TABLE OF CONTENTS PROJECT-DEVELOPMENT OF CGD NETWORK IN THE GA OF AHMEDNAGAR -AURANGABAD & SATARA SANGLI DIST – MAHARASHTRA STATE (PIG LAUNCHER / RECEIVER) Description S.No. II Document/ Drawing No. TECHNICAL P.013751 D11071 101 Rev. No. Pages Page No. VOLUME II OF II Material Requisition P.013751 D11071 101 1 12 1 DATA SHEET Pig Launcher Size 28"x24" P.013751 D 11087 006 0 2 13 3 DATA SHEET Pig Receiver Size 28"x24" P.013751 D 11087 007 0 2 15 4 DATA SHEET Pig Launcher Size 20"x16" P.013751 D 11087 008 1 2 17 5 DATA SHEET Pig Receiver Size 20"x16" P.013751 D 11087 009 1 2 19 6 DATA SHEET Pig Launcher Size 22"x18" P.013751 D 11087 013 0 2 21 7 DATA SHEET Pig Receiver Size 22"x18" P.013751 D 11087 014 0 2 23 8 DATA SHEET Quick Opening End Closure for Pig Launcher/Receiver P.013751 D 11087 010 1 2 25 9 DATA SHEET Non Intrusive type PIG Signaller P.013751 D 11087 011 0 2 27 10 DATA SHEET Pressure Safety Valve P.013751 D 11087 012 0 1 29 11 PTS Pig Launcher/Receiver P.013751 D11077 054 1 10 30 12 PTS Fittings & Flanges P.013751 D11077 055 0 22 40 13 PTS Painting System and Colour Code for Final Layer P.013751 D11077 056 0 3 62 14 PMS Piping Specifications - Piping Classes (3C1) P.013751 D11077 057 0 7 65 15 QCT Pig Launcher / Receiver P.013751 D11013 029 1 1 72 16 QCT Fittings P.013751 D11013 030 0 3 73 17 QCT Flanges P.013751 D11013 031 0 3 76 1 MR 2 Rev. 1 City Gas Distribution Project Page 1 of 1

MATERIAL REQUISITION FOR PIG LAUNCHER/RECEIVER P.013751 D11071 101 BHARAT GAS RESOURCES LIMITED (BGRL) DEVELOPMENT OF CGD NETWORK IN THE GA OF AHMEDNAGAR –AURANGABAD& SATARA -SANGLI DIST – MAHARASHTRA STATE MATERIAL REQUISITION FOR PIG LAUNCHER / RECEIVER 1 12.03.2020 Issued for Tender VA RP GS 0 7.01.2020 Issued for Tender VA RP GS Rev. Date Subject of revision Prepared By Checked By Approved By

MATERIAL REQUISITION FOR PIG LAUNCHER/RECEIVER P.013751 D11071 101 TABLE OF CONTENTS 1. INTRODUCTION . 3 2. DEFINITIONS . 3 3. DESCRIPTION OF GOODS ADD/OR SERVICES . 4 Rev. 1 City Gas Distribution Project. Page 2 of 12

MATERIAL REQUISITION FOR PIG LAUNCHER/RECEIVER 1. P.013751 D11071 101 INTRODUCTION Bharat Gas Resources Limited (BGRL)is planning to lay a 250.00 kms (approx.) Natural Gas Pipeline, with Dispatch Station (DT) near Shrigonda, Intermediate Pigging station at Ahmednagar, Receiving station at Aurangabad & kopargaon . BGRL is also executing project of laying a 160 kms (approx.) Natural Gas Pipeline, with Dispatch Station (DT) at CGS near Village Mouje Vadgaon, District Kolhapur and Intermediate Pigging station near Waghwadi in Sangli District at , Receiving station at Sangli and Satara in Maharashtra State. These proposed pipelines are hereinafter referred to as Limpangaon Ahmednagar Aurangabad Kopargaon ( LAAKPL) Pipeline Project and Mouje Vadgaon-Waghwadi-Sangli/Satara ( VWSS) Pipeline Project respectively. The Pipeline Size has been finalized for piggable section as below i.e.: i. ii. iii. iv. 24” NB for Limpangaon to Ahmednaagr section & Ahmednagar to Aurangabad section 16” NB for Ahmednaagr to Kopargaon section 18” NB for Mouje Vadgaon to Waghwadi section 16” NB for Waghwadi to Sangli section and Waghwadi to Satara section TE-India is now inviting tenders for procurement of Pig Launcher/Receiver for this project. The present document covers the technical specifications for this procurement enquiry. It forms an integral part and is to be read in conjunction with ‘Volume I of II: Commercial 2. DEFINITIONS Rev. 1 Client Shall mean Bharat Gas Resources Ltd; Engineer/Owner’s Representative Designate the individual or legal entity to which the Owner has entrusted various tasks in relations with the carrying-out of his project. This also includes PMC (Project Management Consultant) of the Project; Manufacturer Manufacturer of the Pig Launcher & Pig Receiver as well as its sub-contractor(s). Third Party Inspection Agency (TPIA) Means the Inspection Agency to be appointed by Client / Client Approved TPIA. Control Authority Client / Client’s Representative or Client’s Approved TPIA. City Gas Distribution Project. Page 3 of 12

