TremLock SL INSTALLATION MANUAL - Tremco Roofing

1y ago
24 Views
2 Downloads
1.57 MB
23 Pages
Last View : 11d ago
Last Download : 3m ago
Upload by : Kian Swinton
Transcription

INSTALLATION MANUAL TremLock SL SL www.tremcoroofing.com 3735 Green Road Beachwood, Ohio 44122 1.800.852.6013 50 Beth Nealson Drive Toronto, Ontario M4H 1M6 1.800.668.9879 ? 8/10/18

TremLock SL TremLock SL is a concealed fastener architectural standing seam roof panel. The TremLock SL panels are easily installed over decking, utilizing metal clips. TremLock SL panels are ideally suited for decorative mansard, fascia and roofs. * Other widths available upon request. SUBSTRATE: 24 Gauge Galvalume - Standard Surface. Other gauges and aluminium available upon request. PANEL CONFIGURATIONS: Striated, Ribbed or Flat Pan PANEL WIDTH: 16”, 18”, (and 12” Available Upon Request) PANEL LENGTH: 50’ Standard Maximum Length. Longer lengths available upon request. 3’ 9” Mimimum PANEL HEIGHT: 1 3/4” MINIMUM SLOPE: 3:12 CLIP SPACING: See U.L. 90 Classifications - Roof Deck Construction for maximum clip spacing. U.L. 90 Classifications - Roof Deck Construction: U.L. Class 90 - 24 Ga. minimum panel on 4’ - 0” maximum purlin spacing, per U.L. construction #255 U.L. Class 60 - 24 Ga. minimum panel on 5’ - 0” maximum purlin spacing, per U.L. construction #255 U.L. Class 90 - 24 Ga. minimum panel with clips spaced 36” on center over plywood decking, per U.L. construction #343 U.L. Class 90 - 24 Ga. minimum panel with clips spaced 48” on center over rigid insulation on metal deck, per U.L. construction #468 IMPACT RESISTANCE: UL 2218 - IMPACT: CLASS 4 EXTERNAL FIRE: CLASS A AIR AND WATER INFILTRATION: TremLock SL systems have been tested in accordance with ASTM E1680 and ASTM E1646 procedures. Oil canning (pan wave) of metal panels is inherent in the product and is not cause for panel rejection. 1 L

N O T E S T he details shown on the following pages are suggestions or guidelines for installing the TremLock SL system. The installation details shown here are proven methods of construction, but they are not intended to cover all building requirements, designs or codes. The details may require changes or revisions due to individual project conditions. Installation procedures shall be in accordance with the manufacturer’s printed instructions, details or approved shop drawings. Installers should thoroughly familiarize themselves with all instructions prior to beginning the installation process. The designer / installer is responsible to ensure the following: - That the details here meet the particular building requirements. - Awareness of and allowance for expansion / c ontraction of the roof panels. - That adequate water tightness is maintained. - That a proper uniform substructure is used to avoid panel distortion and that the substructure meets necessary code requirements. - That all supporting members have been examined and are straight, level, and plumb. Tremco Roofing can provide all flashings and accessories shown in the installation drawings unless noted otherwise. Panels, flashing and trim shall be installed true and in proper alignment with any exposed fasteners equally spaced for the best appearance. Sealant shall be field applied on a clean, dry surface. Some field cutting and fitting of panels and flashings is to be expected and to be considered a part of normal installation work. Workmanship shall be of the best industry standards with installation performed by experienced metal craftsmen. Oil canning of metal panels is inherent in the product and is not a cause for rejection. Striated panels are recommended as they reduce the appearance of oil canning. Contents of this manual are subject to change without notice. To confirm this book is the most current copy, please visit Tremco Roofing’s website at www.tremcoroofing.com. 2 L

TremLock SL PANEL HEMMING TOOL TremLock SL Panel Field Notch Field Hem 1 1/2” Panel Hemming Tool TremLock SL Panel Panel Hemming Tool TremLock SL Panel Panel Hemming Tool NOTES: 1. Cut through male and female legs/ribs 1 1/2” up from panel end as shown. 2. Then cut diagonally with metal shears as shown. 3. Place hemming tool over panel tab. 4. Bend down and under to 180 as shown. When the eave drip trim condition is used, the panel lengths need to be 3/4” longer than panels used for offset cleat condition. 3 L

