Modular Power Systems (MPS) 130 - 600 KW & Gemini

2y ago
30 Views
2 Downloads
3.47 MB
16 Pages
Last View : 4d ago
Last Download : 3m ago
Upload by : Kaleb Stephen
Transcription

Modular Power Systems (MPS)130 - 600 kW & GeminiTHE PREMIUM IN GENERATOR PARALLELING

More power formore applications.No two facilities are alike.Each one has unique powerrequirements. But everyenterprise has one standbypower need in common. Stayup and running, no matter what.And one company does the job,no matter how small, or big.Generac Industrial Power.3

Generac Industrial Power offersan expansive product lineup from15 kW through 2 MW singlegenerators, and as much as 100 MWutilizing our innovative ModularPower System (MPS) technology.Check out additional brochures atwww.generac.com/industrial.Don’t lose asingle second.Generac’s Modular Power System (MPS) is a powerful combination of the industry’s most reliablegenerators and state of the art integrated paralleling technology, providing the highest level ofreliability in automatic standby power.Not only does MPS boast a rate of up to 99.999% reliability, it is more cost effective and flexiblethan single gensets with the same load capacity. MPS is appropriate for numerous types ofbusinesses, including hospitals, airports, office buildings, manufacturing plants, data centers andretail superstores.1-888-GENERAC4

The PowerManager Control System.Generac’s PowerManager control system is the heart of the Modular Power System.It provides an integrated approach that simplifies generator parallelingwhile providing unsurpassed reliability.HOW IT WORKSEach MPS generator includes a single, fully integrated controller and aparalleling switch. A traditional approach to paralleling three generators wouldtypically require 14 to 20 controllers from five different manufacturers. Throughthe use of our control technology, the PowerManager handles the operationof individual gensets by utilizing one digital control per generator to control allgenerator functions: speed governing, voltage regulation, genset alarm andmonitoring, synchronizing, load sharing and protection.The paralleling switch allows the main power leads of each generator to beconnected together at a common point of connection – junction box, distributionpanel or simply the transfer switch generator lugs.500 kW500 kW500 kW500 kWThe consolidation of these functions significantly simplifies the system whileincreasing system performance and providing the ability to effectively manage up to15 units at a time. Advantages are redundancy, flexibility and scalability while beingcost competitive with large single gensets and significantly less than traditionalparalleling systems.TOUTILITYSINGLE TRANSFER SWITCHMPS CONFIGURATION500 kW500 kW- Speed Governor- Voltage Regulator- Auto Synchronizer- Load Share Module (kW)- Load Sharing (kVAR)- Protective Relaying- Bi-Fuel Controller- Digital Communications- PLC SWITCHTOUTILITY- Generator ControllerMULTIPLE TRANSFER SWITCHMPS CONFIGURATION500 kW500 kW500 kW500 kWTRANSFERSWITCHTOUTILITYLOAD LOSS EFFECTSEVEREHIGHMEDIUMLOWNonVitalLoadLOAD adLOADkWLOSS EFFECT 500 kWLOAD LOSS DIUMLOWNonVitalLoadLOAD LOSS iticalLoadTOUTILITY5w w w. g e n e r a c . c o m / i n d u s t r i a l

Modern Engine TechnologyThe right componentsfor your application.GuardingGenerac’s industrial generator sets use an integratedapproach to building the optimum system for eachapplication. This approach matches the right engine,alternator, control panel, enclosure, base tank andsoftware for the most effective solution. Meeting UL2200and CSA standards,Generac guards coverfan, belts, and pulleysfor safetyIn addition to meeting EPAemissions standards andsound & endurance testing, acomprehensive set of highlyspecialized tests includingtorsional analysis, transientresponse, maximum motorstarting and structural soundestare preformedWhether our generators are powered by one of our ownspark-ignited engines, designed and built in-house, orone of our best-in-class sourced engines, you’ll find thereliability and flexibility to handle any power need.GENERATOR SET OPTIONS Open model Suited for indoor placement within a dedicatedbuilding or mechanical room W eather protective enclosure Provides outdoor protectionagainst the elements S ound attenuated enclosure options Two levels providesignificantly lower sound levels and are offered in weatherprotective enclosures.CERTIFICATIONS U L2200 Listed: Generac was the first to introduce its completeproduct line in conformance with UL2200 safety standards. EPA: Environmental Protection Agency NEMA: National Electrical Manufacturers Association CSA: Canadian Standards Association* CARB: California Air Resources Board* SCAQMD: South Coast Air Quality Management District (CA)* IBC 2009 & 2012: International Builder Code seismic compliance OSHPD: Approved with shaker table testing. SDS value 2.5* Select models onlyRigid Base Frames uilt to withstand high-torqueBtransient conditions and eliminatevibrations. Fully welded forstrength and then finished withindustrial RhinoCoat paint finish1-888-GENERAC6

