Marvel BMS Communications - United CoolAir

1y ago
6 Views
1 Downloads
2.65 MB
10 Pages
Last View : 1m ago
Last Download : 3m ago
Upload by : Audrey Hope
Transcription

Marvel BMS communications Installation, Operation and Maintenance Manual Effective February 2017 ***Interactive PDF***

Installation, Operation and Maintenance Manual Marvel BMS Contents General Purpose 3 Components 4 Architectural Layout 5 General Serial Card Installation 6 Initial installation. 6 Connection Setup from Marvel to Serial Card 6 Network Connection Settings and Access 6 Accessing Bacnet network settings. 6 PCONET adjustable parameters for Bacnet protocol. Bacnet MS/TP setup. 7 PCOWEB adjustable parameters for Bacnet protocol. Bacnet IP setup. 7 LonWorks setup 7 Modbus setup 7 Points list’s referencing 7 CSV Files 8 Troubleshooting 9 Subject to change without notice. 2 120.5-IM (0217)

Installation, Operation and Maintenance Manual Marvel BMS General Purpose The Marvel BMS communications availability is designed to give a general control and monitoring ability to any of the Marvel controllers. It is not designed to control the actual individual components of the units. The Marvel controls program is designed to maximize efficiency of the unit and will follow through with its own sequence of operations. on off, Alarm monitoring, status monitoring, conditions monitoring, and set points access. All Marvel equipment can communicate via Bacnet, Modbus, and LonWorks. All controllers require a serial communications card which is not a standard option for a Marvel controller to communicate to a BM system. The only exception is the Marvel controllers utilizing the pCO 5 controller. The pCO 5 controller can communicate via Modbus without a serial card. All other types of BMS communication will require a serial card for the pCO 5. The BMS communications can be used on all of the existing Marvel controllers and although some may have more ability than others they all have ability’s that are most commonly associated with a BMS management system such as system NO BMS HERE BMS GOES HERE Subject to change without notice. 3 120.5-IM (0217)

Installation, Operation and Maintenance Manual Marvel BMS Components There are several different types of communication cards available to communicate via BMS. LonWorks (FIG1) Bacnet mstp (FIG2) Bacnet/Modbus IP (FIG3) Modbus mstp (FIG4) Fig 1 Fig 2 Fig 3 Fig 4 Subject to change without notice. 4 120.5-IM (0217)

Installation, Operation and Maintenance Manual Marvel BMS Architectural Layout Subject to change without notice. 5 120.5-IM (0217)

Installation, Operation and Maintenance Manual Marvel BMS General Serial Card Installation Initial installation. It’s important to know what type of communications will be required at the building and or what the Marvel will be required to connect to. It’s important to understand the architecture first before installing a serial card or attempting to connect via your BMS communications. Once you know what card you are going to be installing you can remove the cover from the serial card bay. Then you can insert the card carefully into the bay and dock it to the connection. Place the new serial card cover in place of the stock cover you removed in the first step. Network Connection Settings and Access The serial cards have their own wiring connections built in and those will be the connections utilized for the proper operation and communication of the Marvel controller over BMS. To access settings that will be used by the network, follow the appropriate protocol. The steps may be different depending on the type of BMS protocol to be used. Accessing Bacnet network settings. To verify the installation is complete reference the operation lights on the serial cards when the controller is turned on to verify it was loaded into the bay properly. For new units with the PGD1 display you will [hold in the buttons Alarm and Enter] until you see a screen change. Once you see the screen change you have pressed the buttons correctly and can release them. The next step is to scroll to the “Other information”. Connection Setup from Marvel to Serial Card Once your serial card is in the Marvel Controller, you will need to setup the communication between the Marvel Controller and the Serial card that was installed. Boot the controller and use the keypad provided to access the main menu list. Scroll down to the BMS setup. Inside the BMS setup there are only 3 options to setup. These settings pertain to the communication between the Marvel Controller and the Serial card only. This is not setting up any connection in regards to the BMS server and its network. The Protocol: set this to the desired BMS protocol. The Ident: Must stay at 001 for all BMS protocols The Baud Rate: Must stay at 19200 for Bacnet and Modbus and must be at 4800 for LonWorks. Subject to change without notice. 6 120.5-IM (0217)