MATERIAL REQUISITION FOR PIG LAUNCHER/RECEIVER 3. P.013751 D11071 101 DESCRIPTION OF GOODS ADD/OR SERVICES A. DESCRIPTION OF GOODS AND/OR SERVICES FOR PIG LAUNCHER & RECEIVER PART A: PIG LAUNCHER/RECEIVER FOR LIMPANGAON AHMEDNAGAR AURANGABAD KOPARGAON ( LAAKPL) PIPELINE PROJECT AT AHMEDNAGAR & AURANGABAD GA Rev. 1 Item Sr. No. Description 1. Pig Launcher of size 28” x 24” (along with internal tray, pig handling device, Jib Crane Assembly (capacity 2 ton) *, Quick Opening Closure including all applicable accessories as specified in datasheet & specification) Total Qty / Unit Remarks 2 Limpaongaon to Ahmednagar section & Ahmednaagr to Aurangabad Section 2 Pig Receiver of size 28” x 24” (along with internal tray, pig handling device, Jib Crane Assembly (capacity 2 ton) *, Quick Opening Closure including all applicable accessories as specified in datasheet & specification) 2 Limpaongaon to Ahmednagar section & Ahmednaagr to Aurangabad Section 3 Pig Launcher of size 20” x 16” (along with internal tray, pig handling device, Jib Crane Assembly (capacity 1 ton) *, Quick Opening Closure including all applicable accessories as specified in datasheet & specification) 1 Ahmednaagr to Kopergaon Section 4 Pig Receiver of size 20” x 16” (along with internal tray, pig handling device, Jib Crane Assembly (capacity 1 ton) *, Quick Opening Closure including all applicable accessories as specified in datasheet & specification) 1 Ahmednaagr to Kopergaon Section 5 Pig Signaller (Non-intrusive type) complying to tender datasheet and specification. 18 6 One number of Pressure safety valve including upstream piping with isolation Lock Open ball valve (connected to Pig Launcher / Receiver) & downstream piping ** (Blow Down/vent to Atmosphere along with flapper) complying to tender data sheet and specification. 6 7 ‘O’ Ring Gasket for size 28” x 24” Pig Trap (Launcher & Receiver) complying to tender data sheet and specifications. 12 8 ‘O’ Ring Gasket for size 20” x 16” Pig Trap (Launcher & Receiver) complying to tender data sheet and specifications. 6 City Gas Distribution Project. Page 4 of 12

MATERIAL REQUISITION FOR PIG LAUNCHER/RECEIVER P.013751 D11071 101 PART B: PIG LAUNCHER/RECEIVER FOR MOUJE VADGAON WAGHWADI SATARA SANGHLI ( MWSSPL) PIPELINE PROJECT AT SATARA & SANGHLI GA Item Sr. No. Description Total Qty / Unit 1. Pig Launcher of size 22” x 18” (along with internal tray, pig handling device, Jib Crane Assembly (capacity 2 ton) *, Quick Opening Closure including all applicable accessories as specified in datasheet & specification) 1 Mouje Vadgaon to Waghwadi Section 2 Pig Receiver of size 22” x 18” (along with internal tray, pig handling device, Jib Crane Assembly (capacity 2 ton) *, Quick Opening Closure including all applicable accessories as specified in datasheet & specification) 1 Mouje Vadgaon to Waghwadi Section 3 Pig Launcher of size 20” x 16” (along with internal tray, pig handling device, Jib Crane Assembly (capacity 1 ton) *, Quick Opening Closure including all applicable accessories as specified in datasheet & specification) 2 Waghwadi to Sangli Section & Waghwadi to Satara Section 4 Pig Receiver of size 20” x 16” (along with internal tray, pig handling device, Jib Crane Assembly (capacity 1 ton) *, Quick Opening Closure including all applicable accessories as specified in datasheet & specification) 2 Waghwadi to Sangli Section & Waghwadi to Satara Section 5 Pig Signaller (Non-intrusive type) complying to tender datasheet and specification. 18 6 One number of Pressure safety valve including upstream piping with Lock Open isolation ball valve (connected to Pig Launcher / Receiver) & downstream piping ** (Blow Down/vent to Atmosphere along with flapper) complying to tender data sheet and specification. 6 7 ‘O’ Ring Gasket for size 22” x 18” Pig Trap (Launcher & Receiver) complying to tender data sheet and specifications. 6 8 ‘O’ Ring Gasket for size 20” x 16” Pig Trap (Launcher & Receiver) complying to tender data sheet and specifications. 12 Remarks * Jib crane capacity (Ton) and reach shall be proposed by vendor and to be located at best suitable location. Proposed capacity to be approved by Client/Consultant. ** Downstream Piping (Blow Down/ Vent) including Flange, Fittings etc. shall be of LTCS material (i.e. -20 Degree C) Rev. 1 City Gas Distribution Project. Page 5 of 12