Advanced Digital Controls he industrial control panel combines durableTconstruction with seamlessly integratedcomponents and features like constant monitoring,built-in alarms and adjustable parameters, helpingensure reliable generator operationIndustrial AlternatorsFully Integrated Design enerac industrial alternatorsGare machine wound, machineinserted and machine varnishedfor the ultimate in consistentmanufacturing ll control functions are integrated into a singleAencapsulated circuit board platform: gensetcontroller, governor, regulator and protectionTouch Screen Interface ser-friendly access to alarm and generatorUoperation informationIntegrated Paralleling SwitchReplaces need for externalparalleling switchgearAdvanced Harness& Connection DesignLow VoltageSeparation he advanced wire harnessTdesign with waterproofconnectors assures reliable,repeatable interconnectionbetween electronic and sensorcomponents. Special sealedboots are used on interconnectsand termination points forenvironmental protection ow voltage controlLconnections locatedbeneath the controlpanel include two-wirestart, communications,alarms, relay outputs, etc.and allow for improvedcustomer safety7Circuit BreakersEasy Stub Ups Available inthermal magneticconfigurations orelectronic trip.Multiple breakersolutions supported ower cabling stubPup is directly belowthe parallelingswitch, for theeasiest installationw w w. g e n e r a c . c o m / i n d u s t r i a l

A system dedicated to reliability.Generac builds additional reliability into more areas of our parallel generator systemthan any other supplier. It’s these extras that make Generac’s Modular PowerSystem the premium solution in parallel generation.REDUNDANCY IS THE BASIS OF MPS RELIABILITYReliability through redundancy is the cornerstone of a parallel generator system. In mostapplications, the loads that require the highest degree of reliability are only a percentage ofthe generator’s total capacity. Given the typical load factors in most applications and thepotential for minimal load shedding as needed, an MPS solution can easily offer systemredundancy without increasing capacity. This is a significant advantage over single gensetswhich offer no redundancy.HARDENED CONTROLSReliability is maximized by placing each generator’s controller in a protective aluminumenclosure and carefully sealing the plug connections. Other systems leave control boardsexposed to potential physical damage and external electrical noise that can interfere withperformance. An MPS configuration ensures vital components are given extra protection.G-Panel BoardHARDENED SWITCHINGReliability is increased through the premium switching components Generac employs. Whileother systems utilize circuit breakers as switches, the MPS system is the only one to use acyclic rated power contactor for the active switching, and a shunt trip molded case breakerfor over-current protection and redundant isolation capabilities. These advanced componentscreate a power switching device that has an extended lifespan and is significantly moredurable and reliable than any other standard system available.NO SINGLE POINT FAILURESGenerac’s MPS system is the only one that automatically supports paralleled generatoroperation through all failure modes: loss of communications, loss of system controller, loss ofa generator, etc. This means that when active communications go down, MPS generators arestill fully capable of automatic starting, paralleling, and load balancing without manual starting.No other system is able to supply this level of automatic backup, making Generac’s standardMPS configuration the most reliable system available today. As an option, Generac alsooffers an independent programmable load sequencer allowing for automatic control of loadsequence capabilities in an emergency.1-888-GENERAC8Paralleling Switch

