LangleyProceduralRequirementsLPR 1710.40 N-1Effective Date: August 27, 2019Expiration Date: August 27, 2024Subject: Langley Research Center Pressure Systems HandbookResponsible Office: Safety and Mission Assurance OfficeTABLE OF CONTENTSPREFACE . 31.PURPOSE, APPLICABILITY, AND EXCLUSIONS . 62.GENERAL REQUIREMENTS . 123.APPROVALS . 144.WAIVERS AND INTERPRETATIONS . 155.DESIGN OF NEW PRESSURE SYSTEMS (GROUND-BASED) . 166.FABRICATION OF NEW PRESSURE SYSTEMS (GROUND-BASED) . 187.MODIFICATIONS AND REPAIRS TO PRESSURE SYSTEMS (GROUNDBASED) . 198.PROCUREMENT OF PRESSURE SYSTEMS (GROUND-BASED) . 209.DESIGN, FABRICATION, AND PROCUREMENT OF FLIGHT-GRADEPRESSURE SYSTEMS . 2210.INSPECTION AND TESTING OF PRESSURE SYSTEMS (GROUND-BASED)2311.VERIFICATION AND SHAKEDOWN OF PRESSURE SYSTEMS (GROUNDBASED) . 2612.CERTIFICATION AND RECERTIFICATION OF PRESSURE SYSTEMS(GROUND-BASED). 2813.OPERATIONS AND MAINTENANCE OF PRESSURE SYSTEMS (GROUNDBASED) . 2914.DOCUMENTATION AND CONFIGURATION CONTROL OF PRESSURESYSTEMS . 3115.SUPPLEMENTAL REQUIREMENTS APPLICABLE TO SYSTEMS ANDCOMPONENTS . 3216.RESPONSIBILITIES . 42APPENDIX A. DEFINITIONS . 46Page 1 of 67Verify the correct version before use by checking the LMS Web site.

August 27, 2019LPR 1710.40 N-1APPENDIX B. ABBREVIATIONS AND ACRONYMS . 49APPENDIX C. BEST PRACTICES FOR PRESSURE SYSTEM DESIGN,INSTALLATION, AND OPERATION . 52APPENDIX D. PRESSURE RATING OF METALLIC SEAMLESS PIPING . 55APPENDIX E. PRESSURE RATING OF METALLIC SEAMLESS TUBING . 62APPENDIX F. RECOMMENDED PRACTICE FOR THE ESTABLISHMENT OFHAZARD PERIMETERS FOR PNEUMATIC TESTING . 65Page 2 of 67Verify the correct version before use by checking the LMS Web site.

August 27, 2019LPR 1710.40 N-1PREFACEP. 1PURPOSEThis Langley Procedural Requirement (LPR) implements the requirements of NASAPolicy Directive (NPD) 8710.5, “Policy for Pressure Vessels and Pressurized Systems,”and is part of the Langley Management System (LMS). It establishes requirements andstandards for pressurized systems within the framework of Langley Research Center(LaRC) safety policies and constraints. It provides a basis for safety and uniformity inthe design, procurement, fabrication, and use of pressure vessels, piping, andassociated equipment.P.2APPLICABILITYa.This LPR is applicable to all persons performing work at LaRC, including civilservice personnel, contractors and subcontractors, research associates, andothers. Non-compliance with this LPR may result in appropriate disciplinaryaction that may include termination for a civil servant employee or exclusion fromthe Center for a contractor employee, research associate or others.b.In this directive, all mandatory actions (i.e., requirements) are denoted bystatements containing the term “shall.” The terms: “may” or “can” denotediscretionary privilege or permission, “should” denotes a good practice and isrecommended, but not required, “will” denotes expected outcome, and “are/is”denotes descriptive material.c.All document citations are assumed to be the latest version unless otherwisenoted.P.3AUTHORITYa.NASA Policy Directive (NPD) 8710.5, Policy for Pressure Vessels andPressurized Systems.P.4APPLICABLE DOCUMENTS AND FORMSa.Aeronautics and Space, CFR Title 14.b.Continuing Qualification and Maintenance of Packagings, 49 CFR pt. 180.c.Ocupational Safety and Health Standards, 29 CFR pt. 1910.d.NASA Procedural Requirements (NPR) 8715.3, NASA General Safety ProgramRequirements.e.Langley Policy Directive (LAPD) 1150.2, Councils, Boards, Panels, Committees,Teams, and Groups.f.LAPD 7000.2, Review Program for Langley Research Center (LaRC) FacilityProjects.Page 3 of 67Verify the correct version before use by checking the LMS Web site.