MATERIAL REQUISITION FOR PIG LAUNCHER/RECEIVER A. 1. P.013751 D11071 101 REMARKS / COMMENTS GENERAL NOTES VENDOR's compliance Vendor must include the following statement in his bid: We certify that our bid is fully complying with your enquiry dated , and referenced . Compliance with this material requisition in any instance shall not relieve the Vendor of his responsibility to meet the specified performance. 2. COMPLIANCE WITH SPECIFICATION The VENDOR shall be completely responsible for the design, materials, fabrication, testing, inspection, preparation for shipment and transport of the above equipment strictly in accordance with the Material Requisition and all attachments there to. 3. VENDOR'S SCOPE Vendor’s scope of work includes Design, supply, testing, inspection, packing & forwarding and transportation of Flow Tee. 4. INSPECTION Inspection shall be performed by Third party inspection agency (TPIA) appointed by vendor from recommended TPIA or its authorized representative. Inspection shall be carried out only after drawing & documents are approved by Owner’s Engineer, as set out and specified in the codes and documents forming this Material Requisition. In addition to stamping, the specifications & manufactures symbols as specified in ASME material specifications. 5. INSPECTION AND TEST PLAN Vendor shall appoint a TPIA for inspection purpose and issuance of 3.2 certificates in a manner described below: The successful vendor shall propose minimum two (02) Nos. of TPIA‘s from the below list within (02) weeks from the date of FOA for Purchaser / Purchaser’s consultant approval. Vendor shall appoint approved TPIA for inspection purpose.” a) Lloyd Register of Industrial Services b) TUV – NORD c) DNV GL d) Bureau Veritas e) SGS f) American Bureau services g) APPLUS VELOSI h) Certification Engineers international Limited (CEIL) Apart from inspection by TPIA, inspection shall also be performed by Purchaser / Purchaser’s consultant Representative, as set out and specified in the codes and particular documents forming this MR. Rev. 1 City Gas Distribution Project. Page 6 of 12

MATERIAL REQUISITION FOR PIG LAUNCHER/RECEIVER 6. P.013751 D11071 101 APPLICABLE DOCUMENTS General prescriptions, requirements and information are listed in annex C of this Material Requisition. 7. VENDOR'S DOCUMENTS Vendor shall submit the documents as listed under point B of this Material Requisition. All documents shall be submitted in English language only. Vendor shall ensure that following information are properly entered in each drawing/document Rev. 1 Tender Number No. of Equipment /Package Name of Project Owner Vendor Name Drawing/Document Title Drawing/Document No. Drawing/Document Rev. No. & Date Transmittal No. & Date. City Gas Distribution Project. Page 7 of 12

MATERIAL REQUISITION FOR PIG LAUNCHER/RECEIVER P.013751 D11071 101 LIST OF ATTACHMENTS B. The table here below lists the documents which are integral part of Material Requisition revision this Material Requisition. The applicable revision index of each document is mentioned in the column below the current Material 0 Requisition revision index. Documents Revision of documents Data Sheet - Pig Launcher Size 28"x24" Doc No: P.013751 D 11087 006 0 Data Sheet - Pig Receiver Size 28"x24" Doc No: P.013751 D 11087 007 0 Data Sheet - Pig Launcher Size 20"x16" Doc No: P.013751 D 11087 008 1 Data sheet – Pig Receiver Size 20"x16 Doc No: P.013751 D 11087 009 1 Data Sheet - Pig Launcher Size 22"x18" Doc No: P.013751 D 11087 013 0 Data sheet – Pig Receiver Size 22"x18” Doc No: P.013751 D 11087 014 0 Data sheet – QOEC for Launcher Receiver Doc No: P.013751 D 11087 010 1 Data sheet – Non intrusive type Pig Signaller Doc No: P.013751 D 11087 011 0 Data sheet – Pressure safety valve Doc No: P.013751 D 11087 012 0 Particular Technical Specification - Pig Launcher Doc. No: P.013751 D 11077 054 1 Particular Technical Specification - Fitting & Flange Doc No P.013751 D 11077 055 0 Particular Technical Specification - Painting Doc No : P.013751 D 11077 056 0 QCT – Pig Launcher / Receiver Doc No: P.013751 D 11013 029 0 QCT – Fitting Doc No: P.013751 D 11013 030 0 QCT – Flange Doc No: P.013751 D 11013 031 0 PMS - Piping Specifications - Piping Classes (3C1) Doc No: P.013751 D 11077 057 0 Rev. 1 City Gas Distribution Project. Page 8 of 12