Installation, Operation and Maintenance Manual Marvel BMS the information in the rare case of saving trouble repeat the steps above it will eventually save your settings. PCONET adjustable parameters for Bacnet protocol. Bacnet MS/TP setup. You can setup various aspects of the Bacnet protocol for your network in this page. You can adjust options such as the Bacnet ID, the Bacnet Baud, The Bacnet MAC address, the max masters and the max frames. The last menu option is the update current info option. You simply have to select NO to restart at the top or YES to save the information entered on this page. PCOWEB adjustable parameters for Bacnet protocol. Bacnet IP setup. For Bacnet WEB applications you can set up options like your DHCP MODE, IP address, and Net mask, Gateway, DNS1, DNS2, Bacnet ID and Bacnet Type of IP or Ethernet. The last menu option is the update current info option. You simply have to select NO to restart at the top or YES to save the information entered on this page. LonWorks setup Select the PCOWEB/PCONET settings next. The next menu will allow you to choose the most appropriate selection based on the type of BMS you are using. WEB for IP or Ethernet and NET for rs-485 applications. The pCO web application is more complicated to initially start up. The CAREL manual specifically for the pCO web can be found here. http://www. carelusa.com/product/pcoweb-card/. LonWorks requires factory setup of the LonWorks cards. The cards firstly must all have the same SPID number to communicate on the same network. This is crucial. UCA facility’s handle the setup and configuration of the LonWorks card itself. Some field adjustment will likely be required. Modbus setup Sometimes it is difficult to get the changes to save. If this happens revert the settings back to factory and then try to save. Factory settings usually save then go back to your settings. It saves with a higher percentage when the wiring is OFF of the controller’s BMS card. Continue to try to save Subject to change without notice. Modbus only requires the setup as shown in Connection Setup from Marvel to Serial Card, once the protocol is set to Modbus, it will be ready to communicate. 7 120.5-IM (0217)

Installation, Operation and Maintenance Manual Marvel BMS Points list’s referencing UCA will provide points list’s for the different programs on the website. www.unitedcoolair.com/ the points lists are laid out in a table. The table can be navigated as such in the example below. Notice the following from left to right. On the top of the page there is the header information. It has listed the different protocols and what their programmed access point number is for the variable. R/W stands for read write capability. If there is an R/W you can write and read the Bacnet Modbus Carel Binary Digital Digital 1 10002 2 values. If there is only an R you can only read the values. The description lists a description of what the variable is based on its operation or control. The first row there it is understood that the variable will turn the system on and off. The Value range column simply shows the available values and if necessary what those values represent. LonWorks has their own specific tables but are laid out the same way. R/W United CoolAir Description Value Range 1 R/W Keypad - System On/Off 0 Off, 1 On 10003 2 R Operating Mode - Cooling 1 Cooling Analog Analog Analog 1 40002 1 R Room/Return Air Temperature -450 - 1850 2 40003 2 R Outdoor Air Temperature -450 - 1850 Integer Integer Integer 1 40130 1 R Supply Blower Run Hours 2 40131 2 R Compressor 1 Run Hours CSV Files At the current time ALL programs have the BMS descriptions built into the Bacnet communications. These descriptions can be pulled from the card under “Discovery Mode”. This means that a points list will not be necessary for marvel point’s description assignment. possible, the efficiency setup is kept intact when the system maintains its sequence of operations that are carefully programmed by the factory. There is a vast amount of manual control points that can be controlled by a BMS system. Their main function is for testing of equipment not for operating them on a daily bases. It is a must to read and understand the computer controller IOM for your unit prior to attempting to control/monitor anything other than your system on off and occupied unoccupied control. TIPs on points to control. There must be a great deal of thought when choosing how to control the unit. UCA units can be independently controlled entirely on their own. They are setup to be as efficient as Subject to change without notice. 8 120.5-IM (0217)

Installation, Operation and Maintenance Manual Marvel BMS Troubleshooting It is very important to eliminate possibility of field errors before adjusting the controller. No field wiring, network, or BMS server programming are addressed here. Issue Possible cause Remedy Failure to communicate to the board BMS connection placed on the control Verify the bms cable is landed ONLY on entirely Attempt1 board’s communication ports and not the serial card ports and not the Rxtx the serial card communication ports on the CAREL board or the Ethernet port on the control board. Failure to communicate to the board BMS setup is not properly set for the Enter the BMS setup in the programs entirely Attempt2 protocol in the controller main menu and verify the protocol and baud rate is setup as prescribed. Failure to communicate to board Pco net/web may not be properly setup Verify the Pcoweb/Pconet settings entirely Attempt3 Bacnet protocols only in the field configuration area. were configured properly as specified in the Network Connection Settings And Access section BMS communication is connected but BMS setup is not properly set for the Enter the BMS setup in the programs no values or points can be pulled protocol in the controller because the main menu and verify the protocol and serial card can’t read the boards output baud rate is setup as prescribed. BMS cannot read certain units in the The individual addresses may be setup Verify the Pcoweb/Pconet settings network improperly or not at all. were configured properly as specified For Bacnet mstp, the termination in the Network Connection Settings jumpers on the serial card are not And Access section installed properly for the installation of Adjust jumpers on Bacnet mstp cards the field setup. correctly per field requirements Subject to change without notice. 9 120.5-IM (0217)