August 27, 2019LPR 1710.40 N-1g.LAPD 8730.1, The LaRC Metrology Program.h.LPR 1710.10, Langley Research Center Energy Control Program(Lockout/Tagout).i.LPR 1710.11, Fire Protection Program.j.LPR 1710.15, Wind-Tunnel Model Systems Criteria.k.LPR 1710.41, Langley Research Center Standard for the Evaluation of Socketand Branch Connection Welds.l.LPR 1710.42, Safety Program for the Recertification and Maintenance ofGround-Based Pressure Vessels and Piping Systems (PVS).m.LPR 1740.2, Facility Safety Requirements.n.LPR 1740.4, Facility System Safety Analysis.o.LPR 1740.5, Procedures for Cleaning of Systems and Equipment for OxygenService.p.LPR 1740.6, Personnel Safety Certificaiton.q.LPR 1800.1, Langley Research Center Occupational Health Program.r.LPR 7123.2, Facility Configuration Management.s.Langley Management System Center Procedure (LMS-CP) 4710, FacilityChange Request Process.t.LMS-CP-5616, Computerized Maintenance Management System (CMMS)Change Request.u.LMS-CP-7151, Obtaining Waivers for Langley Management System (LMS)Requirements.v.NASA Technical Standard (STD) 8719.17, NASA Requirements for GroundBased Pressure Vessels and Pressurized Systems (PVS).w.LMS-BP-5688, Facility Systems Engineering Requirements DocumentDevelopment.x.LMS-Task Description (TD) 5569, Performing Visual Inspections.y.Langley Form (LF) 51, Waiver Submittal Form.z.LF 121, LaRC Safety Documentation Review for Certified Operators.aa.LF 122, Facility Safety Awareness and Procedures Review for CertifiedOperators.bb.LF 159, Appointment for Operator Certification.cc.LF 461, Environmental Project Planning Form.dd.LF 533, Safety Permit – Pressurized Systems.ee.American Institute of Aeronautics and Astonautics (AIAA) S-080, Space Systems– Metallic Pressure Vessels, Pressurized Structures, and Pressure Components.Page 4 of 67Verify the correct version before use by checking the LMS Web site.

August 27, u.vv.P.5LPR 1710.40 N-1AIAA S-081, Space Systems – Composite Overwrapped Pressure Vessels.American Petroleum Institute (API) Recommended Practice (RP) 521, Guide forPressure-Relieving and Depressuring Systems.ASME B1.20.1, Pipe Threads, General Purpose (Inch).ASME B16.11, Forged Fittings, Socket-Welding and Threaded.ASME B31.1, Power Piping.ASME B31.3, Process Piping.ASME B31.5, Refrigeration Piping and Heat Transfer Components.American Society of Mechanical Engineers (ASME), Boiler and Pressure VesselCode.ASTM B88, Standard Specification for Seamless Copper Water Tube.ASTM B280, Standard Specificaiton for Seamless Copper Tube for AidConditioning and Refrigeration Field Service.FM Global, Factory Mutual (FM) Global Property Loss Prevention Data urces/fm-global-data-sheets).International Code Council (ICC), International Mechanical Code.National Board of Boiler and Pressure Vessel Inspectors (NBBI), NB-23, NationalBoard Inspection Code.National Fire Protection Association (NFPA) 30, Flammable and CombustibleLiquids Code.NFPA 54, National Fuel Gas Code.NFPA 58, Liquefied Petroleum Gas Code.SAE AMS5075, Steel Tubing, Seamless 0.22 – 0.28C (SAE 1025) Cold Drawnand Stress ONLPR 1710.40 L, Langley Research Center Pressure Systems Handbook, dated April 26,2017./s/ Clayton P. Turner, Center Deputy DirectorApril 26, 2017Distribution:Approved for public release via the Langley Management System; distribution isunlimited.Page 5 of 67Verify the correct version before use by checking the LMS Web site.