TremLock SL WALL PANEL BASE Min. #30 Felt Paper (Recommended) TremLock SL Panel (Cut as Required) Substructure Min. #30 Felt Paper (Recommended) Use Clip (Pancake Head #10 - 12 x 1” Type A) Fastener to attach Soffit Trim TremLock SL Clip Soffit Soffit Base Trim Min. #30 Felt Paper (Recommended) Substructure TremLock SL Panel TremLock SL Clip Soffit Base Trim NOTES: 1. Soffit base trim should be installed with the clip fastener. 4 L

TremLock SL OUTSIDE CORNER Min. #30 Felt Paper (Recommended) TremLock SL Panel (Field cut as required) Substructure 1” 3 3/4” Pancake Head #10 - 12 x 1” Type A Fastener 2’ - 0” O.C. Corner Trim Substructure Min. #30 Felt Paper (Recommended) TremLock SL Panel Outside Corner Trim NOTES: 1. Attach corner trim with fasteners on 2’-0” centers. 2. Field cut panels, as shown, to fit into corner trim. 5 L

TremLock SL INSIDE CORNER 3 3/4” Substructure 1” Pancake Head #10 - 12 x 1” Type A Fastener 2’ - 0” O.C. Corner Trim TremLock SL Panel Min. #30 Felt Paper (Recommended) Substructural Inside Corner Trim Min. #30 Felt Paper (Recommended) TremLock SL Panel (Field cut as required) NOTES: 1. Attach corner trim with fasteners on 2’-0” centers. 2. Field cut panels, as shown, to fit into corner trim. 6 L

TremLock SL EAVE TO WALL TRANSITION TremLock SL Clip TremLock SL Panel 1” Roll Tape Sealant Offset Cleat Fill Cavity w/Urethane Sealant at End Min. #30 Felt Paper (Recommended) Substructure TremLock SL Panel (Field cut as required) Eave Trim Pancake Head Fastener #10 - 12 x 1” Type A 1’ - 0” O.C. (Must Penetrate Tape Sealant) Perimeter Zee TremLock SL Clip Hex Head Fastener #9 - 15 x 1” Type A Woodgrip (2 per Panel) Pancake Head Fastener #10 - 12 x 1” Type A TremLock SL Panel TremLock SL Clip Offset Cleat Eave Trim Substructure TremLock SL Panel 1” Roll Tape Sealant Perimeter Zee TremLock SL Clip Min. #30 Felt Paper (Recommended) NOTES: 1. 2. 3. 4. 5. Locate a clip approximately 6” down from transition and attach panel. Attach perimeter zee as shown. Secure eave trim to perimeter zee. Apply a continuous run of 1” roll tape sealant on eave trim. Locate offset cleat over tape sealant and fasten to substructure. Pancake head fasteners should penetrate the sealant. 6. Locate a clip approximately 6” up from transition. 7. Before attaching TremLock SL panels, field cut 1 1/2” off the leg of the panel and hem panel. Allow clearance for thermal movement. 7 L

TremLock SL STANDARD EAVE WITH OFFSET CLEAT TremLock SL Clip TremLock SL Panel 1” Roll Tape Sealant Offset Cleat Fill Cavity w/Urethane Sealant at End Min. #30 Felt Paper (Recommended) Pancake Head Fastener #10 - 12 x 1” Type A Substructure Eave Trim 3 1/2” Pancake Head Fastener #10 - 12 x 1” Type A 1’ - 0” O.C. (Must Penetrate Tape Sealant) Perimeter Cleat Attach with Pancake Head Fasteners #10 - 12 x 1” Type A 1’ - 0” O.C. TremLock SL Panel TremLock SL Clip Min. #30 Felt Paper (Recommended) Eave Trim Offset Cleat 1” Roll Tape Sealant Substructure Perimeter Cleat NOTES: 1. 2. 3. 4. Attach perimeter cleat as shown. Secure eave trim to perimeter cleat. Apply a continuous run of 1” roll tape sealant on eave trim. Locate offset cleat over tape sealant and fasten to substructure. Pancake head fasteners should penetrate the sealant. 5. Locate a clip approximately 6” up from transition. 6. Before attaching TremLock SL panels, field cut 1 1/2” off the leg of the panel and hem panel. Allow clearance for thermal movement. 8 L

