Arlington ParkGreen Infrastructure Information SheetLocation:752 Grand StreetJersey City, NJ 07302Site Use:PublicWatershed Name:Hudson RiverWard:FTargeted Pollutants:total nitrogen (TN), total phosphorus (TP), andtotal suspended solids (TSS) in surface runoffGreen Infrastructure Description:Rain gardenEstimated Stormwater Captured andTreated Per Year: 24,100 gallonsImplementation Date: 8/15/16Green Infrastructure System: one (1) rain garden 250 square feetDrainage Area: 975 square feet (walkway and compacted lawn area)Funding Sources:Surdna FoundationPartners/Stakeholders:Rutgers Cooperative Extension Water Resources Program, New Jersey AmeriCorps WatershedAmbassador, Jersey City Parks Coalition, Friends of Arlington Park, Jersey City Department ofPublic Works, Architecture, and EngineeringAppendix A: Green Infrastructure Feasibility Study for Jersey CityAppendix B: Rain Garden Design PlansAppendix C: Completed Project Photographs

92 Hathaway Street, JerseyCity, NJ 07057bioretention systems40stormwater plantersdrainage areaproperty line2012 Aerial: NJOIT, OGISNARLINGTON PARK0'50'100'752 Grand StreetJer sey City, NJ 07304, War d F

Arlington Park is a triangular city park at the junction of Grand Street and Arlington Avenue. Stormwater runoff from the adjacent streetscan be managed in stormwater planters in the wide sidewalks. Rain gardens could manage stormwater on the site in open lawn areasthroughout the park.Existing Loads from ImperviousCover (lbs/yr)Impervious CoverRunoff Volume from Impervious Cover (Mgal)%sq. ft.TPTNTSSFrom the 1.25" Water QualityStormFor an AnnualRainfall of ovalPotential(lbs/yr)Maximum VolumeReduction Potential(gal/storm)Peak DischargeReduction Potential(cu. ft./second)EstimatedSize ( sq. ft.)EstimatedCostBioretention systems0.053916,1490.61850 4,250Stormwater planters0.3616026,6061.003,200 320,000ARLINGTON PARK752 Grand StreetJer sey City, NJ 07304, War d F41

010EXISTING CONTOURSEXISTING CENTERLINEEXISTING UTILITY POLEEXISTING CATCH BASINEDGE OF PAVEMENTLIMIT OF WORKPROPOSED GREEN INFRASTRUCTURELIST OF 6/09/16DATESHEET NAMECOVERCOVER SHEETEXISTING TREENo.EXISTING DRAINAGE AREADATEDESCRIPTIONLEGEND:REVISIONSAT THIS SITE, A BIORETENTION SYSTEM (RAIN GARDEN) WILLBE IMPLEMENTED ON THE SOUTHEAST SIDE OF ARLINGTONPARK. RUNOFF FROM THE CEMENT PATHWAY WILL BEREDIRECTED USING A CURBCUT INTO THE BIORETENTIONSYSTEM. A DRAINTECH OUTLET WILL BE PLACED IN THECENTER OF THE BIORETENTION SYSTEM, DIRECTING RUNOFFTO THE NEARBY CATCH BASIN BY 4" DIA. HDPE PIPE.LOCATION MAP:ARLINGTON PARKRAIN GARDEN DEMONSTRATION PROJECTARLINGTON AVENUE AT GRAND STREET, JERSEY CITYHUDSON COUNTY, NEW JERSERYPROJECT DESCRIPTION:PROFESSIONAL ENGINEER - NJ LICENSE # 37532ARLINGTON AVENUE AT GRAND STREET, JERSEY CITYHUDSON COUNTY, NEW JERSEYCHRISTOPHER C. OBROPTA, Ph.D., P.E.ARLINGTON PARKRAIN GARDEN DEMONSTRATION PROJECT