August 27, 2019LPR 1710.40 N-11. PURPOSE, APPLICABILITY, AND EXCLUSIONSPurposeThis LPR establishes requirements and guidelines regarding the design,procurement, fabrication, modification, repair, operation, and/or recertification ofpressure systems owned by Langely Research Center (LaRC), whether located onCenter or off Center, and of pressure systems owned by others that are used at LaRC.This document is written on the premise that the functions and responsibilitieslisted in Chapter 16 are essential to provide the checks and balances indispensable toensure pressure system safety.ApplicabilityThis LPR is applicable to all pressure systems owned by or used at LaRC,including new, existing, temporary, and permanent systems.Pressurized systems in wind tunnel models shall be approved by the StandardPractice Engineer (SPE) for Wind Tunnel Models and will also comply with LPR1710.15.Ground-based pressurized systems in LaRC facilities shall also comply with LPR1740.4 and LPR 7123.2.ExclusionsThe categories of pressure systems listed in Table 1-A below are not required tomeet the requirements of this LPR if they meet the specified conditions for exclusion.Table 1-A, Excluded SystemsExclusionExcluded itemNo.Condition(s) for exclusionX-1Self-Contained Breathing Apparatus(SCBA) equipment.Complies with OccupationalSafety and HealthAdministration (OSHA)regulations, 29 Code ofFederal Regulation (CFR) Part1910, Subparts 1910.134through 1910.140.X-2Water piping systems under 160 psigand 210 F.Water surge is not a designconsideration or the risk hasbeen mitigated.X-3Commercial-Off-The-Shelf (COTS)water heaters for buildings.Pressure-temperature reliefvalves replaced every 5 years.Page 6 of 67Verify the correct version before use by checking the LMS Web site.

August 27, 2019LPR 1710.40 N-1ExclusionExcluded itemNo.X-4Condition(s) for exclusionWater storage tanks and small potablewater heaters in heating boilers.In accordance with the limits inthe American Society ofMechanical Engineers (ASME)“Boiler & Pressure VesselCode,” Section IV, “HeatingBoilers”, paragraph HLW-101.H-stamped.X-5Packaged, COTS, facility hot waterboilers and low pressure steam boilerswithin the scope of ASME Boiler andPressure Vessel Code, Section IV.X-6Water deluge systems under 250 psig.Initial installation per ASMEcode requirements.Relief valves retested orreplaced per the requirementsof the Commonwealth ofVirginia, Department of Laborand Industry.No hazard to personnel in theevent of failure.Design pressure not exceeding150 psig.X-7Inert gas piping systems, e.g., controlair, instrument air, and shop airsystems.Line size not exceeding 1/2inch for all methods offabrication, or line size up to 11/2 inch if no welding orbrazing is used in theirfabrication.Relief valves periodicallyretested every 5 years.Page 7 of 67Verify the correct version before use by checking the LMS Web site.

