2017 HCIS SAF DIRECTIVES - FEC Int

8m ago
8 Views
1 Downloads
514.36 KB
13 Pages
Last View : 13d ago
Last Download : 3m ago
Upload by : Dani Mulvey
Transcription

2017 HCIS SAF DIRECTIVES Role of Fire Protection Consultant

FEC International Offices in Khobar, Riyadh, Jeddah and Nicosia, Cyprus. We are an independent consultancy specializing in Fire Engineering, Technical Safety and Emergency Management We were the first company in the Kingdom of Saudi Arabia (KSA) to be approved and licensed by HCIS as a Fire Protection Consultant. We have been actively involved in HCIS related projects since 2010. Our Professional Expertise and in-depth knowledge on HCIS related projects within KSA speaks for itself and will be crucial to the success of your projects. 2

FEC International – Services Provided FEC provides a full spectrum of services covering: Fire Risk Engineering & Consultancy - Risk Analysis and Hazard Assessment - Fire Risk Assessment - Fire safety audits and due diligence Fire Protection Engineering & Design - Fire Protection, Detection & Alarm Systems Design Basis - Design of life and fire safety systems (Concept, FEED and DED) Fire Engineering Studies - Fire & Smoke Modelling Evacuation Modelling Consequence Modelling Gas dispersion Modelling 3

FEC International – Services Provided Continued: Emergency Management - Emergency Management Compliance Emergency Planning & development of Pre-Incident Plans Development of Evacuation Strategies Development of Fire & Life Safety Management Programs Development of Strategic Training, Fire & Life Safety Plans Field Services - Fire safety system inspection, review, assessment and certification - Testing and Commissioning of Fire Systems Design Review and Certification Services Installation Supervision, Inspection, Testing & Commissioning 4

HCIS KINGDOM OF SAUDI ARABIA Ministry Of Interior High Commission For Industrial Security (HCIS) The High Commission For Industrial Security is part of the Ministry of Interior. They are responsible for the development and implementation of Security, Safety and Fire Protection strategies kingdom-wide. 5

Sectors Under HCIS Jurisdiction Petrochemical Sector Gas Sector Sector Gas Port Sector Sector Port Industrial Services Non-Industrial Sector Sector including Railways Telecommunication Sector Mining Sector Water Sector Civilian Explosives Civilian Explosives Sector Sector Chemical Industry Sector Steel Industry Sector Petroleum Sector Electricity Sector 6

HCIS 2017 Directives The latest edition came into effect in April 2017 and consists of: 23 Safety & Fire Directives for Industrial Facilities 9 Safety & Fire Directives for Light & Non-Industrial Facilities 19 Security Directives for Industrial Facilities 3 Security Directives for Non-Industrial Facilities They are applicable to all companies & industrial establishments that fall under the HCIS Jurisdiction including: New projects The expansion of existing facilities Upgrades 7

Fire Protection Requirements As per SAF-01 the following shall be undertaken by an HCIS Approved Fire Protection Consultant: Fire Hazard Analysis Development of Engineering Design Packages Approval of FP Contractor's shop drawings for compliance with codes, standards and bid documents Troubleshooting during construction/Istallation of FP Systems Participating in commissioning of the Fire Protection Systems. 8

2017 HCIS Fire Protection Workflow Start Facility Owner Selects HCIS approved FP Consultant FP Consultant Develops Front Engineering Package for FP Systems FO Review HCIS Review Comments Facility Owner Selects HCIS approved FP Contractor FP Contractor Develops Installation Package FP Consultant Endorses FP Contractor Installation Package Comments FO Review FP Contractor Trains facility Personnel HCIS Review Facility Owner Operates Systems, Maintains Documentation FP Contractor Supplies, Installs, and Tests Systems Facility Owner FP Contractor Inspect, Test and Maintain Systems FP Consultant FP Contactor Commission FP Systems FO: Facility Operator FP: Fire Protection 9

FP FEED Stage : FP Consultant Role 30% Stage FP FEED Deliverables Design Concepts (SAF 03 / 04 / 08) Risk Assessments (SAF 03 / 04 / 08) Code Analysis (SAF 03) Facility Plan Assessment / Compliance Report (SAF 06 / 08) Facility Access and Egress Assessment / Compliance Report (SAF 06) 90% Stage FP FEED Deliverables Engineering Drawings (SAF 04) Hydraulic Calculations (SAF 04) 100% Stage FP FEED Deliverable Contractor Scope of Work (SAF 04) Data Sheets (SAF 04) 10