Unique Solutions for All-Indoor HVAC Projects VertiCool Classic Vertical, 3 - 30 Ton VertiCool Aurora Vertical, 3 - 35 Tons Portable Cooling and Heating Units 3-30 Tons C13-Series Horizontal 2 - 10 Tons VariCool VAV, 9 - 70 Tons VariCool EZ-Fit VAV, 12 - 90 Tons C-Series Horizontal 1 - 15 Tons OmegaAir Vertical 100% Outside Air, 1 - 15 Tons OmegaAir Horizontal, 100% Outside Air, 1 - 15 Tons Special Configuration Engineered to Order LIMITED WARRANTY Authorized Distributor: United CoolAir Units are backed by a 1 year limited warranty on parts and a 5 year limited warranty on the compressor (labor not included). Maintenance items such as filters and belts are excluded under this limited warranty. FACTORY TESTED All units are functionally run tested before shipment to ensure a trouble-free start-up and unit commissioning. Industry proven components are used throughout to enhance system reliability and peace of mind. Scan to learn more about all of our products! 491 East Princess Street, York, PA 17403 Phone: 717-843-4311 Fax: 717-854-4462 email: uca@unitedcoolair.com web: www.unitedcoolair.com Copyright by United CoolAir Corporation 2015. All rights reserved. Manufacturer reserves the right to make changes without notice. 120.5-IM (0217)

Marvel BMS Subject to change without notice 3 120 5-IM (0217) General Purpose The Marvel BMS communications availability is designed to give a general control and monitoring ability to any of the Marvel controllers It is not designed to control the actual individual components of the units The Marvel controls

Related Documents:

ASSOLUTA ELEGANZA. 01 Marvel Royal Calacatta 50x110 cm Marvel Royal Calacatta Polished/Lappato 75x150 cm Marvel Red Luxury Polished/Lappato 75x150 cm Marvel Gold Hex Gris-Calacatta 25,1x29 cm Marvel Royal Calacatta Corner 50 1,4x50 cm 02 Marvel Royal Calacatta 50x110 cm Marvel Red Lu

S. MPC. BMS 1&2 BMS 3&4 BMS 5 Pno. I ff was cheat ed-by you since I don't know when, 16 S. MPC. BMS 1&2 BMS 3&4 BMS 5 Pno. so I made up my mind it must come to an end,File Size: 423KBPage Count: 34

conjunction with the BMS when the Orion BMS or Orion Jr. BMS are used with parallel strings. Electrical engineering is required to use the Orion BMS or. Orion Jr. BMS with parallel strings, and this work must be performed by an electrical engineer who is trained in working with and understands the risks of paralleled lithium ion batteries.

The UBC Design Guidelines may be used by BMS Designers for guidance in the design of UBC BMS installations but shall not be reproduced, in whole, or part, for inclusion in BMS Design Specifications, or Tender or Contract Documents. The UBC BMS Design Guidelines are not Design Specifications and do not include sufficient detail to be used as s uch.

The individual cell-balancing units are controlled by the central Master RT-BMS Control Unit. New in version 4.0: we offer two basic models: 1) RT-BMS main unit with one data line for managing up to 64 cells. 2) RT-BMS main unit with three data lines for managing up to 192 cells. Real Time Battery Management System (RT-BMS) operating block diagram

BMS, a control stage and the system load [3]. Fig. 1. Full system would be located the BMS When any cell voltage reaches the maximum load, the BMS should be disconnected from the charger (Fig. 2). The BMS must also balance the cells to maximize their capacity. The system can make the balancing by disabling the load of the

Oct 05 2015 BMS 3.1 Issue 1.5 Eric Kauz GDSN Dec ECL See summary of changes section Jun 01 2016 BMS 3.1 Issue 1.6 Eric Kauz 3.1.2 See summary of changes section. Jan 03 2020 BMS 3.1 Issue 1.7 Radhika Chauhan Release 3.1.12 See Summary of Changes Section Jan 28 2020 BMS 3.1 Issue 1.8 Radhika Chauhan Release 3.1.13 See Summary of

PTC Confidential and Proprietary 2 2 The JS code can be added by selecting the Home.js menu under Home menu in the navigation pane. Resources: –http .