August 27, 2019LPR 1710.40 N-1ExclusionExcluded itemNo.Condition(s) for exclusionOperating pressures up to 15psig.X-8If the excluded steam systemSteam and gravity-powered condensate is fed by a higher-pressurereturn systems for building heating.steam system, the first reliefdevice following the pressurereducing regulator shall beretested yearly.X-9COTS prepackaged pressurized waterand steam cleaning systems.Maintained and operated inaccordance with themanufacturer’srecommendations.X-10Fire protection water systems forfacilities.None.X-11COTS prepackaged refrigerators,freezers, and Heating, Ventilation, andAir Conditioning (HVAC) equipment.None.X-12Fire extinguishers, portableextinguishers, standpipe and hosesystems, automatic sprinkler systems,fixed dry chemical extinguishingsystems, carbon dioxide extinguishingsystems, and halogenatedextinguishing agent systems.Complies with 29 CFR Part1910, Subpart L, "FireProtection.”X-13Glove boxes.None.Fuel storage pressure systems.Meets applicable U.S.Department of Transportation(DOT) requirements.X-14Page 8 of 67Verify the correct version before use by checking the LMS Web site.

August 27, 2019LPR 1710.40 N-1ExclusionExcluded itemNo.Condition(s) for exclusionX-15COTS prepackaged hydraulic systems.None.X-16COTS welding equipment.None.COTS laboratory equipment.Fluid delivery system shallhave suitable overpressureprotection.X-17X-18X-19X-20Volumes not greater than 100cubic feet.Vacuum vessels.Not connected to a positivepressure fluid delivery system.Nominal diameter of less than6 inches.Vacuum piping.Not connected to a positivepressure fluid delivery system.Contractor-owned pressure systems.Used on a temporary basis forthe purpose of constructionactivities.The owning Contractor shallmeet all applicable Federaland State safety regulations.Subjected to hydrostaticpressure only.X-21Atmospheric storage tanks.Complies with applicableAmerican Petroleum Institute(API) or UnderwritersLaboratories (UL) standards.Page 9 of 67Verify the correct version before use by checking the LMS Web site.

August 27, 2019LPR 1710.40 N-1ExclusionExcluded itemNo.Condition(s) for exclusionCOTS self-contained pressurized eyewash systemsOverpressure protectiondevices, if present, areperiodically tested or replacedin accordance withmanufacturers’recommendations.X-23Tube trailers.Periodically retested andrequalified in accordance with49 CFR 180, provided that theowner’s OSHA inspectionrequirements of 29 CFR1910.101 are met.X-24Natural gas distribution systems.Design pressure not exceeding15 psig.Pressurized test articles or test articlescontaining pressurized components.Excluded if they have beenreviewed and accepted by aformal safety review committee(see LAPD 1150.2) or by aformal Operational ReadinessReview (ORR) board (seeLAPD 7000.2).X-22X-25Page 10 of 67Verify the correct version before use by checking the LMS Web site.

August 27, 2019LPR 1710.40 N-1ExclusionExcluded itemNo.X-26Condition(s) for exclusionTemporary, test-specific pressuresystems.Excluded if risk assessment inaccordance with LPR 1740.4shows there is no risk topersonnel, and anyunmitigated risk to the facilityhas been accepted by theOrganizational Director.Pressurized systems andcomponents are notconsidered to fall into thiscategory if they are usedrepeatedly for testing differenttest articles or configurations.Note: For additional guidance on lockout/tagout procedures for pressure vesselslisted in Table 1-A, see LPR 1710.10.Page 11 of 67Verify the correct version before use by checking the LMS Web site.