6. CONTRACTOR SHALL DEMO AND REMOVE ALL EXISTING ASPHALT PAVING AS SHOWN ON PLAN.DATE06.09.16DATEDRAINAGE AREA(975 SF)LIMIT OF WORKARLINGTON PARKEXISTING CATCHBASIN5'10'N0SCALE 1" 10'-0"SHEET NAMEEXISTING PLANP-1EXISTING CONDITIONS AND DEMOLITION PLANARLINGTON PARKRAIN GARDEN DEMONSTRATION PROJECTARLINGTON AVENUE AT GRANT STREET, JERSEY CITYHUDSON COUNTY, NEW JERSEYEXISTING CATCHBASINNo.REVISIONSDESCRIPTION7. CONTRACTOR SHALL HAUL REMOVED DEBRIS OFF SITE UNLESS OTHERWISE NOTED BY PROPERTY OWNER.APPROVEDCCO5. CONTRACTOR SHALL COORDINATE UTILITY MARK OUT PRIOR TO MOBILIZATION.CHECKEDCP4. CONTRACTOR SHALL COORDINATE AND CONFIRM PROJECT SCHEDULE AND WORKING HOURS WITH ENGINEER AND PROPERTY OWNER AND PROCEED INACCORDANCE WITH LOCAL REQUIREMENTS.DRAWNKTCARLINGTON AVENUE06/09/16DATE3. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING REQUIRED APPROVALS FROM AUTHORITIES WITH JURISDICTION OVER PROPOSED WORK.PROFESSIONAL ENGINEER - NJ LICENSE # 375322. CONTRACTOR SHALL VERIFY ALL INFORMATION INCLUDING ELEVATIONS AND UTILITIES PRIOR TO MOBILIZATION.CHRISTOPHER C. OBROPTA, Ph.D., P.E.PLAN NOTES:1. CONTRACTOR SHALL SCHEDULE MEETING WITH ENGINEER AND PROPERTY OWNER PRIOR TO MOBILIZATION.

6. CONTRACTOR SHALL GRADE SITE AS SHOWN ON PLAN. CUT SOIL SHALL BE REUSED ON SITE FOR FILL LOCATIONS.7. CONTRACTOR SHALL HAUL EXCESS SOIL OFF SITE UNLESS OTHERWISE NOTED BY PROPERTY OWNER.8. ALL FINISHED ELEVATIONS SHALL MATCH ADJOINING PAVEMENT ENSURING SMOOTH TRANSITIONS AND NO TRIPPING HAZARDS.9. CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ALL AREAS DISTURBED DURING CONSTRUCTION TO ORIGINAL CONDITIONS.20 LF 4" DIA. HDPE PIPE0.5% MIN. SLOPE1DT-12DT-1PROPOSED RAIN GARDEN(250 SF)RAIN GARDEN BERMELEV. 57.00'RAIN GARDEN BASEELEV. 56.50'DRAINTECH OUTLET1DT-32DT-2CURB CUT INV.IN 57.00'1DT-2INLET PROTECTIONELEV. 57.00'2DT-2DATE06.09.16DATENo.ARLINGTON PARK5'10'N0SCALE 1" 10'-0"SHEET NAMESITE PLANP-2PROPOSED SITE PLANDIRECT PIPE INTOEXISTING CATCH BASINARLINGTON PARKRAIN GARDEN DEMONSTRATION PROJECTARLINGTON AVENUE AT GRAND STREET, JERSEY CITYHUDSON COUNTY, NEW JERSEYREVISIONSDESCRIPTIONNOTE 1: STONE SHALL BE COMPRISED OF 3"-5" DIAMETER CLEAN, WASHED RIVER STONE. ALL AREAS OF EROSION PROTECTION STONE SHALL BE UNDERLAIN WITHGEOTEXTILE FABRIC (GEOTEX 801 BY PROPEX OR APPROVED EQUIVALENT).APPROVEDCCOARLINGTON AVENUECHECKEDCP5. CONTRACTOR SHALL INSTALL CONVENTIONAL ASPHALT AS SHOWN ON PLAN. THE ASPHALT AND CONCRETE MIXING PLANT, HAULING AND PLACING EQUIPMENT,AND INSTALLATION SHALL BE IN CONFORMANCE WITH NAPA IS 131 AND THE NJDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, 2007 ORLATEST VERSION.DRAWNKTC4. CONTRACTOR SHALL STAKE OUT LOCATIONS OF PROPOSED RAIN GARDENS, STONE CHANNELS, AND TRENCH DRAIN AND OBTAIN APPROVAL FROM ENGINEERPRIOR TO INSTALLATION.06.09.16DATE3. CONTRACTOR SHALL VERIFY ALL PROPOSED MATERIALS WITH PROPERTY OWNER AND ENGINEER PRIOR TO CONSTRUCTION.PROFESSIONAL ENGINEER - NJ LICENSE # 375322. CONTRACTOR SHALL VERIFY ALL INFORMATION INCLUDING ELEVATIONS AND UTILITIES PRIOR TO CONSTRUCTION.CHRISTOPHER C. OBROPTA, Ph.D., P.E.PLAN NOTES:1. CONTRACTOR SHALL SCHEDULE MEETING WITH ENGINEER AND PROPERTY OWNER PRIOR TO MOBILIZATION AND CONSTRUCTION.

