 1 through 4.Install a discharge check valve, suitable to handle theflow and liquids, to prevent backflow.Install an appropriately sized gate valve, AFTER thedischarge valve, to regulate the pump capacity, forpump inspection and for maintenance.When a pipe increaser is required, install betweenthe check valve and the pump discharge.5. SHAFT ALIGNMENT – MOTOR TO PUMPWhen the pump is purchased less motor, the pumpwill be supplied with a motor assembly shim positioned between the motor adapter and the coupling.To assemble the motor to the pump remove theplastic shipping straps, the 2 stainless steel couplingguard halves, and the expanded polyurethane.Insure that the motor assembly shim is properly positioned between the coupling and the motor adapter.If the motor assembly shim is not available, a 0.203"(5 mm) shim may be used to locate the pump shaftassembly and to set the correct height. See figuresbelow.0.203"(5 mm)0.203"(5 mm)ShimH min.H min.DDFigure 1H Min. Submergence in feetHD8Dmin.4Dmin.H min.3D3D2min.Figure 383D161514131211109876543210Figure 21 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 VV Velocity in feet per second GPM x 0.321 GPM x 0.4085AreaD2Figure 4For motor frame sizes 213TC and larger, attach themotor adapter flange to the motor using 4 hex capscrews. Torque to values shown in the “ENGINEERING DATA” section of this manual.Loosen the 4 coupling socket head screws enoughto provide an adequate opening in the coupling toreceive the motor shaft.With an adequately sized crane, carefully lowerthe motor assembly onto the pump motor adapterand into the coupling. Secure the 4 motor hex capscrews, torquing to the value provided in the “ENGINEERING DATA” section of this manual.Torque the 4 coupling socket head screws to thevalue provided in “ENGINEERING DATA” sectionof this manual. After assembly, the gap between thecoupling halves should be equal.

Single Phase Motors – Connect the BLACK wire tothe BLACK motor wire. Connect the WHITE wireto the WHITE motor wire. Connect the GREENwire to the GREEN motor wire.Three Phase Motors – See figure below.208-230V 3/60In case of connection to the water system, the regulations issued by the competent authorities (municipal, public utility company) must be observed.Authorities often require the installation of a backflow prevention device, such as a disconnector, checkvalve or disconnection tank.2. WIRING AND GROUNDINGInstall, ground and wire accordWARNINGing to local and National Electrical Code requirements.Install an all leg disconnectswitch near pump.Hazardous voltagecan shock, burn orcause death.Disconnect and lockout electrical power before installing orservicing pump.Electrical supply MUST match pump’s nameplate specifications. Incorrect voltage can causefire, damage motor and voids warranty.Motors equipped with automatic thermal protectors open the motor’s electrical circuit whenan overload exists. This can cause the pump tostart unexpectedly and without warning.75L172L283L39MOTOR LEADS1MOTOR LEADS1. WATER CONNECTIONThe water connections must be made by qualifiedinstallation technicians in compliance with the regulations in force.48691L12L2L33GGPOWER CABLE LEADSRemove the motor assembly shim and retain forfuture use.Install the 2 coupling guard halves.460V 3/60456POWER CABLE LEADSFor the 33 through 92SV sizes using a cartridge seal,after coupling bolts have been properly torqued,there are four set screws on the collar of the cartridge seal that require tightening before removingthe shim. The four hex head set screws require a 1/8"allen wrench and are to be tightened hand-tight approximately 5 lbs.-ft. (7 N m).THREE PHASE MOTOR WIRING DIAGRAMNOTICE: UNIT ROTATION IS DETERMINED WHENVIEWED FROM MOTOR END. SEE PAGE 17FOR MOTOR ROTATION DETAIL. INCORRECT ROTATION MAY CAUSE DAMAGE TOTHE PUMP AND VOIDS WARRANTY.Check pump rotation by observing the motor fan orthe coupling THROUGH the coupling guard. DONOT confuse the flow arrows, stamped on the pumpbody, with the rotation arrows on the coupling andmotor adapter. Three phase motors only – If rotationis incorrect, have a qualified electrician interchangeany two of the three power cable leads.3. PRIMING/VENTINGFor installations with the liquid level above the pump:Close the discharge valve.Remove the vent plug.For models 1SV and 2SV only, it is necessary tofully unscrew the pin located in the drain plug.See figure below.Use only stranded copper wire to motor and ground.Wire size MUST limit the maximum voltage drop to10% of the motor nameplate voltage, at the motorterminals. Excessive voltage drop will affect performance and void motor warranty. The ground wiremust be at least as large as the wires to the motor.Wires should be color coded for ease of maintenance.Three phase motors require all leg protection withproperly sized magnetic starters and thermal overloads.WARNINGHazardousvoltagePERMANENTLY GROUND THEPUMP, MOTOR AND CONTROLSPER NEC OR LOCAL CODESBEFORE CONNECTING TOELECTRICAL POWER. FAILURETO DO SO CAN CAUSE SHOCK,BURNS OR DEATH.Connect the electrical leads to the motor, as follows:DRAIN PLUGWITH PIN CLOSEDDRAIN PLUGWITH PIN OPENFor sizes 33SV-92SV the vent plug is suppliedwith an internal needle valve, so it is not necessary to remove the vent plug. Simply unscrewthe needle valve half way to open the valveto allow air to escape. (For sizes 33SV-92SV,if the pump is supplied with a cartridge seal,remove the vent plug located on the gland platebeneath the coupling.)Open the suction valve until liquid flows out ofthe vent plug opening.9