TremLock SL EAVE WITH STANDARD GUTTER TremLock SL Clip Attach w/Pancake Head Fastener TremLock SL Panel 1” Roll Tape Sealant Offset Cleat Fill Cavity w/Urethane Sealant at End 43D Pop Rivets (2) Min. #30 Felt Paper (Recommended) Gutter Straps 2’-0” O.C. Substructure Pancake Head Fastener #10 - 12 x 1” Type A 1’ - 0” O.C. (Must Penetrate Tape Sealant) Gutter Fastener (Not by Tremco) TremLock SL Panel TremLock SL Clip Min. #30 Felt Paper (Recommended) SUGGESTED FOR HIGH SNOW AREAS SNOW GUARDS REQUIRED TO PREVENT DAMAGE CAUSED BY SLIDING SNOW. Gutter Gutter Strap Substructure Offset Cleat 1” Roll Tape Sealant NOTES: 1. 2. 3. 4. 5. Locate gutter and place a continuous run of 1” roll tape sealant in gutter leg. Locate a gutter strap at 2’-0” on center. Place tape sealant on strap. Locate offset cleat and fasten through cleat, strap, sealant, gutter and into the substructure. Install panel. Allow clearance. Field cut 1 1/2” off leg of panel and hem panel. Field bend gutter strap and attach to gutter with two (2) 43D pop rivets. 9 L

TremLock SL RAKE - STARTING ON MODULE WITHOUT WALL PANEL Rake Trim 43D Pop Rivet 1’ - 0” O.C. TremLock SL Clip Zee Closure w/1” Roll Tape Sealant Top and Bottom TremLock SL Panel 1 3/4” Min. #30 Felt Paper (Recommended) 3 1/2” Perimeter Cleat Substructure Hex Head Fastener #9 - 15 x 1” Type A Woodgrip at 1’ - 0” O.C. (Must Penetrate Sealant) Pancake Head Fastener #10 - 12 x 1” Type A Pancake Head #10 - 12 x 1” Type A at 1’ - 0” O.C. Zee Closure w/1” Roll Tape Sealant Top and Bottom Rake Trim TremLock SL Panel Perimeter Cleat Substructure NOTES: 1. 2. 3. 4. Start a TremLock SL panel on the wood or steel-line as shown. Apply a continuous run of 1” roll tape sealant under zee closure before fastening. Apply a continuous run of 1” roll tape sealant over zee closure before fastening rake trim. Fasten perimeter cleat per dimension shown. Follow roof slope, and then attach rake trim. 10 L Min. #30 Felt Paper (Recommended)

TremLock SL RAKE - TERMINATING OFF MODULE W/O WALL PANELS 43D Pop Rivet at 1’ - 0” O.C. TremLock SL Clip Rake Trim Zee Closure w/1” Roll Tape Sealant Top and Bottom TremLock SL Panel 1 3/4” Min. #30 Felt Paper (Recommended) 3 1/2” Hex Head Fastener #9 - 15 x 1” Type A Woodgrip at 1’ - 0” O.C. (Must Penetrate Sealant) Pancake Head Fastener #10 - 12 x 1” Type A Substructure Perimeter Cleat Attach with Pancake Head Fastener #10 - 12 x 1” Type A at 1’ - 0” O.C. Zee Closure w/1” Roll Tape Sealant Top and Bottom TremLock SL Panel Min. #30 Felt Paper (Recommended) Rake Trim Perimeter Cleat Substructure NOTES: 1. 2. 3. 4. 5. Field cut TremLock SL panel as required. Apply a continuous run of 1” roll tape sealant under zee closure before fastening. Attach zee closure with #9 - 15 x 1” fasteners on 1’-0” centers. Apply a continuous run of 1” roll tape sealant over zee closure before fastening rake trim. Fasten perimeter cleat as shown. Follow roof slope, and then attach rake trim. 11 L