JERFEPEPRFEPJE02'4'SCALE 1" 10'-0"SHEET NAMEPLANTING PLANP-3PLANTING 09.1606/09/16DATEPROFESSIONAL ENGINEER - NJ LICENSE # 37532CHRISTOPHER C. OBROPTA, Ph.D., P.E.PerennialsEPEchinacea purpureaJEJuncus effususRFRudbeckia fulgidaDATE1 PLUG1 PLUG1 PLUGPLANT SPECIES LISTNo.REVISIONS755075SIZEARLINGTON PARKRAIN GARDEN DEMONSTRATION PROJECTARLINGTON AVENUE AT GRAND STREET, JERSEY CITYHUDSON COUNTY, NEW JERSEYQUANTITYNPLANT LIST

SHEET NAMEDT-1RAIN GARDEN DETAILSARLINGTON PARKRAIN GARDEN DEMONSTRATION PROJECTARLINGTON STREET AT GRAND STREET, JERSEY CITYHUDSON COUNTY, OVEDCCODATE06.09.1606/09/16DATEPROFESSIONAL ENGINEER - NJ LICENSE # 37532CHRISTOPHER C. OBROPTA, Ph.D., P.E.

SHEET NAMEDT-2CURB CUT DETAILSARLINGTON PARKRAIN GARDEN DEMONSTRATION PROJECTARLINGTON AVENUE AT GRAND STREET, JERSEY CITYHUDSON COUNTY, NEW APPROVEDCCODATE06.09.1606/09/16DATEPROFESSIONAL ENGINEER - NJ LICENSE # 37532CHRISTOPHER C. OBROPTA, Ph.D., P.E.

SHEET NAMEDT-3PLANTING AND LANDSCAPE DETAILSARLINGTON PARKRAIN GARDEN DEMONSTRATION PROJECTARLINGTON AVENUE AT GRAND STREET, JERSEY CITYHUDSON COUNTY, NEW APPROVEDCCODATE06.09.1606/09/16DATEPROFESSIONAL ENGINEER - NJ LICENSE # 37532CHRISTOPHER C. OBROPTA, Ph.D., P.E.

Site Visit: May 20, 2016 – The site was selected for a demonstration rain garden at Arlington Park.

Construction Day 1: July 13, 2016 – Ms. Balladares, the RCE Water Resources Program, and theJersey City DPW excavated the demonstration rain garden.

Construction Day 2: July 15, 2016 – Jersey City DPW provided mulch and assisted the RCE WaterResources Program in spreading the mulch. The RCE Water Resources Program constructed theinlet in preparation for a curb cut.