NOTE: Place a loose rag over the open vent port to prevent large amounts of liquid from being sprayedon the pump and adjacent equipment.Make sure that the drained liquid does notcause damage or injuries.Care should be exercised if youare pumping hot water or chemicals to avoid personal injury.After stabilizing the system at normal operatingconditions, check piping for correct alignments. Ifnecessary, adjust pipe supports.Install and torque the vent plug to the valuesprovided in the “ENGINEERING DATA” section of this manual. Close the drain plug pin(1SV and 2SV only) and open the dischargevalve.WARNING HAZARDOUS MACHINERY.CAUTIONHazardousmachineryFor installations with the liquid level below thepump:See the “ENGINEERING DATA” section in thismanual for the recommended maximum pump startsper hour.Install foot valve at suction end.For models 1SV and 2SV only, it is necessary tofully unscrew the pin located in the drain plug.See figure on previous page.WARNING DISCONNECT AND LOCKOUTWith the provided plastic funnel, completely fillthe casing with liquid.HazardousvoltageInstall and torque the vent plug, close the drainplug pin (1SV and 2SV only) and open the suction valve.Recommended Motor Bearing Lubrication IntervalsHazardous machinerycan cause personalinjury or death.Start the pump, keeping the on-off valve downstream from the pump closed. Open the on-offvalve gradually. The pump must run smoothly andnoiselessly. If necessary, reprime the pump. Checkthe current absorbed by the motor and, if necessary, adjust the setting of the thermal relay. Any airpockets trapped inside the pump may be released byloosening the fill plug, for the 1SV-4SV pumps, or byturning the air screw for the 33SV-92SV pumps.If a pump installed in a locationwhere freezing may occur remainsinactive, you must drain it through the drain plugs.This operation is not necessary if a suitable antifreeze has been added to the water.WARNING10IntervalService Environment1 – 2 YearsLight Duty in Clean Atmosphere1 Year8 – 16 hours/day – Clean, Dry Atmosphere6 Months12 – 24 hours/day – Moisture Present3 Months12 – 24 hours/day – Dirty, High MoistureWhen lubricants are operated at elevated temperatures, the lubrication frequency should be increased.DO NOT intermix grease bases (lithium, sodium,etc.). Completely purge old grease if changing greasebase.NOTICE: PUMP MUST BE COMPLETELY PRIMEDBEFORE OPERATION.Extreme heat cancause personal injuryor property damage.ELECTRICAL POWER BEFOREATTEMPTING ANY MAINTENANCE. FAILURE TO DO SOCAN CAUSE SHOCK, BURNS ORDEATH.MOTOR LUBRICATION4. OPERATIONWARNING DO NOT OPERATE UNIT WITHOUT SAFETY GUARD IN PLACE.TO DO SO CAN CAUSE SEVEREPERSONAL INJURY.WARNING DO NOT OPERATE PUMP AT ORNEAR ZERO FLOW. TO DO SOCAN CAUSE EXTREME HEAT,DAMAGE TO THE PUMP, INJURYOR PROPERTY DAMAGE.MOTOR THERMAL PROTECTORS CAN RESTART MOTORUNEXPECTEDLY AND WITHOUT WARNING, CAUSINGSEVERE PERSONAL INJURY.Over greasing can cause excessive bearing temperatures, lubricant and bearing failure.0MECHANICAL SEAL OPTIONSCodeNo.Rotary0High DutyCarbonSilicon CarbideGraphite FilledSilicon CarbideGraphite FilledHigh EPRBoiler FeedVitonAbrasiveEPRHigh Temp.1. Close all necessary suction and discharge valves.2. Drain the liquid from the pump by removing thelower drain plug and the upper vent plug.3. Remove the coupling guards, the 4 coupling hexcap screws, the coupling and coupling drive pin.4. Remove the 4 motor hex cap screws. On unitswith motor frames 213TC and larger, remove the4 motor adapter flange hex cap screws. With an