P.013751 D11071 101 MATERIAL REQUISITION FOR PIG LAUNCHER/RECEIVER C. DOCUMENTS & DATA REQUIREMENTS The table hereunder specifies the quantities and the nature of the documents to be submitted by the CONTRACTOR/ VENDOR to the ENGINEER. The documents required at the inquiry stage and to be included in the bid are listed under column A. The documents required after award of the AGREEMENT and subject to the written approval of the ENGINEER are listed under column B. The final and certified documents are listed under column C. Any document, even when preliminary, shall be binding and therefore duly identified and signed by the CONTRACTOR. It shall bear the ENGINEER's Project reference, the Material Requisition number and the identification number. THE DOCUMENTS ARE FULLY PART OF THE SUPPLY WHICH SHALL BE COMPLETE ONLY IF AND WHEN THE DOCUMENTS COMPLYING FULLY WITH THE MATERIAL REQUISITION REQUIREMENTS ARE RECEIVED BY THE ENGINEER. Item 1 Documents and Data ISO Certification latest Document Index No. CDS A Number of copies B Number of copies 1 6 C Required date 2 weeks Number of copies Required date 6 2 weeks before despatch with final techn. file 2 Completed data sheet for pig launcher/receiver CDS 1 6 2 weeks 6 2 weeks before despatch with final techn. file 3 Recommended arrangement of Pig Launcher/Receiver along with internal tray, pig handling device, jib crane assembly showing direction of opening of Quick Opening Closure for each plot along with details RAP 1 6 2 weeks 6 2 weeks 4 Drawing/data submittal list/schedule DLS - 6 2 weeks monthly 6 2 weeks 5 Fabrication, test and delivery schedule (per item) FTD - 6 2 weeks monthly 6 2 weeks 6 Progress report PRT - 6 2 weeks monthly 6 2 weeks 7 Catalogues / References CRS 1 - - 3 With final techn. file Rev. 1 City Gas Distribution Project. Page 9 of 12

P.013751 D11071 101 MATERIAL REQUISITION FOR PIG LAUNCHER/RECEIVER Item 8 9 10 11 12 Documents and Data Outline drawing material specification unit weight Packing/shipping list with weights and dimensions C Number of copies Number of copies - 6 2Weeks Required date Number of copies Required date 6 With final techn. file 6 2 weeks before despatch with final techn. file PLD - 6 2 weeks before shipping DMU - 6 2 weeks 6 2 weeks before despatch with final techn. file CCC - 6 2 weeks 6 2 weeks before despatch with final techn. file BOM - 6 2 weeks 6 2 weeks before despatch with final techn. file RSE - 6 2 weeks 6 2 weeks before despatch with final techn. file RSO - 6 2 weeks 6 2 weeks before despatch with final techn. file WPS - 6 2 weeks 6 2 weeks before despatch with final techn. file QAP - 6 2 weeks 6 2 weeks before despatch with final techn. file Bill of materials (on drawings) 14 Recommended spare parts list (for 2 years operation) ( Not applicable) Rev. 1 B Code compliance certificate Recommended spare parts list (for erection and commissioning) 16 OMS A Detail drawing material specification unit weight calculations Welding details 13 15 Document Index No. Welding procedure specification and records WPS/PQR QA/QC program* City Gas Distribution Project. Page 10 of 12

P.013751 D11071 101 MATERIAL REQUISITION FOR PIG LAUNCHER/RECEIVER Item 17 18 19 20 21 22 23 24 25 Rev. 1 Documents and Data Document Index No. A B C Number of copies Number of copies ITP - 6 2 weeks 6 2 weeks before despatch with final techn. file LOF - 6 2 weeks 6 List of fabrication and control operations (LOFC) 2 weeks before despatch with final techn. file Test reports 6 2 weeks before despatch with final techn. file 6 2 weeks before despatch with final techn. file 6 2 weeks before despatch with final techn. file 6 2 weeks before despatch with final techn. file 6 2 weeks before despatch with final techn. file 6 2 weeks before despatch with final techn. file 6 2 weeks before despatch with final techn. file Required date Number of copies Inspection and test procedures NDE reports Heat treatment reports Hydro test and air test report Maintenance and operating manuals Installation instructions Site inspection procedure Material certificate TRS NDR HTT HTR MOM ITS MCT - - - - - - - City Gas Distribution Project. 6 6 6 1 week after test 1 week after test 1 week after test 6 1 week after test 6 2 weeks before shipping 6 2 weeks before shipping 6 1 week after test Required date Page 11 of 12