FLEXIBILITYUtilizing multiple smaller gensets versus a single large unit offers greater location flexibility. MPS units may be locatedwhere a comparably powered single genset can’t so space can be better utilized. Weight distribution makes rooftopinstallations possible and a low profile allows for parking garage installations. In addition, less electrical space is requiredbecause of the elimination of switchgear and large external panel boards.MANAGE CAPITAL EXPENDITURESAn MPS installation manages costs in several ways versus a traditional single genset or paralleling system.SCALABILITYThe ability to expand your MPS solution can mean a significant reduction in your initial capital investment. Thereis no need to install more power than you currently need. Simply add more modules as your business grows andpower requirements increase.SIMPLIFIED INSTALLATIONThe light weight of MPS gensets makes them easier to move and place on job sites, requiring smaller, less expensivelifting equipment. The simple design means installation time is decreased.SERVICEABILITYEnhanced serviceability and reduced total owning cost are achieved with the MPS solution. If one unit is down for service,the other units continue to provide system critical, back-up power support. This protects the user from the potentiallosses that would occur if the power failed during equipment maintenance. It also significantly reduces the total cost ofownership by removing the need for a rental generator during service.SHORT LEAD TIMESBecause they are engineered with readily available engines, MPS units typically ship with much shorter lead times thangensets manufactured with specialized engines.9w www.wgw.e nge rnaecr.acco. mc o/ imn /di un sdtur si at rl i a l

Pack in the power with theGemini MPS Twin Pack.When space is at a premium and reliability is critical, no other product comes close to Generac’s GeminiTwin Pack. By housing two generators within a single enclosure, the Gemini Twin Pack is able to provide thesame amount of power in a footprint that is 20% smaller. Features provide built-in redundancy for superiorsystem reliability and scalability along with load management capabilities.MPS Solution for Large kW Projects Parallel up to seven Gemini systems without additional switchgear Easily achieve N 1 and N 2 redundancy for critical loads Compatible with other Generac MPS nodesTwo Gensets in One Enclosure Improved footprint density forlarge applications Inherent redundancyTouchscreen Operator Interface For easy customer interactionServiceabilityIntegrated Genset Controller Serviceable items located to the outside Lift-off doors provide complete accessto entire side of the generator1-888-GENERAC All control functions are integrated into a singleencapsulated circuit board platform: gensetcontroller, governor, regulator and protection10

Sound Attenuated Enclosure Air intake on side and discharge outthe top for no re-circulation issues Built-in muffler isolated from enginecompartment for enhanced reliabilityCircuit Breakers Various options available Breakers equipped with shunttrip for redundant isolationIntegrated Paralleling Switch Premium contactor technologyfor enhanced cyclic dutyLoad Center Standard Single point connection for 120/240 auxiliary power1111w w w. g e n e r a c . c o m / i n d u s t r i a l

DieselOne of thelargest suppliersThe Traditional Choice for Standby PowerDiesel-fueled generators are an efficient choicefor high kW applications, as well as for facilitieswhere code requirements call for on-site fuelstorage, like hospitals and 911 call centers. Toprovide the best possible diesel-fueled standbypower solutions, Generac identifies andprequalifies diesel engines proven in real-worldapplications under adverse conditions. Thenwe work hand-in-hand with best-in-class dieselengine manufacturers to optimize designsspecifically to meet Generac requirements.in the industry.No matter what you need standby power for,whether to keep a hospital operating, a data centerfunctioning or a factory producing, count on GeneracIndustrial Power to provide the right product to meetyour demands. With our newly expanded productline, you’ll find the reliability, consistency and flexibilityto handle any power need.DIESEL15 kWGASEOUS22 kWBI-FUELMOBILE6 kW01-888-GENERAC102512100250

Bi-FuelNatural GasThe Smartest Fuel ChoiceThe Only True Bi-fuel Solution. Long Running Times: Because natural gas is supplied by autility, refueling is not an issue.Generac Bi-Fuel generators start on diesel fuel and addnatural gas as load is applied, until the unit runs primarily onnatural gas. Unlike practically every other bi-fuel solution onthe market, Generac’s Bi-Fuel generators are fully integratedsolutions. That means every fuel train component, everysensor, every actuator is specifically designed, engineered,and factory tested to work together. This gives GeneracBi-Fuel generators the added benefit of being EPAcompliant from the factory—the only bi-fuel systemson the market that can make such a claim. Environmentally Friendly: Natural gas-fueled engines emitfewer nitrogen oxides and particulate matter, while alsoavoiding the fuel containment, spillage, and environmentalconcerns associated with fuel storage. Fuel Reliability: With natural gas, there’s no onsite fuel storageor ongoing maintenance required in order to keep a clean andreliable supply of fuel.2 MW500 kW500 kWGenerac’sparalleling powersolutions providereliable, flexiblepower solutionswhen a singlegenerator is notappropriate forthe application.Get solutions thatprovide as much as100 megawatts.600 kW2 MW5001000 200013w w w. g e n e r a c . c o m / i n d u s t r i a l