August 27, 2019LPR 1710.40 N-12. GENERAL REQUIREMENTSRequired Codes and StandardsPressure systems and components owned by or used at LaRC shall bedesigned, fabricated, modified, repaired, and/or recertified, as a minimum, inaccordance with the following codes and standards as applicable:a.American Institute of Aeronautics and Astronautics (AIAA)(1)S-080, Space Systems – Metallic Pressure Vessels, Pressurized Structures,and Pressure Components(2)S-081, Space Systems – Composite Overwrapped Pressure Vesselsb.American Society of Mechanical Engineers (ASME)(1)Boiler and Pressure Vessel Code(2)B31.1, Power PipingNote: for steam and condensate piping(3)B31.3, Process PipingNote: for all piping other than steam and condensate(4)c.B31.5, Refrigeration Piping and Heat Transfer ComponentsFM Global, Factory Mutual (FM) Data SheetsNote: Applicable pressure equipment codes and standards in FM data sheetseries 12.d.International Code Council (ICC), International Mechanical Codee.Langley Research Center(1)LPR 1710.41, Langley Research Center Standard for the Evaluation of Socketand Branch Connection Welds(2)LPR 1710.42, Safety Program for the Recertification and Maintenance ofGround-Based Pressure Vessels and Piping Systems (PVS)(3)LPR 1710.15, Wind-Tunnel Model Systems Criteria(4)LPR 1710.11, Fire Protection Program(5)LPR 1740.4, Facility System Safety Analysis(6)LPR 7123.2 Facility Configuration Managementf.NASA STD 8719.17, NASA Requirements for Ground-Based Pressure Vesselsand Pressurized Systems (PVS)g.National Board of Boiler and Pressure Vessel Inspectors (NBBI), NB-23, NationalBoard Inspection Codeh.National Fire Protection Association (NFPA)(1)NFPA 30, Flammable and Combustible Liquids CodePage 12 of 67Verify the correct version before use by checking the LMS Web site.

August 27, 2019LPR 1710.40 N-1(2)NFPA 54, National Fuel Gas Code(3)NFPA 58, Liquefied Petroleum Gas CodePage 13 of 67Verify the correct version before use by checking the LMS Web site.

August 27, 2019LPR 1710.40 N-13. APPROVALSRequired ApprovalsAll new designs, procurements, fabrications, modifications, and repairs topressure systems and system components shall be approved by the followingpersonnel:a.The SPE for Pressure Systems or the SPE for Flight Systems, to ensurecompliance with the required codes and standards.b.The Facility Coordinator (FC), to ensure coordination with all activities in thefacility where the pressure system is located.c.The Facility Safety Head (FSH), to ensure compliance with specific safetyrequirements of the facility where the pressure system is located.Additionally, the following signatures may be required, depending on the scope ofthe required work:a.The Authority Having Jurisdiction (AHJ), to ensure compliance with requiredcodes and regulations for pressure systems containing flammable or combustibleliquids, flammable gases, cryogenic liquids, oxidizers, pyrophoric substances,highly reactive substances, or toxic substances.b.The cognizant Safety and Facility Assurance Branch (SFAB) Safety Engineer, toensure compliance with all applicable facility safety requirements.c.The SPE for Welding, for pressure systems containing welded or brazedcomponents, to ensure compliance with welding process quality assurancerequirements, procedures, and codes.Approval by the above listed personnel shall be verified by their signature anddate on the design drawings, sketches, procurement requisition records, or work orderfunctional approvals, as applicable.Page 14 of 67Verify the correct version before use by checking the LMS Web site.

August 27, 2019LPR 1710.40 N-14. WAIVERS AND INTERPRETATIONSWaiversApproval for a waiver from the requirements in this LPR shall be obtained byfollowing the process described in LMS-CP-7151, “Obtaining Waivers for LMSRequirements,” and as further described herein:a.In the “Recommending Authorities” section of LF 51, the “OtherRecommendation Authority” is the chairperson of the Pressure SystemsCommittee and the “Engineering Technical Authority” is the applicable SPE.b.All requests for waivers from the requirements in this LPR, includingrequirements in any referenced Agency standards, national consensus codes, orindustry standards, shall include full justification for the waiver request andsupporting data or analyses to demonstrate that safe operation can be achieved.InterpretationsThe SPE for Pressure Systems, the SPE for Flight Systems, the SPE forWelding, and the AHJ are granted authority to issue interpretations on the applicabilityof individual requirements in this LPR within their respective areas of expertise.Page 15 of 67Verify the correct version before use by checking the LMS Web site.

