Distribution System Loss Powersolv Incorporated

Efficiency of Systems Energy systems have losses. Conversion of energy cannot achieve 100% efficiency. Transport of energy cannot achieve 100% efficiency. Fuel Refinery / Depot Powersolv Incorporated Fuel Tank Truck Fuel Station

Distribution System Loss Energy Input Distribution Network Energy Output Powersolv Incorporated Energy Loss

Distribution System Loss Primary Distribution Lines (Main Feeder) Subtransmission Lines Substation Transformer Primary Distribution Lines (Laterals) Energy delivered to the Distribution Network Misc Loads Secondary Distribution Lines Service Drop Energy delivered to the Distribution Distribution Users Transformer Residential Distribution System Loss Powersolv Incorporated Commercial Industrial

Distribution System Loss Technical Loss Non-Technical Loss Conductor Loss or Load Loss Direct Theft and Illegal Connection Core Loss or No-Load Loss Meter Error Billing Irregularity Powersolv Incorporated

Technical Losses Technical loss is energy loss due to the physics of the system: It is the physical properties of the components of the network that induces energy losses. Powersolv Incorporated

Technical Loss: Conductor Loss or Load Loss Wires (conductors) have electrical resistance – a property of materials to resist the current. Resistance Resistivity 𝐿𝑒𝑛𝑔𝑡 𝐴𝑟𝑒𝑎 Resistivity depends on wire material. Length depends on distance between source and load. Area (cross-sectional) depends on wire size. Powersolv Incorporated

Technical Loss: Conductor Loss or Load Loss Conductor loss is energy lost to overcome this resistance, and manifests as heat. Conductor Loss 𝐶𝑢𝑟𝑟𝑒𝑛𝑡 2 𝑅𝑒𝑠𝑖𝑠𝑡𝑎𝑛𝑐𝑒 Current depends mostly on characteristics of the load (hence, load loss). The distribution network also has effects on the current. Powersolv Incorporated

Technical Loss: Transformer Core Loss or No-Load Loss No-Load Loss: When a transformer is energized, even when no load is connected, it already uses energy. The energy loss here is associated with the transformer core. Powersolv Incorporated

Where do technical losses it occur? Primary Distribution Lines (Main Feeder) Subtransmission Lines Substation Transformer a) Sub-transmission Lines b) Substation Power Transformers c) Primary Distribution Lines d) Distribution Transformers e) Secondary Distribution Lines Distribution Transformer f) Service Drops g) Voltage Regulators h) Capacitors i) Reactors j) Other electrical equipment Powersolv Incorporated Primary Distribution Lines (Laterals) Misc Loads Secondary Distribution Lines Service Drop Residential Commercial Industrial

Non-technical Loss Non-technical Loss is energy loss due to human errors, whether intentional or not. Powersolv Incorporated

Examples of Non-technical Loss Illegal Connection and Direct Theft Non-customer connects to network and draws energy. Customer connects to network and draws energy but bypasses meter. Meter Error Customer tampers with meter to reduce the energy it reads, thereby reducing customer’s electric bill. Defective meter, wear and tear, meter quality Billing irregularity Meter reader connives with customer to reflect lower meter reading. Billed energy is not accurate; may be due to errors in billing system or by billing personnel – honest errors and otherwise. Powersolv Incorporated

Distribution System Loss Energy delivered to the Distribution Network Metered and billed to distribution utility (DU) Energy delivered to the Distribution Users Metered and billed by DU to its customers Distribution System Loss Technical Loss Can be obtained through technical simulations Powersolv Incorporated Calculated as difference of input and output Non-technical Loss Calculated as what’s left after everything has been accounted for

System Loss Rate Powersolv Incorporated

System Loss Rate ERC Res. No. 26 Series of 2009, Article II Section 4: 𝑆𝐿𝑅 𝑇𝐺𝑅 𝐴𝑇𝑅 𝑈 𝑂𝑆𝐿𝐴 Where SLR System Loss Rate, in PhP/kWh; TGR Total Generation Rate, in PhP/kWh; ATR Average Transmission Rate, in PhP/kWh; U Gross-Up Factor, in % (see next slide – this factor is related to actual system loss and system loss cap); and OSLA Other System Loss Cost Adjustments, in PhP/kWh. Powersolv Incorporated

System Loss Rate – Gross-Up Factor ERC Res. No. 26 Series of 2009, Article II Section 4: %𝑆𝐿 𝑈 1 %𝑆𝐿𝑎 Where U Gross-Up Factor, in %; %SL Equal to either : (1) actual system loss for the most recent 12-month period; or (2) the system loss cap, whichever is lower; and %SLa The actual system loss for the most recent 12-month period. Powersolv Incorporated

