Chstm2y9cx63tv84u2p8shc3-wpengine Dna-ssl

2y ago
10 Views
2 Downloads
2.47 MB
12 Pages
Last View : 1m ago
Last Download : 3m ago
Upload by : Ryan Jay
Transcription

DOWNTOWN LIBRARY WINDOW REPLACEMENTCBJ CONTRACT No. BE19-227292 MARINE WAYJUNEAU, AK 99801CONSTRUCTION DOCUMENT 105% APRIL 2019SPECIFICATIONSWINDOWSCASEMENT WINDOWSROLLER WINDOW SHADES1.11.1SUMMARYA. Includes Aluminum Clad Casement Windows and Accessories1.1SUMMARYA. Includes surface mounted, non-motorized roller blind assemblies.1.2SUBMITTALSA. Product data: For each type of productB. Shop Drawings: Include plans, elevations, sections, hardware, accessories, insect screens, operationalclearances, and details of installation, including anchor, flashing, and sealant installation.C. Samples: For each exposed product and for each color specified1.2SUBMITTALSA. Product data: for all products used.B. Samples: For fabric selection.1.3PRODUCTSA. Basis of design: Draper - Clutch Operated FlexShade1. Manual, chain-and-clutch operating mechanism with stainless steel chain.2. Roller Mounting Configuration: Single roller.3. Installation Type: Exposed roller.4. Shadeband Materials: Complying with NFPA 701.5. Light-Filtering Fabric: Non-PVC, woven or knit polyester, 3% lighttransmission.6. Product Safety Standard: WCMA A 100.1.1.2SECTION INCLUDESA. Insulated Glass Units (IGUs) for reglazing existing curtain wall system.B. Stainless steel shapes and mesh for fabrication and installation of safety screens for door openings in existingcurtain wall system.SUBMITTALSA. Product Data: For Insulated Glass UnitsB. Shop Drawings: For aluminum safety screens.C. Delegated Design: Fabricator’s engineer’s calculations indicating conformance of IGUs, and stainless steelscreens with load resistance criteria of 1.4.B – D below.D. Sample Warranty: For glass products.1.3WARRANTYA. Retain this article for special warranties. Verify length of warranty period with manufacturers.B. Insulated glass units and laminated glass for seals and delamination: 20 years.1.4PERFORMANCE REQUIREMENTSA. Performance criteria for insulated glass units:1. U-Value, Winter Night: GL-1 .23 max, GL-2 .252. Solar Heat Gain Coefficient: GL-1 .21 max, GL-2 .293. Visual Light Transmission: GL-1 43% min, GL-2 48%B. Delegated design of glass for insulated units for wind loads:1. 115mph (3 second gusts), Exposure C.C. Delegated design of stainless steel safety screen for horizontal loads:1. 50 lbs/lf and 200lb concentrated load.1.51.71.81.31.3GLASS MATERIALSA. Glass Type GL-1: Low-E-coated, tinted insulating glass.1. Outdoor Lite: ¼” fully tempered, heat-soaked float glass, CrystalGray tint, SNX 62/27 on #2 surface.2. Insulating Cavity: Argon Filled.3. Indoor Lite: ¼” fully tempered, heat-soaked float glass, clear, SunGuard IS20 on #4 surface.B. Glass Type GL-2: Low-E-coated, tinted insulating glass.1. Outdoor Lite: ¼” fully tempered, heat-soaked float glass, CrystalGray tint, SunGuard SN 68 on #2 surface.2. Insulating Cavity: Argon Filled.3. Indoor Lite: ¼” fully tempered, heat-soaked float glass, clear.ACCESSORY MATERIALSA. Warm Edge Spacer: Thermally non-conductive spacer with butyl rubber seal.B. Gaskets: Match