August 27, 2019LPR 1710.40 N-15. DESIGN OF NEW PRESSURE SYSTEMS (GROUND-BASED)GeneralAll new pressure systems shall be designed in compliance with the applicablecodes and standards listed in Chapter 2 of this LPR.The Cognizant Engineer shall ensure that all new pressure system designsinclude the following documentation, as applicable for each project:a.Requirements Document(1)Formal Requirements Document per LMS-BP-5688(2)Statement of Work/Work Planb.(1)Engineering analyses and calculationsASME piping code calculations, such as:(a)Pressure and temperature design calculations(b)Flexibility analysis(c)Relief valve and/or rupture disc sizing calculations(d)Vent line and vent header backpressure calculations(2)ASME BPV code pressure vessel calculations, such as:(a)Pressure and temperature design calculations for shells, heads, nozzles,and closures(b)Nozzle load limitations(c)Reinforcement of openings(d)Relief valve and/or rupture disc sizing calculations(e)Fatigue life for pressure vessels operating with cyclic pressure and/ortemperature(3)Flow sizing calculations for valves, control orifices, flow meters, and pipingcomponents(4)For custom-made components and for code-unlisted components, calculationsusing closed-form equations, finite element methods, or other generallyaccepted engineering analysis methods to establish structural integrity andcompliance with the required safety factorsc.Catalog cuts of commercial-off-the-shelf itemsd.Engineering drawings (D-size format is preferred), sketches, and/or marked-upphotographs(1)Process and instrumentation diagrams (P&ID)(2)Plan views, elevation views, section views, and detail views as needed todescribe the required scope of workPage 16 of 67Verify the correct version before use by checking the LMS Web site.

August 27, 2019LPR 1710.40 N-1e.Parts lists and material specification tablesf.LF 461, Environmental Project Planning Formg.Facility Change Request (FCR)Design drawing packages and sketches shall include the following information:a.Name of the Cognizant Engineerb.Datec.Facility named.Building numbere.Drawing or sketch titlef.Drawing or sketch numberg.Applicable design code(s) and/or standard(s)h.Relevant engineering data, such as fluid service, design pressure, designtemperature, material specification, non-destructive examination and inspectionrequirements, testing requirements, set pressure of relief devices, set points of allinterlocks and protection devices, torque values of bolted connections, andrequirements for welding and/or brazing.Page 17 of 67Verify the correct version before use by checking the LMS Web site.

August 27, 2019LPR 1710.40 N-16. FABRICATION OF NEW PRESSURE SYSTEMS (GROUND-BASED)GeneralNew pressure systems shall be fabricated in accordance with an approveddesign as per Chapters 3 and 5 of this LPR.The Cognizant Engineer shall supervise the progress of pressure systemfabrication to ensure compliance with this LPR.Pressure VesselsPressure vessels shall be stamped by the fabricator in accordance with theASME Pressure Vessel Code, Section VIII, Divisions 1 or 2.The fabricator shall provide a copy of the vessel’s code stamp documentation toNASA.Piping Systems, Welded or BrazedWelded or brazed piping systems shall be fabricated by organizations that areholders of an ASME (or National Board) Certificate of Authorization for the application ofa code stamp, such as the “U”, “U2”, “N”, “R”, or “PP” stamps. The Certificate ofAuthorization ensures that the fabricator is familiar with and uses the quality controlmeasures required by the ASME codes for pressure vessels and piping.Whenever a pressure system is fabricated by welding or brazing, the fabricatorshall submit the following documents for approval by the SPE for Welding or his/herdesignated representative prior to the start of any welding:a.Welding or Brazing Procedure Specification (WPS/BPS)b.Certified Procedure Qualification Records (PQR)c.Certified Welder or Brazer Performance Qualifications (WPQ/BPQ)All components installed in piping systems shall be permanently marked withlegible raised lettering or stamping in order that required information (i.e., themanufacturer, pound class, model or part number, size, pressure rating, temperaturerating, material of construction, and code of construction, as applicable) can beascertained. Component markings can be limited to the manufacturer’s name ortrademark and the manufacturer’s part number or model number if all other pertinentinformation as outlined above can be ascertained through the manufacturer’s catalogsor data sheets.Piping Systems, Non-Welded or Non-BrazedNon-welded or non-brazed piping and tubing systems shall be fabricated bypersons that have received training in the specific fabrication methods utilized, who candemonstrate they understand proper material selection and the identification,installation, fit-up, alignment, and support of components to be used in suchfabrications.Page 18 of 67Verify the correct version before use by checking the LMS Web site.