FP FEED Stage : FP Consultant Role 90% Stage FP FEED Deliverables. - Fire Suppression (NFPA 2001) Systems Gas Calculation - Fire Water Supply Hydraulic Calculations / Modeling - Fire Water Supply Design Drawings (Fire Water Tanks Fire Water Pumps) - Fire Water Hydrant System Design Drawings - Fire Detection and Alarm System Design Drawings - Fire Suppression (NFPA 2001) Systems Design Drawings - Hose / Standpipe System Design drawings - Fire Protection /Fire Detection Systems Technical Specifications - Fire Protection /Fire Detection Systems Data Sheets - Fire Detection and Alarm System Cause & Effect Charts 11

EPC Stage : FP Consultant Role EPC Construction Engineering / Installation Stage - Technical Review and Approval of FP Contractor Installation Package including Installation / Shop Drawings / Documents / Inspection and Test Plans - Technical support during the FP Contractor Scope Deliverable EPC Construction / Commissioning Stage - Onsite supervision / technical support during construction / installation (Recommend but not required) - Attendance at commissioning of the fire protection / alarm systems for Witness and Sign off the Acceptance Testing - Preparation and issue of Acceptance Testing Review Report 12

Thank You infoksa@fecint.com www.fecint.com

23 Safety & Fire Directives for Industrial Facilities 9 Safety & Fire Directives for Light & Non-Industrial Facilities 19 Security Directives for Industrial Facilities 3 Security Directives for Non-Industrial Facilities They are applicable to all companies & industrial establishments that fall under the HCIS Jurisdiction including:

Related Documents:

Usetheping sr-mpls fec fec-type igp isis CLIcommandtoexecuteanIS-ISSRpingandtheping sr-mpls fec fec-type bgp CLIcommandtoexecuteaBGPping. switch# ping sr-mpls 11.1.1.3/32 fec-type igp isis Sending 5, 100-byte MPLS Echos to IGP Prefix SID(IS-IS) FEC 11.1.1.3/32, timeout

NFPA 1006 Rescue Technician Professional Qualifications NFPA 1620 Pre-Incident Planning NFPA 1670 Operations and Training for Technical Rescue Incidents NFPA 1951 Protective Ensembles for Technical Rescue Incidents. HCIS Reviews: Submission Documents SAF-01 A list of non-compliances, if any

Pre-FEC and Post-FEC BER as Criteria for Optimizing Wireline Transceivers Ming Yang *, Shayan Shahramian †, Henry Wong †, Peter Krotnev †, and Anthony Chan Carusone * * Edward S. Rogers Sr. Department of Electrical and Computer Engineering, University of Toronto, Toronto, Canada † Huawei Technologies Canada, Kanata, Canada Abstract—Forward-error-correction (FEC) codes have

- presentations by users about OSI SAF products applications, and their needs for products evolutions or new products, - discussions about priorities for OSI SAF next phase (2017-2022), in the context of new satellite programs (MTG, EPS-SG, S3.). Posters from users and OSI SAF team, presenting scientific results related to OSI SAF

Spherical Roller Bearing Solid Block QAP13A215ST QMP18J308ST QVFL19V303ST E-4BF-TRB-2 Type E E-P4B-TRB-3 E-PF-TRB-2 E-TU-TRB-45MM SAF 22510 SAF SAF 22517 X 3 SDAF 22528 P 60 YAK1 SGT Ball . but does serve as a useful guide in spherical roller bearing and SAF pillow block housing selection. To view the complete engineering catalog, please .

Introduction This describes a possible baseline proposal for a new 4-lane interleaved 100G FEC sublayer for P802.3ck This new FEC sublayer could be used along with existing Clause 82 PCS and revised Clause 135 PMA to support the objectives for the 100GBASE-KR1 and 100GBASE-CR1 channels The intent of the presentation is not to propose the use of interleaved FEC for

The game-changer is Sustainable Aviation Fuels § SAF will only be used if it comes from sustainable sources, e.g. used cooking oil, waste and residues, (incmunicipal waste / waste gases), non-food crops, salt-water plants § SAF cuts life-cycle emissions by up to80% § SAF is a “drop-in” fuel, i.e. can be used immediately,

ASTM E1050 standard was updated in 1998 to include changes in the required physical dimensions of the tube. Specifically, the tube length was said to be increased to be sufficiently long to meet the requirement that plane waves be fully developed before reaching the microphones and test specimen. Further, a minimum of three tube diameters was specified between the sound source and the nearest .