Distribution Rate, CAPEX and OPEX 𝐶𝐴𝑃𝐸𝑋 𝑂𝑃𝐸𝑋 𝑇𝑎𝑥𝑒𝑠 0.5 𝑂𝑅𝐼 𝑅𝑎𝑡𝑒 𝑘𝑊ℎ𝑓𝑜𝑟𝑒𝑐𝑎𝑠𝑡 Where Rate Distribution rate, in PhP/kWh; CAPEX Capital expenses to be undertaken, in PhP; OPEX Operating expenses of the DU, in PhP; Taxes Taxes to be paid by the DU, in PhP; ORI Other revenue items, in PhP; and kWhforecast Energy forecast, in kWh. Powersolv Incorporated

Price-Linked Incentives Price-linked performance incentives to electric cooperatives and private distribution utilities for distribution efficiency Rate impact of incentives is based on distribution rate In various RDWRs for private distribution utilities, and the RSEC-WR/TGP Rules for electric cooperatives RDWR Rules for Setting Distribution Wheeling Rates (private DUs) RSEC-WR Rules for Setting Electric Cooperatives Wheeling Rates TGP Rules Tariff Glide Path Rules Powersolv Incorporated

Price-Linked Incentives Private Distribution Utilities Electric Cooperatives System Loss Rate Impact 7.5% SL 8.5% None 6.5% SL 7.5% 0.0625% SL 6.5% 0.1250% System Loss Rate Impact SL Cap . None Cap–1% SL Cap . 0.30% Cap–2% SL Cap–1% 0.50% Cap–4% SL Cap–2% 0.70% SL Cap–4% 0.90% Notes: 1. Rate impact is expressed as a percentage of the distribution rate. 2. Rate impact for electric cooperatives will halve after their First Regulatory Period. Powersolv Incorporated

Distribution Transformer Commercial Industrial Misc Loads Secondary Distribution Lines Service Drop a) Sub-transmission Lines b)Substation Power Transformers c) Primary Distribution Lines d)Distribution Transformers e)Secondary Distribution Lines f) Service Drops g) Voltage Regulators

Related Documents:

NG COMPANY LIMITED CORNELIUS MUSEMBI MUSYOKA ERC/SWHST/00089P.O. Box 402- 00100 NAIROBI Email: info@ezexengineerin g.com 27/02/2019 49. ERC/SWHST/00056 ERC/SWHC/00067 ENABLE GREEN ENERGY LIMITED JONES MUTUA P.O. Box 1091 - 80200 MALINDI Email: technical@ege.co.ke 17/04/2019 50. ERC/SWHC/00011 1 HYPERTECK ELECTRICAL SERVICES

European Research Council (ERC) Proposal template for ERC Starting Grant 2019 Administrative forms (Part A) . ERC Keyword 1* As first keyword please choose one which is linked to the Primary Review Panel. . standards of research integrity — as set out, for instance, in the European Code of Conduct for Research Integrity — and .

Indicative summary of main calls from the 2016 budget1 Starting Grant Consolidator Grant Advanced Grant Call identifier ERC-2016-StG ERC-2016-CoG ERC-2016-AdG Call Opens 29 July 2015 15 October 2015 24 May 2016 Deadline 17 November 2015 2 February 2016 1 September 2016 Budget million EUR (estimated grants) 485 (335) 605 (335) 540 (235)

Eligibility Requirements Percentage of Wages A GUIDE TO EMPLOYEE RETENTION CREDITS (ERC) 3 Key Provisions of the ERC Qualified wages paid after March 12, 2020 to December 31, 2020 Qualified wages paid January 1, 2021 to December 31, 2021 (credit computed for

Machine for Industrial Applications A 934 C HD ERC Operating Weight: 92,370 – 94,360 lbs Engine Output (SAE J1349): 129 kW / 173 HP Engine Output (ISO 9249): 129 kW / 175 HP With the award-winning ERC syst

1 About this guide 1.1 Introduction User Guide AxioCam ERc 5s V 2.0 en 3 About this guide1 Introduction1.1 1.1 Introduction Welcome to the AxioCam ERc 5s user guide. The camera is a high-resolution digital camera with a color CMOS sensor for light-microscopy applications. To make it easier for you to set up the camera, please

European Common Allocation Table - Frequency bands within 9 kHz - 275 GHz ERC Report 25 Annex 1 RR Region 1 Allocations and RR footnotes relevant to CEPT and frequency band European Common Allocation Utilisation EU-footnote ERC Document Standard Note 9 - 14 kHz RADIONAVIGATION EU2 Inductive SRD ERC DEC (01)13

in Autodesk AutoCAD 2016 software is easier to work with and reduces eye strain. Start Tab The Start tab (formerly the New tab) is filled with information and speedy ways for you to start new drawings or edit existing ones. The Start tab contains two helpful sliding content frames: Learn and Create. The Create page makes it easy for you to start a new drawing, access recent files, and .