August 27, 2019LPR 1710.40 N-17. MODIFICATIONS AND REPAIRS TO PRESSURE SYSTEMS (GROUND-BASED)GeneralPressure systems shall be modified or repaired in accordance with an approveddesign as defined in Chapters 3 and 5 of this LPR.The Cognizant Engineer shall supervise the progress of pressure systemmodifications and repairs to ensure compliance with this LPR.Pressure VesselsModifications and repairs to code-stamped pressure vessels shall be performedby organizations that are holders of a National Board Certificate of Authorization for useof an “R” stamp.Modifications and repairs to non-code-stamped pressure vessels shall beperformed by organizations that are holders of a National Board Certificate ofAuthorization for use of a “U”, “U2”, “R”, “N”, or “PP” stamp.Piping Systems (Welded or Brazed)Modifications and repairs to welded or brazed piping systems shall be performedby organizations that are holders of one of the following ASME or National Boardstamps: “U”, “U2”, “R”, “N”, or “PP”.Whenever a piping system is modified or repaired by welding or brazing, thefabricator shall submit the following documents for approval by the SPE for Welding orhis/her designated representative prior to the start of any welding:a.Welding or Brazing Procedure Specification (WPS/BPS)b.Certified Procedure Qualification Records (PQR)c.Certified Welder or Brazer Performance Qualifications (WPQ/BPQ)Piping Systems (Non-Welded or Non-Brazed)Modifications and repairs to non-welded or non-brazed piping and tubingsystems shall be performed by persons who have received training in the specificfabrication methods utilized, who can demonstrate they understand proper materialselection, and the identification, installation, fit-up, alignment, and support ofcomponents to be used in such fabrications.Page 19 of 67Verify the correct version before use by checking the LMS Web site.

August 27, 2019LPR 1710.40 N-18. PROCUREMENT OF PRESSURE SYSTEMS (GROUND-BASED)GeneralProcurements of pressure systems or of pressure system components shall bereviewed and approved as required in Chapter 3 of this LPR.The requiring organization/customer is responsible for ensuring that the allrequired approvals outlined in Chapter 3 are complete, and shall coordinate with theapprovers in Chapter 3 and the Office of Procurement to ensure the requirements underChapter 8 are fulfilled and included in solicitation and resultant contractual documents.Procurement of Pressure Vessels and TanksAll procurements for COTS pressure vessels and tanks for use at LaRC shallrequire the vessels to be code stamped by a recognized U.S. national standardsorganization such as ASME, API, DOT, or UL, as applicable.All contracts or purchase orders for the acquisition of new, custom-built pressurevessels shall:a.Require the vessels to be ASME code stampedb.Contain the following wording:“This solicitation includes fabrication of pressure vessels. A current ASMECertificate of Authorization for use of a “U” or “U2” code stamp shall be held bythe organization performing the fabrication and stamping of the pressure vessels.The contract award process will be expedited by submittal of the Certificate ofAuthorization with the offeror's bid; however, early certification submittal is notrequired to ensure bid responsiveness. An offeror’s ability to confirm thatdeliverable pressure vessels will be code stamped as required is a matterrelating to the offeror’s responsibility and will be determined prior to award.”All contracts or purchase orders for the acquisition of new, custom-built tanksshall require API or UL code stamping.An approved waiver as described in Chapter 4 shall be obtained prior toprocurement of non-code-stamped pressure vessels and tanks that are within the scopeof this LPR.The Cognizant Engineer shall require all Vendors supplying pressure vesselsand tanks to furnish the following documents, as applicable:a.Outline and Cross Sectional Drawings,b.Bill of Materials,c.ASME Code Calculations,d.Welding Procedures (WPS),e.Procedure Qualification Records (PQR),f.Weld Maps,g.Non-Destructive Examination (NDE) Records,Page 20 of 67Verify the correct version before use by checking the LMS Web site.