Construction Day 3: July 21, 2016 – The RCE Water Resources Program added additional sandmixture to the base of the rain garden.

Construction Day 4: August 10, 2016 – Jersey City DPW completed the curb cut and addedadditional mulch to the rain garden.

Construction Day 5: August 15, 2016 – Ms. Balladares, Friends of Arlington Park volunteers, andthe RCE Water Resources Program completed the planting of Arlington Park’s rain garden.

Post Installation: September 16, 2016 – The RCE Water Resources Program inspects the raingarden at Arlington Park and found the garden in good condition.

Arlington Park is a triangular city park at the junction of Grand Street and Arlington Avenue. Stormwater runoff from the adjacent streets can be managed in stormwater planters in the wide sidewalks. Rain gardens could manage stormwater on the site in open lawn areas throughout the park.

Related Documents:

demonstrate Arlington Park's impact on the area as a whole. It is important to note that Arlington Park's economic impact has been paramount to Arlington Heights and to neighboring municipalities. The Arlington Park racetrack was built in 1927 by Harry D. Brown. The park normally hosts over 20 races annually. It sits on 321 acres, or 14 million

SAM GESUALDO 507A 3400 OLD ARLINGTON H RD, ARLINGTON HEIGHTS, IL 60004 PO BOX 8,DEERFIELD,IL,60015 03-08-100-059-1070 2019 0.00 Wheeling Arlington Heights 14 57 29 Yes SANDRA HAUSNER 819 E HACKBERRY DR, ARLINGTON HEIGHTS, IL 60004 819 E HACKBERRY DR,ARLNGTON HTS,IL,60004 03-08-313-003-0000 2019 0.00 Wheeling Arlington Heights 14 53 27 Yes

Arlington Connection. G. ot 10 minutes? Take a . walk to an Arlington . park. Arlington's Park system was just ranked third in the nation by the Trust for Public Land's ParkScore Index. Ninety-nine percent of Arlington residents live within a ten-minute walking distance of at least one of Arlington's 150 parks. The parks offer activities for

Arlington . 76013 : 4 . City of Arlington South Service Center : 1100 SW Green Oaks Boulevard . Arlington : 76017 . 5 : Tarrant County -Courthouse in ArlingtonSub . 700 E Abram Street . Arlington : 76010 . 6 Tarrant County College Southeast Campus EMB - 2100 Southeast Parkway Arlington 76018

CIVIC CENTER NORTH AVENUE OAKLAND CITY KING MEMORIAL GEORGIA STATE LINDBERGH CENTER PEACHTREE CENTER EDGEWOOD-CANDLER PARK INMAN PARK-REYNOLDSTOWN 400 85 Piedmont Park Orme Park Freedom Park Freedom Park Freedom Park Candler Park Freedom Park Springdale Park Virgilee Park Oak Grove Park Bass Recreation Center SpringvalePark Lang

2019 SUMMER CAMP PROGRAM "Where Your Child Is a STAR!" May 30, 2019 Activities Subject to Change GENERAL INFORMATION Park* Mellon Park Park*-Green Wood Lakes Park Park*-Sylvan Park Park*-Merrill Park Park*-Gemini Springs Park*-Kewannee More parks to come. Parents must sign a StarChild Academy "Field Trip General Permission Agreement", form for these

Section I Executive Summary Arlington National Cemetery FY 2017 Funding Profile: . Arlington National Cemetery consists of both Arlington National Cemetery in Arlington, Virginia, and the Soldiers’ and Airmen’s Home National . on average, 27-30 veterans and family members each week

Human Factors and Usability Engineering – Guidance on the regulation of Medical Devices Including Drug-device Combination Products in Great Britain Version 2.0 January 2021 . Human Factors and Usability Engineering – Guidance for Medical Devices Including Drug-device Combination Products MHRA September 2017 v1.0 Page 2 of 35 Contents 1 Introduction and context . 4 2 The regulatory .