adequately sized crane, carefully remove the motor. DO NOT rest the motor on the motor shaft.17. With an adequately sized crane, carefully lowerthe motor onto the motor adapter, lining up theelectrical conduit connection and the 4 motoradapter bolt holes, as required.5. Remove the 4 tie rod nuts and lock washers.6. Carefully remove the motor adapter by sliding itup the pump shaft. Larger units may require anadequately sized crane to lift the motor adapter.DO NOT damage the shaft.18. Install the 4 motor hex cap screws, torquing to thevalue provided in the “ENGINEERING DATA”section of this manual.19. Place the coupling drive pin into the pump shaftand install the coupling halves onto the motor andpump shafts. Install the 4 coupling socket headscrews, lock washers and nuts, DO NOT tighten.NOTICE: EDGES OF THE STAINLESS STEEL PARTSARE SHARP. WEAR APPROPRIATE PROTECTIVE CLOTHING.7. To gain access to the mechanical seal, it is necessary to remove the stainless steel upper platewhich is held in place by an O-ring located underthe plate rim. Place a small block of wood againstthe underside of the rim and, while movingaround the rim, tap with a mallet against the blockuntil the upper plate loosens. Remove the upperplate and O-ring from the pump casing. Discardthe

Goulds Pumps G&L SERIES MODEL SSV Installation, Operation and Maintenance Instructions Goulds Pumps is a brand of ITT Corporation. www.goulds.com Engineered for life Commercial Water. 2 SERIES/SÉRIE/SERIES 1SV 3SV 33SV 66SV 2SV 4SV 46SV 92SV Pump Mo

Related Documents:

ITT TECHNICAL INSTITUTE, INDIANAPOLIS, IN ID CODE 00016040(MC) ITT TECHNICAL INSTITUTE, SPOKANE VALLEY, WA ID CODE 00016074(MC) Subject: Show-Cause Directive Letter . The Council, at its recent meeting, reviewed the responses provided by ITT Educational Services, Inc. (ITT) to multiple sources of adverse information since 2014 regarding a .

About ITT and This 2019 Sustainability Report ITT Inc. is a publicly owned company traded on the New York Stock Exchange under the symbol "ITT." We serve the transportation, industrial, and oil and gas markets around the world by providing highly engineered critical components and customized technology solutions. Our

The purpose of ITT's Supplier Expectation Protocols is to provide ITT suppliers clear expectations of conduct across legal, regulatory, company policy and business paradigms. This forms the foundation for cooperation between ITT and its suppliers towards the goal of achieving all performance, quality and sustainability objectives. This document

Hutchinson-Barry Controls 13636 Hutchinson-ESPA, JPR, Stillman, LJF F0215,FAEG6,95727,F0229 Hutchinson-Paulstra Vibrachoc F6172,F0220 Ipeco K9075 ITT Aerospace Controls 73760 ITT-Electrofilm 85932 ITT-Enidine 24403,3P7Q0 ITT-Industrial Tube 26831 Jenoptik D3683 JetSeal 0HRD8 Kirkhill 75345 Koito S5006 Korry 81590,15084 Lamart-incl Orcon 23788 .

Features of Xylem Narrow tubes allow capillarity to transport water in an unbroken column. Gaps in the lignin (pits) allow water to leak out into neighbouring xylem or plant tissues. Lignin rings/spirals allow xylem to stretch as branch grows or bends. Lack of cell contents or end walls allow water to flow easily.

Goulds Pumps G&L Series SSH S & M-Group 316 Stainless Steel End Suction Pumps Bombas de Succión Final de 316 Acero Inoxidable Grupo-M y S Goulds Pumps is a brand of ITT Residential and Commercial Water. Goulds Pumps es una marca de fábrica de ITT Agua Residencial y Industrial. www.

Goulds Pumps is a brand of ITT Residential and Commercial Water. Goulds Pumps es una marca de fábrica de ITT Agua Residencial y Comercial. www.goulds.com Engineered for life Goulds Pumps G&L Series NPE 316L SS NPE Series End Suction Centrifugal Pumps Bombas Centrífugas de

The Asset Management Framework table below (Figure 1) encompasses these key documents and illustrates the local and national influences and dependencies that are in place to deliver these services. 3.2 As well as linking in with the City Council’s own vision and objectives, the framework shows the link with the wider objectives of Greater Manchester Combined Authority (GMCA) via its .