existing.EXECUTIONA. Reglazing Existing Curtain Wall System1. Existing curtainwall system is interior glazed. IGUs establish location of vertical mullions. Before removingexisting IGUs, carefully mark location of vertical mullions to establish widths of replacement IGUs.2. IGUs in existing curtain wall system are gasketed, and existing gaskets are to be replaced. Retainrepresentative sample of each gasket type for sourcing replacement gaskets.3. Fabricate new IGUs based on field dimensions. Contractor solely responsible for determining size ofreplacement IGUs.4. Install replacement IGUs utilizing new gaskets for a water-tight systemB. Stainless Safety Screens1. Field-measure clear jamb to jamb and sill to head dimensions of existing curtain wall door openings.2. Fabricate safety screens based on field dimensions and clearances required for hardware. Contractor shallbe solely responsible for determining size of safety screens.3. Fabricate safety screens as follows: Miter and fully weld frame corner joints. Stainless steel woven mesh stitch weld to frame.4. Install stainless steel safety screens as indicated in drawings.FALL PROTECTION - METAL MATERIALSA. Stainless steel: ASTM A484 (ASTM A484M-18a)1. Angle Bar, 1/8” min. wall thicknessB. Stainless Steel Woven Mesh:1. Stainless Steel, Grade 316 Woven wire mesh2. McNichols #31046448103. 0.063 Dia wire4. 56% openWARRANTYA. Window: (20) years from date of Substantial CompletionB. Glazing Unit: (20) years from date of Substantial CompletionC. Aluminum Finish: (20) years from date of Substantial CompletionPRODUCTSA. Basis of design: Marvin Windows - Factory-assembled Aluminum Clad Ultimate Push OutCasement/Awning, operating exterior swing window on casement.1. Acceptable Alternate Manufacturers: PellaB. Glazing:1. Manufacturers Standard Insulated Glass Unit2. Seal: Silicone bedding at interior and exteriorC. Finish1. Exterior: Aluminum clad. Fluoropolymer modified acrylic topcoat applied over primer. Meets AAMA2605 requirements.2. Aluminum Clad Color: By owner.3. Interior Finish Option: By owner.D. Hardware:1. Casement Push Out hardware2. Multi-point sequential system with a single lock handle actuation.3. Handle: Oil Rubbed BronzeE. Weather Stripping:1. Provide full perimeter weather stripping for each operable sash unless otherwise indicated.F. Heavy Duty (Insect) Screen:1. Frame: Aluminum2. Screen Mesh: Grade 316 Stainless woven wire mesh McNichols 3108284810 (22-1/4 gauge) wire diameter 60% open1.4PERFORMANCE REQUIREMENTSA. Minimum Performance Class: CW-PG50-C1.5EXECUTIONA. Installation:1. Comply with manufacturer's written instructions for installing windows, hardware, accessories, andother components. For installation procedures and requirements not addressed in manufacturer'swritten instructions, comply with installation requirements in ASTM E2112.2. Install windows level, plumb, square, true to line, without distortion or impeding thermal movement,anchored securely in place to structural support, and in proper relation to wall flashing and otheradjacent construction to produce weathertight construction.3. Install windows and components to drain condensation, water penetrating