P.013751 D11071 101 MATERIAL REQUISITION FOR PIG LAUNCHER/RECEIVER Item 26 Documents and Data Painting system description List of subcontractors with their scope 27 28 Instrument data sheets Document Index No. PSD LSS IDS WDG A Number of copies B Number of copies - - - - 6 6 6 6 C Required date 2 weeks 2 weeks 2 weeks 2 weeks Number of copies Required date 6 2 weeks before despatch with final techn. file 6 2 weeks before despatch with final techn. file 6 2 weeks before despatch with final techn. file 6 2 weeks before despatch with final techn. file 29 Wiring diagrams 30 CENELEC certificates for electrical instruments in hazardous locations CCE - 6 2 weeks 6 2 weeks before despatch with final techn. file 31 Final technical file, preliminary copy for approval (In Soft & Hard copy) FTP - 3 2 weeks before shipping - - 32 Final technical file (In Soft & Hard copy) FTF - - - 6 Before shipping * QA/QC Program shall comprise of In-House testing facilities, Resources and Quality Procedure being followed by the vendor to ensure Quality of Product in line with tender requirement. Rev. 1 City Gas Distribution Project. Page 12 of 12

DATA SHEET NO. P.013751 D 11087 006 DATA SHEET FOR PIG LAUNCHER (28" x 24") Page 1 of 2 1 FOR : BHARAT GAS RESOURCES LIMITED 2 PROJECT SITE : LIMPANGAON AHMEDNAGR AURANGABAD KOPARGAON ( LAAKPL) PIPELINE PROJECT AT SIZE : AHMEDNAGAR AURANGABAD GA 28"x 24" 3 TYPE : HORIZONTAL 2 Nos UNIT : NO. REQUIRED : 4 APPLICABLE SPECIFICATION : Y-0501 & Y-1002 (PIG LAUNCHER ) 5 TAG NOS. OPERATING DESIGN CONDITIONS 6 CODE : * MANUFACTURER : WEIGHTS ASME B 31.8 / ASME SEC. VIII Div 1 7 WIND VELOCITY : - 8 EARTHQUAKE - ZONE 47 Zone IV DESIGN FACTOR : 0.4 EMPTY m/s TOTAL OPERATING : * FULL OF WATER (SITE TEST) : * INTERNALS : * (To be finalized during detail engineering) (To be finalized during detail engineering) (SHIPPING - INSULATION/ ERECTION) : FIRE PROOFING : ACCESSORIES : * NA * (SEE SR. NO.: 50) CAPACITIES 9 MATERIAL CERTIFICATE : 10 INSPECTION BY : NOMINAL : * m3 EN 10204 3.2 EFFECTIVE : * m3 AUTHORISED INSPECTION AGENCY FULL : * m3 SHELL DESIGN DATA 16 OPER. TEMP. : Min.- Max. C 17 DESIGN TEMP. : Min.- Max. C 18 OPER. PRESSURE : Min.- Max. barg 19 DESIGN PRESSURE : Min.- Max. barg 0 65 1.5 Times Design Pressure barg 21 PNEUMATIC TEST PRESSURE : barg 22 CORROSION ALLOWANCE CA : mm 3.0 23 MIN. THK (CA INCLUDED) OF CONNECTING PIPE mm As per PMS 25 LINING : mm NA NATURAL GAS PHASE 27 FILLING : 28 SPECIFIC GRAVITY : N.A. 49 - 20 HYDROSTATIC TEST PRESSURE : 26 FLUID NATURE/ JACKET % kg/m3 29 FABRICATION - TESTING DATA 1 30 SHELL / HEAD JOINT EFFICIENCY 31 SHELL / HEAD ALLOWABLE STRESS EFFICIENCY 32 SHELL / HEAD X-RAY SHELL / HEAD ADDITIONAL TESTS (Impact Test) 100 % 33 For CS : At 0 C Minimum Average Absorbed Energy shall be SMYS (Mpa)/10, with a minimum of 27 J, for the transerve direction. At 0 C Minimum Individual Energy value shall not be less than 80 % of the Minimum required average value, for the transerve direction. For LTCS : at -20 0C Energy Absorbed Min. 28J & Avg. 35J and at temperature specified in Material Spec. 34 HEAT TREATMENT : PWHT/ AS PER ASME SECTION VIII DIV. I SPECIAL 35 HEAD SHAPE 36 QUICK OPENING CLOSURE BAND LOCK TYPE 'O' ring with ASME U stamp (NOTE 8) MATERIAL CS (PIPING CLASS 3C1) SPECIFIED 37 LARGER BARREL 38 ECENTRIC REDUCER (BOTTOM FLAT) 39 SMALLER BARREL 40 41 42 43 PROPOSED API 5L X60 PSL2 AS PER QOEC Data Sheet VESSEL FLANGE (FORGED ) NOZZLE NECK (PIPE ) NOZZLE FLANGE (FORGED) ASTM A694 F60 ASTM A106 GR.B or equv. With Charpy Impact Test ASTM A105 SPIRAL WOUND AISI 304, Filling Pure Graphite, Centering Ring CS 44 EXT. GASKET 45 EXT. BOLTS ASTM A 193 B 7 46 EXT. NUTS ASTM A194 GR 2H 47 EXT. ATTACHMENT LUGS 48 SUPPORT : 49 SPECIFIED MSS- SP-75 Gr WPHY 60 HEADS E X T E R N A L PROPOSED API 5L X60 PSL2 SADDLES / SKIRT/RING / LEG / BRACKET SHOP PAINTING - IS 2062 GR.A OR EQ. SANDBLASTING PRIMER FINISH COAT , TOTAL DRY FILM THICKNESS 320 µ MINIMUM as per Painting spec. P.013751 D 11077 056 COATING Pig launcher shall be provided with suitable handling system for retraction, insertion & launching of pigs including instrumented pigs (such as basket / tray; retracting rod/ mechanism etc.) from it. Jib crane also required. The Pig launcher shall be equipped with a half internal removable filtering basket consisting of a punched plate with at least five rows of drain holes. The filtering basket shall slide on guides/rails or wheels and in all cases the material of the parts being in contact with each other shall be of anti-spark type. The filtering basket shall be provided with suitable stops. Lock bracket shall be provided to such that the basket does not slide within the trap. Rear end of the basket shall be provided with suitable lug to enable retrieval of the basket by hooks. The handling system (for inserting and retracting the pigs from the Pig launcher ) shall be complete with handling devices. In case any rails are required for sliding of the handling system, the same shall be provided by the Pig launcher manufacturer. ACCESSORIES 50 DATE 07.01.2020 REV PREPARED CHECKED APPROVED DESCRIPTION 0 VA RP GSS Issued for Procurement CITY GAS DISTRIBUTION PROJECT