The right generatorstarts with theright tools.With more than 57 years of powergeneration experience, Generac hasbuilt a tool set for electrical engineersand contractors to simplify and savetime sizing, specifying or installinggenerators. The less time you spendup front, the sooner you’ll havea generator on the job. No othermanufacturer matches our capability tosupport generator design needs.explore now atwww.generac.com/ResourceCenter1-888-GENERAC14

RESOURCESGENERAC CITYCommercial, Industrial, and MissionCritical Facilities rely on GeneracIndustrial Power every day. ExploreGenerac City to learn more.CASE STUDIESRead how other businesses andindustries selected their Generacstandby power systems, and how theinvestment paid off for them through avast collection of case studies.WHITEPAPERSThere are many issues to consider whenselecting a standby power system.Generac has a number of white papersthat can help you understand all theconsiderations.VIDEOSLearn more about Generac IndustrialPower and see how other businessesselected Generac standby products.POWERCONNECT NEWSLETTERSubscribe to Generac IndustrialPower’s newsletter to receive regularupdates on new products, casestudies, and trends in standby power.NEWS & ARTICLESStay up-to-date on the latest news,trends, and product information relatedto power generation in this collection ofindustry articles.SPECEXPERT BY MASTERSPECHelping to make spec writing easier,faster, and more accurate withSpecExpert by MasterSpec – an easyto use, guided program for creatingspecifications.BIM DOCUMENTSCreate intelligent designs utilizing BIM.Download Generac Industrial Powerproduct models which have undergonequality assurance testing to meet thestrict requirements of Revit.PROFESSIONAL DEVELOPMENTSEMINAR SERIES (PDSS)These courses are oriented towardspracticing design, sales and consultingengineers involved in supplying emergencyand standby power to industrial,commercial and mission critical facilities.Earn free CEU’s and PDH’s!GENERAC INDUSTRIAL POWERENGINEERING SYMPOSIUMThe Generac Industrial PowerEngineering Symposium is a 3-day eventdesigned for the practicing engineer towalk away with a better understanding ofgenerator sizing, application, and codecompliance.TOOLSPOWER DESIGN PROThe most powerful electrical andmechanical design and sizing tool onthe market. Generac’s Power DesignPro is a one stop solution center forthe consulting engineerEDUCATIONPOWER TRIPEXPERIENCE TOUROur 53’ Power Trip Experience hasbeen on the road for over a decadeeducating tens of thousands ofengineers, and this year we’re bringingnew solutions, products and moretrusted expertise right to your city.PRODUCT INFORMATIONINDUSTRIAL PRODUCTWEBPAGESExplore the full line of GeneracIndustrial Power productsincluding gaseous, diesel, andbi-fuel generators in a variety ofconfigurations and outputs.SPEC SHEETSDownload any of Generac IndustrialPower’s product spec sheets all fromone place.15BROCHURES & LITERATUREView, save, or download brochuresand literature to explore the full line ofGenerac Industrial Generators.w w w. g e n e r a c . c o m / i n d u s t r i a l