joints, and moisturemigrating within windows to the exterior.4. Separate aluminum and other corrodible surfaces from sources of corrosion or electrolytic action atpoints of contact with other materials.5. Adjust operating sashes and hardware for a tight fit at contact points and weather stripping for smoothoperation and weathertight closure.6. Clean exposed surfaces immediately after installing windows. Avoid damaging protective coatings andfinishes. Remove excess sealants, glazing materials, dirt, and other substances.7. Remove and replace glass that has been broken, chipped, cracked, abraded, or damaged duringconstruction period.11.4WNINSTALLATIONA. Outside of jamb installation.B. Install in locations per sheet A2.0, base bid work locations only.NorthWindArchitects LLC126 Seward StJunueau, AK 99801Ph #907.586.6150www.northwindarch.com1SHEET INDEXG0.0A1.0A1.1A2.0A3.0COVER SHEETREFERENCE AND DEMOLITION PLANDEMOLITION ELEVATIONELEVATIONDETAILS AND SCHEDULESYMBOLSGRID LINE INDICATION1FACE OF / TOP OFCENTER OFAROOM IDENTIFICATIONROOM NAMERoom name##AX.X#INTERIOR ELEVATIONDASH INDICATES NOELEVATIONApril 23, 2019#1#SHEET NOTEREFER TO CONSTRUCTIONKEYNOTE LEGENDADDENDUM #1ISSUED 05/24/2019PLOT DATE:04/29/2019ISSUE DATE:04/29/2019

45678178' - 0"16' - 0"27' - 0"STAIRWELL127' - 0"27' - 0"27' - 0"27' - 0"1. ON-SITE WORK HOURS:A. REFER TO ADDENDUM #1 - ITEM 52. WORK MAY NOT COMMENCE UNTIL SUCH TIME ASDIRECTED BY THE CBJ BASED ON CBJ COORDINATIONWITH THE LIBRARY OF TEMPORARY MOVE-OUTACTIVITIES TO CLEAR WORK AREAS.3. CONTRACTOR SHALL BE RESPONSIBLE FORMAINTAINING ALL EXISTING FIRE PROTECTION, LIFESAFETY AND EGRESS SYSTEMS OTHERWISE AFFECTEDBY THE WORK FOR THE FULL DURATION OF THEPROJECT.4. CONTRACTOR SHALL FULLY PROTECT ALL LIBRARYPROPERTY AND EXISTING TO REMAIN FINISHESINCLUDING BUT NOT LIMITED TO WINDOW, WALL,FLOOR, CEILING CASEWORK AND ELEVATOR FINISHESWITHIN WORK AND WORK ACCESS AREAS USINGPOSITIVE PROTECTION MEANS SUCH AS FIRE RESISTIVEPOLYETHYLENE SHEET, FIRE RESISTIVE FOAM BOARD,AND HARD BOARD PRODUCTS. DAMAGE INCLUDESDAMAGE RESULTING FROM CONSTRUCTION ORCONSTRUCTION SUPPORT ACTIVITIES AND MOISTUREAND/OR AIR INFILTRATION THROUGH TEMPORARYOPENINGS IN THE EXISTING WINDOW/EXTERIOR WALLSYSTEM. DAMAGED, EXISTING TO REMAIN FINISHESSHALL BE REPAIRED OR REPLACED AT CONTRACTOR'SEXPENSE.5. CONTRACTOR SHALL FULLY PROTECT NON-WORKAREAS FROM CONSTRUCTION NOISE, DUST, DEBRIS,MOISTURE AND AIR INFILTRATION FROM OR THROUGHWORK AREAS.6. CONTRACTOR SHALL LAWFULLY DISPOSE OF ALLCONSTRUCTION WASTE AND CLEAN WORK AREAS ANDAFFECTED NON-WORK AREAS AT THE END OF EACHWORK SHIFT. CONSTRUCTION WASTE SHALL NOTACCUMULATE ON THE PREMISES.27' - 0"A1111FOYERCHILDRENS AREA4THISLOCATIONONLY58' - 0"MEETING 12116' - 0"BA1.142A2.04231FIXED STACKS58' - 0"MAIL SERVICES31PLANNORTHC1WNNorthWindArchitects LLC126 Seward StJunueau, AK 99801Ph #907.586.6150www.northwindarch.com1" ACTUALIF THE ABOVE DIMENSION DOES NOTMEASURE ONE INCH (1") EXACTLY, THISDRAWING WILL HAVE BEEN ENLARGED ORREDUCED, AFFECTING ALL LABEL SCALES.A. REPLACE EXTERIOR WINDOWS IN LIBRARY STAFFADMINISTRATION AREA: REMOVE AND SALVAGE FORREINSTALLATION INTERIOR WOOD CASINGS ANDSTOOLS.B. REMOVE AND