TremLock SL RIDGE / HIP Ridge/Hip Trim Zee Closure (Field Cut) w/1” Roll Tape Sealant Top and Bottom ax. 5” M itch On P Butyl Tube Sealant 43D Pop Rivet at 0’ - 6” O.C. TremLock SL Panel TremLock SL Clip Pancake Head Fastener Min. #30 #10 - 12 x 1” Type A Felt Paper (Recommended) Hex Head Fastener #9 - 15 x 1” Type A Woodgrip (2 Per Panel) Substructure Ridge/Hip Trim TremLock SL Panel 1” Roll Tape Sealant Zee Closure 1” Roll Tape Sealant Min. #30 Felt Paper (Recommended) TremLock SL Clip Substructure 1” Roll Tape Sealant 2” Minimum Lap RIDGE TRIM LAP NOTES: 1. Install panels with a clip approximately 1'-0” downhill on each side of the ridge or hip. 2. Apply a continuous run of 1” roll tape sealant between the panel legs about 5" maximum down from centerline of ridge. 3. Field cut and attach zee closure with two (2) #9 - 15 x 1” fasteners through closure, sealant, panel and into substructure. See detail for location dimension. 4. Apply tube sealant to zee closure and panel ribs. 5. Apply a continuous run of 1” roll tape sealant to top of “Z” closure. 6. Attach ridge/hip trim to zee closure with a 43D pop rivet on 6" centers. 7. Lap ridge/hip trim with 1” roll tape sealant and pop rivets as shown. Lap away from the prevailing wind direction. Attach with 43D pop rivets 4" on center maximum. 12 L

TremLock SL HIGH SIDE EAVE WITHOUT WALL PANEL Butyl Tube Sealant Hi-Side Trim 4 5/ 8” On Max. Pitc h 5 1/4” 43D Pop Rivet at 0’ - 6” O.C. Zee Closure (Field Cut) w/1” Roll Tape Sealant Top and Bottom TremLock SL Clip TremLock SL Panel 30# Felt Paper (Recommended) Substructure Perimeter Cleat Substructure Hex Head Fastener #9 - 15 x 1” Type A Woodgrip (2 Required per Panel) Pancake Head Fastener #10 - 12 x 1” Type A at 1’ - 0” O.C. TremLock SL Panel Zee Closure (Field Cut) w/1” Roll Tape Sealant Top and Bottom TremLock SL Clip Hi-Side Trim TremLock SL Panel Min. #30 Felt Paper (Recommended) Perimeter Cleat Substructure NOTES: 1. Place a continuous run of 1” tape sealant between the panel legs. 2. Field cut and attach zee closure with two (2) #9 - 15 x 1” fasteners through closure, sealant, panel and into substructure. 3. Apply tube sealant to zee closure and panel ribs. 4. Attach sidewall perimeter zee. 5. Slide hi-side trim over perimeter zee, before attaching to zee closure. Place a run of 1” tape over zee closure. 6. Attach hi-side trim to zee closure with 43D pop rivets on 0'-6'' centers. 13 L

TremLock SL HIGH SIDE EAVE WITH WALL PANEL 4 5/ 8” On Max. Pitc h Hi-Side Trim 43D Pop Rivet at 0’ - 6” O.C. Zee Closure (Field Cut) w/1” Roll Tape Sealant Top and Bottom Butyl Tube Sealant TremLock SL Clip 5 1/4” TremLock SL Panel Perimeter Zee Hex Head Fastener #9 - 15 x 1” Substructure Type A Woodgrip (2 Required per Panel) Hex Head Fastener #9 - 15 x 1” Type A Woodgrip (2 Required per Panel) Pancake Head Fastener #10 - 12 x 1” Type A TremLock SL Panel Min. #30 Felt Paper (Recommended) Hi-Side Trim Perimeter Zee Zee Closure w/1” Roll Tape Sealant Top and Bottom TremLock SL Clip TremLock SL Panel Min. #30 Felt Paper (Recommended) TremLock SL Panel TremLock SL Clip Substructure Min. #30 Felt Paper (Recommended) NOTES: 1. Place a continuous run of 1” tape sealant between the panel legs. 2. Field cut and attach zee closure with two (2) #9 - 15 x 1” fasteners through closure, sealant, panel and into substructure. 3. Apply tube sealant to zee closure and panel ribs. 4. Attach sidewall perimeter cleat. 5. Slide hi-side trim over perimeter cleat, before attaching to zee closure. Place a run of 1” tape over zee closure. 6. Attach hi-side trim to zee closure with 43D pop rivets on 0'-6'' centers. 14 L