DATA SHEET No P.013751 D 11087 006 DATA SHEET FOR PIG LAUNCHER (28" x 24") Page 2 of 2 NOZZLE SCHEDULE 1 ITEM Nos NOZZLE NECK 2 STANDOUT FLANGE DIA SCH RATING FACING TYPE SERVICE REMARKS 3 N1 1 24" By Vendor 300 # RF WN * Connection to 24" main pipeline B16.5 4 N2 & N6 2 2" 160 300 # RF WN * Vent Connection B16.5 5 N4 1 2" 160 300 # RF WN * Pressure Indicator B16.5 6 N5 1 2" 160 300 # RF WN * PSV Connection B16.5 7 N8 1 8" 40 300 # RF WN * Kicker connection B16.5 8 N7 1 28" To match I.D. of major barrel 300 # Note 8 Note 8 * Quick-opening closure 9 N9 1 4" 80 300 # RF WN * Drain Connection B16.5 10 N10 1 2" 160 300 # RF WN * Utility Connection B16.5 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 FIELD INSTALLATION LAYOUT 44 45 Note - All Dimensions are tentative and in mm only. Vendor to indicate final dimensions in drawings submitted for approval. 46 47 NOTES : 48 1. All nozzles reinforcements & clips to be same material quality as shell plate/Pipe. 49 2. The dimensions indicated above are suggested dimensions only. The Vendor/ Manufacturer shall check and provide dimensions suitable for accommodating latest online inspection tool (longest). Final dimensions shall be approved by Owner/Consultant. 50 3. Nozzles standouts are from T.L. or C.L. of vessels to flange gasket seating face. 51 4. Nozzle positions are from reference lines unless otherwise stated. 52 5. Nozzle orientation will be Finalised during detail engineering. 53 6. Bolt holes to straddle centre lines except as noted. 54 7. Thicknesses must be checked by Vendor at bidding time. 55 8. ASME U Stamp applicable only for Quick opening closure only. Quick-opening closure shall include a safety device to prevent opening before depressurizing in compliance with ASME section VIII, Div, UG. 35 (b). 56 9. Bore of Flange (N1) shall match with the bore of Connecting Pipeline. 57 10. If the minor barrel is fabricated from plates, dimensional tolerance of the barrel shall be same as pipes manufactured as per API 5L, Latest Edition. 58 11. This data sheet shall be read in conjunction with Specification for Pig Launcher and PMS. 59 12. * Vendor to indicate 60 13. All the permissible forces on nozzles to be furnished by vendor. 61 14. Foundation details of Pig launcher / Receiver to be furnished by vendor. 62 15. In the barrel, Slope is required 1: 100 towards the pipeline. DATE REV PREPARED CHECKED APPROVED DESCRIPTION 07.01.2020 0 VA RP GSS Issued for Procurement CITY GAS DISTRIBUTION PROJECT