SALES, DESIGN AND SERVICE SUPPORTJust as important as product quality and reliability is Generac Industrial Power’scommitment to customer support, both before, during and after the purchase. GeneracIndustrial Distributors sell and service all Generac generators, controllers and switchingsystems. Our worldwide network has factory-trained and certified technicians withtrusted expertise in system design, sizing, installation, commissioning, diagnostics andrepairs. 24/7/365 emergency response Engineering and project management capabilities include professional and completedesign and installation consultative services Dedicated strategic account support and regional or national programimplementation programsFor more information, such asFAQ's, visit us online atwww.generac.com/industrial844-ASK-GNRCGenerac Power Systems, Inc.S45 W29290 Hwy. 59, Waukesha, WI 531891-888-GENERAC (1-888-436-3722)0170220SBY 08/2016 2016 Generac Power Systems, Inc.All rights reserved. Specifications are subject to change without notice.generac.com/industrial

reliability in automatic standby power. . speed governing, voltage regulation, genset alarm and monitoring, synchronizing, load sharing and protection. . MEDIUM LOW HIGH MULTIPLE TRANSFER SWITCH MPS CONFIGURATION SINGLE TRANSFER SWITCH MPS CONFIGURATION 500 kW 500 kW

Related Documents:

Master Production Scheduling – Procedure for Developing MPS – Guidelines for Master Scheduling – Updating of MPS – MPS in Produce-to-Stock and Produce-to-Order Firms – Length of Planning Horizon of MPS – Symptoms of a Poorly Designed MPS – Solved Problems – Review Questions – Problems CHAPTER 7 : CAPACITY PLANNING 186 - 209 Types of Capacity – Measurement of Capacity .

Keysight N6700 Modular Power System Family: Low-Profile MPS Mainframe for Automated Test Environments The Keysight N6700 Low-Profile Modular Power System (MPS) is a 1U (rack unit) high, multiple-output programmable DC power supply system that enables test system integrators to optimize performance, power and price to match test needs.

Digunakan untuk produk yang standard (TV, Radio, dsb) MPS dan FAS sama Bila variasi produk sedikit maka produk-produk tersebut bisa langsung dijadualkan dalam MPS. Untuk variasi produk banyak, sebaiknya MPS dinyatakan dalam keluarga produk (super bills). MPS dibuat dalam 2-level, pertama adalah tingkat produk family dan

Modular: 18" x 36" (45.7 cm x 91.4 cm) Stratatec Patterned Loop Dynex SD Nylon 100% Solution Dyed 0.187" (4.7mm) N/A ER3 Modular, Flex-Aire Cushion Modular, Conserv Modular, ethos Modular 24" x 24": 18" x 36": Coordinate Group: Size: Surface Texture: Yarn Content: Dye Method: Pile Height Average: Pattern Match: Modular

Chainsaw Spark Plug Application Chart call -- fa -- . Mac Cat (16, 18) MS1432, MS1635, MS1635AV, MS1838AV, Pro Mac (2500, 3205AV-14, 3505AV-16, 380) 0.025 DJ7J/130-099 BM6F/130-807 SE-J7D/130-153 OLYMPYK All Models 0.030 CJ7Y/130-075 BPM7A/130-880 SE-CJ7Y/130-146 L7TC/131-003 WS7F/130-120 PARTNER .

Shrink Fit Tool Holders Taper Ordering Code D2 L Wt. in Kgs. 40 d D1 L1 G 6 6 8 8 10 10 12 12 14 14 16 16 20 20 25 25 BT40SFA06.90 BT40SFA06.130 BT40SFA08.90 BT40SFA08.130 BT40SFA10.90 BT40SFA10.130 BT40SFA12.90 BT40SFA12.130 BT40SFA14.90 BT40SFA14.130 BT40SFA16.90 BT40SFA16.130 BT40SFA20.90 BT40SFA20.120 BT40SFA25.100 BT40SFA25.130 21 21 21 21 .

modular cnc router plans 2009v1 copyright modular cnc @2009 for personal use only item no. part number description vendor material cost qty. 1 mc-z-001 drive end plate modular cnc hdpe 10.00 1 2 mc-z-002 end plate modular cnc hdpe 8.00 1 3 mc-z-003 top plate modular cnc hdpe 12.50 1 4 mc-z-005 linear rod speedy metals 1018 crs 3.00 2

Keywords: Korean, heritage language, multiliteracies, university-level language classroom, multimodal reading response Journal of Language and Literacy Education Vol. 11 Issue 2—Fall 2015 117 eritage language (HL) learners1 who are exposed to and speak a language other than English exclusively in their homes and communities exhibit relatively lower reading and writing skills compared to .