TremLock SL VALLEY TremLock SL Panel TremLock SL Clip Fill Cavity w/Urethane Sealant at End 1” Roll Tape Sealant Valley Trim Pancake Head Fastener #10 - 12 x 1” Type A Pancake Head Fastener #10 - 12 x 1” Type A at 1’ - 0” O.C. (Must Penetrate Tape Sealant) Substructure Offset Cleat 4” Typical Min. #30 Felt Paper (Recommended) Pancake Head Fastener #10 - 12 x 1” Type A at 1’ - 0” O.C. (Must Penetrate Tape Sealant) TremLock SL Panel TremLock SL Clip Valley Trim Min. #30 Felt Paper (Recommended) 1” Roll Tape Sealant Min. #30 Felt Paper (Recommended) Substructure Offset Cleat NOTES: 1. Locate valley trim over substructure. 2. Apply a continuous run of 1” roll tape sealant over valley trim and under offset cleat. 3. Locate offset cleat approximately 4” from center of valley trim and fasten through cleat, sealant, valley trim and into substructure. 4. Locate a clip 6” from end of panel. 5. Field cut 1 1/2” off leg of panel and hem panel. Allow clearance for thermal movement. 15 L

TremLock SL START RAKE TIE-IN - ENDWALL PARAPET Sealant (Not by Tremco) Parapet Wall Counter Flashing (Not by Tremco) Tie-In Trim 43D Pop Rivet at 1’ - 0” O.C. 3 5/8” Min. Zee Closure (Field Cut) w/1” Roll Tape Top and Bottom Hex Head Fastener #9 - 15 x 1” Type A Woodgrip at 1’ - 0” O.C. (Must Penetrate Sealant) Parapet Wall TremLock SL Panel TremLock SL Clip Min. #30 Felt Paper (Recommended) Substructure Pancake Head Fastener #10 - 12 x 1” Type A Counter Flashing (Not by Tremco) Tie-In Trim Zee Closure TremLock SL Panel Min. #30 Felt Paper (Recommended) Substructure NOTES: 1. After panels are installed, cut termination at wall if required. 2. Apply a continuous run of 1” roll tape sealant on panel approximately 1 1/2” in from edge of substructure. 3. Locate zee closure over tape sealant and attach with #9 - 15 x 1” fasteners on 1'- 0" centers. 4. Apply a continuous run of 1” roll tape sealant over zee closure. 5. Fasten tie-in trim to zee closure with 43D pop rivets on 1’- 0” centers. 6. Counter flashing and sealant are not by Tremco Roofing. 16 L

TremLock SL FINISH RAKE TIE-IN - ENDWALL PARAPET Sealant (Not by Tremco) Parapet Wall Counter Flashing (Not by Tremco) Tie-In Trim 43D Pop Rivet at 1’ - 0” O.C. TremLock SL Panel Zee Closure (Field Cut) w/1” Roll Tape Top and Bottom TremLock SL Clip Min. #30 Felt Paper (Recommended) Substructure Pancake Head Fastener #10 - 12 x 1” Type A Counter Flashing (Not by Tremco) TremLock SL Panel 3 5/8” Minimum Hex Head Fastener #9 - 15 x 1” Type A Woodgrip 1’ - 0” O.C. (Must Penetrate Sealant) Parapet Wall Tie-In Trim Zee Closure Min. #30 Felt Paper (Recommended) Substructure NOTES: 1. After panels are installed, cut termination at wall if required. 2. Apply a continuous run of 1” roll tape sealant on panel approximately 1 1/2" in from edge of substructure. 3. Locate zee closure over tape sealant and attach with #9 - 15 x 1” fasteners on 1'-0" centers. 4. Apply a continuous run of 1" roll tape sealant over zee closure. 5. Fasten tie-in trim to zee closure with 43D pop rivets on 1'-O" centers. 6. Counter flashing and sealant are not by Tremco Roofing. 17 L