DATA SHEET NO. P.013751 D 11087 007 DATA SHEET FOR PIG RECEIVER (28" x 24") Page 1 of 2 1 FOR : BHARAT GAS RESOURCES LIMITED 2 PROJECT SITE : LIMPANGAON AHMEDNAGR AURANGABAD KOPARGAON ( LAAKPL) PIPELINE PROJECT AT SIZE : AHMEDNAGAR AURANGABAD GA 28"x 24" 3 TYPE : HORIZONTAL 2 Nos UNIT : NO. REQUIRED : 4 APPLICABLE SPECIFICATION : Y-1001 & Y-1401 (PIG RECEIVER ) 5 TAG NOS. OPERATING DESIGN CONDITIONS 6 CODE : * MANUFACTURER : WEIGHTS ASME B 31.8 / ASME SEC. VIII Div 1 7 WIND VELOCITY : - 8 EARTHQUAKE - ZONE 47 Zone IV DESIGN FACTOR : 0.4 EMPTY m/s TOTAL OPERATING : * FULL OF WATER (SITE TEST) : * INTERNALS : * (To be finalized during detail engineering) (To be finalized during detail engineering) (SHIPPING - INSULATION/ ERECTION) : FIRE PROOFING : ACCESSORIES : * NA * (SEE SR. NO.: 50) CAPACITIES 9 MATERIAL CERTIFICATE : 10 INSPECTION BY : NOMINAL : * m3 EN 10204 3.2 EFFECTIVE : * m3 AUTHORISED INSPECTION AGENCY FULL : * m3 SHELL DESIGN DATA 16 OPER. TEMP. : Min.- Max. C 17 DESIGN TEMP. : Min.- Max. C 18 OPER. PRESSURE : Min.- Max. barg 19 DESIGN PRESSURE : Min.- Max. barg 0 65 1.5 Times Design Pressure barg 21 PNEUMATIC TEST PRESSURE : barg 22 CORROSION ALLOWANCE CA : mm 3.0 23 MIN. THK (CA INCLUDED) OF CONNECTING PIPE mm As per PMS 25 LINING : mm NA NATURAL GAS PHASE 27 FILLING : 28 SPECIFIC GRAVITY : N.A. 49 - 20 HYDROSTATIC TEST PRESSURE : 26 FLUID NATURE/ JACKET % kg/m3 29 FABRICATION - TESTING DATA 1 30 SHELL / HEAD JOINT EFFICIENCY 31 SHELL / HEAD ALLOWABLE STRESS EFFICIENCY 32 SHELL / HEAD X-RAY 100 % 33 SHELL / HEAD For CS : At 0 C Minimum Average Absorbed Energy shall be SMYS (Mpa)/10, with a minimum of 27 J, for the transerve direction. At 0 C Minimum Individual Energy value shall not be less than 80 % of the Minimum required average value, for the transerve direction. ADDITIONAL TESTS (Impact Test) 0 For LTCS : at -20 C Energy Absorbed Min. 28J & Avg. 35J and at temperature specified in Material Spec. 34 HEAT TREATMENT : PWHT/ AS PER ASME SECTION VIII DIV. I SPECIAL 35 HEAD SHAPE 36 QUICK OPENING CLOSURE BAND LOCK TYPE 'O' ring with ASME U stamp (NOTE 8) MATERIAL CS (PIPING CLASS 3 C1) 37 LARGER BARREL 38 CONCENTRIC REDUCER 39 SMALLER BARREL 40 HEADS 41 42 43 E X T E R N A L SPECIFIED PROPOSED SPECIFIED PROPOSED API 5L X60 PSL2 MSS- SP-75 Gr WPHY 60 API 5L X60 PSL2 AS PER QOEC Data Sheet VESSEL FLANGE (FORGED ) NOZZLE NECK (PIPE ) NOZZLE FLANGE (FORGED) ASTM A694 F60 ASTM A106 GR.B or equv. With Charpy Impact Test ASTM A105 SPIRAL WOUND AISI 304, Filling Pure Graphite, Centering Ring CS 44 EXT. GASKET 45 EXT. BOLTS ASTM A 193 B 7 46 EXT. NUTS ASTM A194 GR 2H 47 EXT. ATTACHMENT LUGS 48 SUPPORT : 49 SHOP PAINTING SADDLES / SKIRT/RING / LEG / BRACKET - IS 2062 GR.A OR EQ. SANDBLASTING PRIMER FINISH COAT , TOTAL DRY FILM THICKNESS 320 µ MINIMUM as per Painting spec. P.013751 D 11077 056 COATING Pig launcher shall be provided with suitable handling system for retraction, insertion & launching of pigs including instrumented pigs (such as basket / tray; retracting rod/ mechanism etc.) from it. Jib crane also required. The Pig launcher shall be equipped with a half internal removable filtering basket consisting of a punched plate with at least five rows of drain holes. The filtering basket shall slide on guides/rails or wheels and in all cases the material of the parts being in contact with each other shall be of anti-spark type. The filtering basket shall be provided with suitable stops. Lock bracket shall be provided to such that the basket does not slide within the trap. Rear end of the basket shall be provided with suitable lug to enable retrieval of the basket by hooks. The handling system (for inserting and retracting the pigs from the Pig launcher ) shall be complete with handling devices. In case any rails are required for sliding of the handling system, the same shall be provided by the Pig launcher manufacturer. ACCESSORIES 50 DATE REV PREPARED CHECKED APPROVED DESCRIPTION 07.01.2020 0 VA RP GSS Issued for Procurement CITY GAS DISTRIBUTION PROJECT