August 27, 2019LPR 1710.40 N-1h.Heat Treatment Records,i.Hydrostatic Test Records,j.Code Reports (ASME Code Forms, Manufacturer’s Data Reports, NameplateRubbing or Facsimile),k.Charts (Hydrostatic Test, Post Weld Heat Treatment (PWHT)), andl.Reports (Mill Test Report (MTR), Positive Material Identification (PMI), Nondestructive examination (NDE), Radiography, Hardness Test, Safety Data Sheet(SDS)).Procurement of Piping Systems (Welded or Brazed)All contracts requiring fabrication, modification, or repair of ground-based, weldedor brazed piping systems shall:a.Require the fabricator to be a holder of an ASME code stampb.Contain the following wording:“This solicitation requires fabrication, modification, and/or repairs topressure systems. A current National Board or ASME Certificate ofAuthorization for use of any of the fo

National Board of Boiler and Pressure Vessel Inspectors (NBBI), NB -23, National Board Inspection Code. ss. National Fire Protection Association (NFPA) 30, Flammable and Combustible . LPR 1710.40 L, Langley Research Center Pressure Systems Handbook, dated April 26, 2017. /s/ C

Related Documents:

Step 12 The Configure Standard TCP/IP Port Monitor screen will open. By using LPR protocol Select LPR for Protocol. Enter lp1 in the Queue Name field. Click on the LPR Byte Counting Enabled checkbox (Due to a flaw in Windows LPR, some print servers will not accept jobs unless Byte Counting is enabled).

Cancellation of Removal A path to LPR status for certain non-USCs who are domestic violence victims at the hands of abusive USC/LPR spouses, USC/LPR parents and persons with USC/LPR children in common with abusive USCs/LPRs. Requires 3 years of continuous presence in U.S.; Evidentiary standard is "any credible evidence."

- Certain categories of immigrants may become eligible to apply for LPR status or a green card. Path to a green card/LPR varies. - 1070 filing fee including fingerprints. U.S. citizenship - To become eligible to apply to naturalize, an individual must have had LPR status for at least 5 years (or 3 years if obtained LPR status

LPR: Lawful permanent resident or "green card" holder. Eligible to naturalize after 5 years in LPR status (3 if married to USC). Removal requires a hearing before an Immigration Judge, and LPRs are eligible for "cancellation of removal" if no aggravated felony convictions and 5 years as LPR/7 years of residence in U.S.

and work permanently in the U.S. An LPR may apply for naturalization after living in the U.S. for 5 years. Green card or passport stamp showing 1-551, AR- 2, AR -3 Reentry permit I-327 Receipt from USCIS showing that I-90 app for LPR replacement card filed I-94 showing stamp for admission as LPR

1 Launch the Dell Local Printer Settings Utility by clicking Start Programs Dell Printers Dell Laser Printer 1710 Dell Local Printer Settings Utility. 2 Select your Dell Laser Printer 1710. 3 Click OK. 4 In the left column, click Paper. 5 In the right column, go to the Tray 1 section

Quantum machine learning for quantum anomaly detection NANA LIU CQT AND SUTD, SINGAPORE ARXIV:1710.07405 TUESDAY 7TH . Chandola et al, Anomaly detection: a survey, ACM computing surveys, 2009 arXiv:1710.07405. Types of anomalies Supervised Unsupervised Semi-supervised Point Contextual Collective arXiv:1710.07405. Types of anomalies Supervised .

can distort the roof of a cone roof tank can exceed the design pressure of the tank maximum rateofflowinoroutrate of flow, in or out atmospheric or temperature changes size vent per API 2000 or approved standard min 1 ¼ in. (32 mm) or largest connection.