TremLock SL START RAKE TIE-IN - ENDWALL WITH WALL PANEL Exterior Wall Panels (Optional) Substructure 43D Pop Rivet at 1’ - 0” O.C. Fastener 1’ - 0” O.C. (Not by Tremco) Zee Closure (Field Cut) w/1” Roll Tape Sealant Top and Bottom Tie-In Trim TremLock SL Panel Min. #30 Felt Paper (Recommended) TremLock SL Clip Substructure Pancake Head Fastener #10 - 12 x 1” Type A Hex Head Fastener #9 - 15 x 1” Type A Woodgrip 1’ - 0” O.C. (Must Penetrate Tape Sealant) Exterior Wall Panels (Optional) Tie-In Trim TremLock SL Panel Zee Closure w/1” Roll Tape Sealant (Top and Bottom) Min. #30 Felt Paper (Recommended) Substructure NOTES: 1. After panels are installed, cut termination at wall if required. 2. Apply a continuous run of 1" roll tape sealant on panel approximately 1 1/2" in from edge of substructure. 3. Locate zee closure over tape sealant and attach with #9 - 15 x 1” fasteners on 1'-0” centers. 4. Apply a continuous run of 1" roll tape sealant over zee closure. 5. Fasten tie-in trim to zee closure with 43D pop rivets on 1’-0” centers. Fastener for trim to substructure is not by Tremco Roofing. 18 L

TremLock SL HIGH SIDE TIE-IN - SIDEWALL PARAPET ABOVE ROOFLINE Parapet Wall Sealant (Not by Tremco) Fastener (Not by Tremco) Counter Flashing (Not by Tremco) Tie-In Trim 43D Pop Rivet at 0’ - 6” O.C. ax. 6” M Zee Closure (Field Cut) w/1” Roll Tape Sealant Top and Bottom TremLock SL Panel Butyl Tube Sealant TremLock SL Clip Min. #30 Felt Paper (Recommended) Pancake Head Fastener #10 - 12 x 1” Type A Substructure Hex Head Fastener #9 - 15 x 1” Type A Woodgrip 2 Required per Panel (Must Penetrate Tape Sealant) Counter Flashing (Not by Tremco) Sealant (Not by Tremco) Parapet Wall Tie-In Trim Zee Closure w/1” Roll Tape Sealant (Top and Bottom) TremLock SL Panel Min. #30 Felt Paper (Recommended) Substructure NOTES: 1. After panels are installed, place a continuous run of 1” roll tape sealant approximately 6” from edge of wall subtructure. 2. Field cut zee closure and install over tape sealant and attach with two (2) #9 - 15 x 1” fasteners through closure, sealant, panel and into substructure. Locate as shown. 3. Apply tube sealant to zee closure and panel ribs. 4. Apply a continuous run of 1” roll tape sealant over zee closure and fasten trim to closure with 43D pop rivets on 6" centers. Use tube sealant at closure. 5. Fasteners for attachment to parapet wall is not by Tremco Roofing. 6. Counter flashing and sealant to parapet wall are not by Tremco Roofing. 19 L

TremLock SL HIGH SIDE TIE-IN - SIDEWALL WITH WALL PANELS ax. 6” M Fastener (Not by Tremco) Tie-In Trim 43D Pop Rivet at 0’ - 6” O.C. Butyl Tube Sealant Zee Closure (Field Cut) 1” Roll Tape Sealant (Not by Tremco) TremLock SL Clip TremLock SL Panel Min. #30 Felt Paper (Recommended) Substructure Pancake Head Fastener #10 - 12 x 1” Type A Hex Head Fastener #9 - 15 x 1” Type A Woodgrip 2 Required per Panel (Must Penetrate Tape Sealant) Exterior Wall Panels (Optional) Tie-In Trim Zee Closure 1” Roll Tape Sealant (Top and Bottom) TremLock SL Panel TremLock SL Clip Min. #30 Felt Paper (Recommended) Substructure NOTES: 1. After panels are installed, place a continuous run of 1” roll tape sealant approximately 6" from edge of wall substructure. 2. Field cut zee closure and install over tape sealant and attach with two (2) #9 -15 x 1” fasteners through closure, sealant, panel and into substructure. Locate as shown. 3. Apply tube sealant to zee closure and panel ribs. 4. Apply a continuous run of 1” roll tape sealant over zee closure and fasten trim to closure with 43D pop rivet on 6” centers. Use tube sealant at closure. 5. Fasteners for attachment to wall substructure are not by Tremco Roofing. 20 L