DATA SHEET No P.013751 D 11087 007 DATA SHEET FOR PIG RECEIVER (28" x 24") Page 2 of 2 NOZZLE SCHEDULE 1 ITEM Nos NOZZLE NECK 2 STANDOUT FLANGE DIA SCH RATING FACING TYPE SERVICE REMARKS 3 N1 1 24" By Vendor 300 # RF WN * Connection to 24" main pipeline B16.5 4 N2 & N6 2 2" 160 300 # RF WN * Vent Connection B16.5 5 N4 1 2" 160 300 # RF WN * Pressure Indicator B16.5 6 N5 1 2" 160 300 # RF WN * PSV Connection B16.5 7 N8 1 8" 40 300 # RF WN * Kicker connection B16.5 8 N7 1 28" To match I.D. of major barrel 300 # Note 8 Note 8 * Quick-opening closure 9 N9 1 4" 80 300 # RF WN * Drain Connection B16.5 10 N10 1 2" 160 300 # RF WN * Utility Connection B16.5 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 3

s.no. document/ drawing no. rev. no. pages page no. ii volume ii of ii 1 mr p.013751 d11071 101 1 12 1 2 data sheet p.013751 d 11087 006 0 2 13 3 data sheet p.013751 d 11087 007 0 2 15 4 data sheet p.013751 d 11087 008 1 2 17 5 data sheet p.013751 d 11087 009 1 2 19 6 data sheet p.013751 d 11087 013 0 2 21 7 data sheet p.013751 d 11087 014 0 2 23 8 data sheet p.013751 d 11087 010 1 2 25

Related Documents:

Creating a table of contents The Insert Index/Table window (Figure 1) has five tabs. All of them can be used when creating a table of contents: Use the Index/Table tab to set the attributes of the table of contents. Use the Entries and Styles tabs to format the entries in the table of contents. Use the Background tab to add color or a graphic to the background of the table of

Creating a table of contents The Insert/Index Table window has five tabs. Four of them are used when creating a table of contents: Use the Index/Table tab to set the table's attributes. Use the Entries and Styles tabs to format the table entries. Use the Background tab to add color or a graphic to the table background. The next four sections of this chapter tell you how to use each . /p div class "b_factrow b_twofr" div class "b_vlist2col" ul li div strong File Size: /strong 554KB /div /li /ul ul li div strong Page Count: /strong 15 /div /li /ul /div /div /div

3) Legazpi Airport Development Project 4) Selected Airports Development Project (Tacloban and Bacolod (Silay)) 5) New Iloilo Airport Development Project 6) Mactan (Cebu) International Airport Project 7) Third Airport Development Project 8) Laguindingan Airport Development Project 9) Davao International Airport Development Project 10) Zamboanga .

Word. Modifying the appearance To change how the table of contents looks – font type, size, indentation etc. – click in the table and on Table of Contents on the References tab, then choose Custom Table of Contents again. In the Table of Contents dialog box, click the Modify button to

The TABLE OF CONTENTS will have shifted. If you need to re-insert the TABLE OF CONTENTS, this margin fix will not stay in place. You will have to follow the temporary fix again OR make a permanent fix to the TABLE OF CONTENTS. Permanent fix: Place your cursor at the first entry in the TABLE OF CONTENTS.

6 2021 Project Development Process Manual Project Development Process This Manual documents the basic approach used by INDOT in its project development process. It provides flow charts for each project category, each of which graphically illustrate the development of a typical project. The project manager and development team need to be

50 project tools, models and templates Develop a project with IRENA Project Navigator Industry-proven project development best practices BANKABLE PROJECT DEVELOPMENT The IRENA Project Navigator enables project stakeholders to avoid pitfalls that can jeopardise project success and helps to reduce the gap between project development

table of contents reviewed early. It is proposed that, in the digital environment, " the table of contents needs to be generated automatically to reflect the dynamic feature of "digital books" and online collections. the table of contents needs to provide an overview to contents of the documents it covers; the overview