TremLock SL ROOF JACK INSTALLATION Dektite Tube Sealant Field cut hole as per note #2 NOTES: 1. Before cutting hole in sheet, consider the best position to suit size of Dektite selected. 2. Cut a neat hole with minimum clearance for pipe and install pipe. 3. Rubber sleeve should be a watertight fit on pipe. If rubber has to be cut, a neat hole 1/2” dia. less than outside pipe diameter should be cut in Dektite . Use a sharp pair of scissors and avoid nicks. 4. Apply tube sealant to underside of base and, using water as lubricant, slide flashing along until it meets sheet. 5. Hand press Dektite base on to sheet, pressing base firmly to sheet to avoid gaps, progressively drill and fasten to sheet. Fasten to panel with 1/4 - 14 x 7/8” LAPTEK ZAC Fasteners. 21 L

www.tremcoroofing.com 3735 Green Road Beachwood, Ohio 44122 1.800.852.6013 50 Beth Nealson Drive Toronto, Ontario M4H 1M6 1.800.668.9879 ? 8/10/18

PANEL HEMMING TOOL TremLock SL Field Hem 1 1/2" TremLock SLPanel TremLock SL Panel TremLock SL Panel Field Notch Panel Hemming Tool Panel Hemming Tool Panel Hemming Tool NOTES: 1. Cut through male and female legs/ribs 1 1/2" up from panel end as shown. 2. Then cut diagonally with metal shears as shown. 3. Place hemming tool over panel tab. 4.

Related Documents:

Tremco PUMA Technology Overview Tremco’s Vulkem EWS traffic coating systems and select TREMproof PUMA below-grade waterproofing systems feature PUMA (polyurethane-methacrylate) technology, which allows for enhanced performance and dur

2. The roofing contractor shall be responsible for the inspection of the deck surface as to suitability for roofing and notify the general contractor and architect / owner of any defects that require

also marketed by Tremco CPG in Asia Pacific. Faster Construction Time Lightweight, fast-curing and prefabricated products mean less occupant disruption, faster return to service, less revenue lost, and no call-backs. Stronger and More Resilient Our systems are designed for maximum durability, many with service lives far surpassing

5.3. STAFInst Uninstall 6. Platform Installation Notes 6.1. Linux installation 6.2. AIX installation 6.3. HP-UX IA64 64-bit installation 6.4. IBM i 32-bit (previously known as i5/OS or OS/400) installation 6.5. z/OS installation 6.6. FreeBSD installation 6.7. Mac OS X installation 6.8. Solaris installation 7. Environment Variable Settings 7.1.

Installation structions 5 3.17 This document provides the basic and typical instructions for the installation of Securock ExoAir 430 System to qualify for the Securock ExoAir 430 Warranty. Jobsite-specific

This installation manual is part of and shipped with the unit, and contains information on its safe installation. Read this installation manual completely before installing the unit. This installation manual must be kept available to installers at all times at the installation loca- tion. Keep this installation manual on hand throughout

Manual Part 3, Installation and Commission 1 VTA100004 Manual Part 4, Communication 1VTA100005 Motor Protection with ATEX Certification, Manual 1MRS755862 Operator’s Manual 1MRS755869 Protection Manual 1MRS755860 Technical Catalogue 1MRS755859 Technical Reference Modbus RTU 1MRS755868 Web Manual, Installation 1MRS755865 Web Manual, Operation .

Andreas Wimmer, Indra de Soysa, Christian Wagner Number 61 Political Science Tools for Assessing Feasibility and Sustainability of Reforms ZEF – Discussion Papers on Development Policy Bonn, February 2003. The CENTER FORDEVELOPMENT RESEARCH (ZEF) was established in 1997 as an international, interdisciplinary research institute at the University of Bonn. Research and teaching at ZEF aims to .