DISPOSE OF EIGHT (8) EXISTINGALUMINUM CLAD WOOD CASEMENT WINDOWSINCLUDING EXTERIOR METAL FLASHINGS,MEMBRANE FLASHINGS, HARDWARE, SHIMS,ACCESSORIES, GAP INSULATION, BACKER ROD ANDSEALANTS.C. REPAIR ANY DAMAGE TO THE EXISTING WEATHERBARRIER AND TIE INTO WINDOW ROUGH OPENINGUSING MEMBRANE FLASHING, LAPPING SHEETS FORPOSITIVE DRAINAGE AND LEAVING TOP, HEAD EDGEOF WEATHER BARRIER LOOSE UNTIL IT CAN BELAPPED OVER AND SEALED TO NEW METAL HEADFLASHING. NEW METAL HEAD FLASHING SHALL HAVEDRIP EDGE.D. REPAIR ANY DAMAGE TO THE EXISTING VAPORBARRIER AND TIE INTO WINDOW ROUGH OPENINGMEMBRANE FLASHINGS.E. FURNISH AND INSTALL EIGHT (8) NEW ALUMINUMCLAD WOOD WINDOWS, EXTERIOR METALFLASHINGS, HARDWARE, SHIMS AND ACCESSORIESWITH GAP INSULATION, BACKER ROD AND SEALANTSAS REQUIRED. LAP AND SEAL WEATHER BARRIEROVER NEW METAL HEAD FLASHING. NEW METALHEAD FLASHING SHALL HAVE DRIP EDGE. ALLWINDOWS TO MATCH OPERATION OF EXISTINGWINDOWS AND BE INSTALLED WEATHERTIGHT.F. REPAIR ANY DAMAGE TO EXISTING EXTERIOR WALLCLADDING.G. REINSTALL SALVAGED INTERIOR WOOD CASINGSAND STOOLS, REPLACING WITH NEW WHEREEXISTING IS NOT SALVAGEABLE. FINISH/REFINISH ALLINTERIOR FACING WOOD TO MATCH FINISHAPPEARANCE OF EXISTING WINDOW TRIMELSEWHERE IN THE LIBRARY.EXTENT OFADD ALT. #1SMALL MEETING RMApril 23, 2019ADD ALTERNATIVE #1:33GENERAL NOTES:REFERENCE AND DEMOLITION PLAN - CURTAIN WALLSHEET NOTES1/16" 1'-0"11DEGLAZE CURTAIN WALL SYSTEM INCLUDINGACCESS DOORS, LEAVING EXISTING ALUMINUMCURTAIN WALL FRAMING AND DOOR LEAVESINTACT. DEMO EXISTING WINDOW BLINDS.RETAIN REPRESENTATIVE SECTIONS OFEXISTING, DEMOLISHED GASKET MATERIAL FORUSE IN IDENTIFYING CORRECT REPLACEMENTGASKET TYPE.2PROVIDE PROTECTION COVER FOR BOOKCASEHOUSING "ALASKA COLLECTION" USINGPOLYETHYLENE PLASTIC SHEETING.3SALVAGE (E) WINDOW BLINDS FOR REINSTALLTHIS AREA4(N) FALL PROTECTION - STAINLESS STEEL WOVENMESH292 MARINE WAYJUNEAU, AK 998013CBJ CONTRACT No. BE19-2272DOWNTOWN LIBRARY WINDOW REPLACEMENT1SHEET TITLE:REFERENCE ANDDEMOLITION PLANISSUED 05/24/2019CHECKEDDHDRAWNRESHEET #A1.0PLOT DATE04/23/2019ISSUE DATE04/29/2019

GENERAL NOTES:234561. ON-SITE WORK HOURS:A. REFER TO ADDENDUM #1 - ITEM 52. WORK MAY NOT COMMENCE UNTIL SUCH TIME ASDIRECTED BY THE CBJ BASED ON CBJ COORDINATIONWITH THE LIBRARY OF TEMPORARY MOVE-OUTACTIVITIES TO CLEAR WORK AREAS.3. CONTRACTOR SHALL BE RESPONSIBLE FORMAINTAINING ALL EXISTING FIRE PROTECTION, LIFESAFETY AND EGRESS SYSTEMS OTHERWISE AFFECTEDBY THE WORK FOR THE FULL DURATION OF THEPROJECT.4. CONTRACTOR SHALL FULLY PROTECT ALL LIBRARYPROPERTY AND EXISTING TO REMAIN FINISHESINCLUDING BUT NOT LIMITED TO WINDOW, WALL,FLOOR, CEILING CASEWORK AND ELEVATOR FINISHESWITHIN WORK AND WORK ACCESS AREAS USINGPOSITIVE PROTECTION MEANS SUCH AS FIRE RESISTIVEPOLYETHYLENE SHEET, FIRE RESISTIVE FOAM BOARD,AND HARD BOARD PRODUCTS. DAMAGE INCLUDESDAMAGE RESULTING FROM CONSTRUCTION ORCONSTRUCTION SUPPORT ACTIVITIES AND MOISTUREAND/OR AIR INFILTRATION THROUGH TEMPORARYOPENINGS IN THE EXISTING WINDOW/EXTERIOR WALLSYSTEM. DAMAGED, EXISTING TO REMAIN FINISHESSHALL BE REPAIRED OR REPLACED AT CONTRACTOR'SEXPENSE.5. CONTRACTOR SHALL FULLY PROTECT NON-WORKAREAS FROM CONSTRUCTION NOISE, DUST, DEBRIS,MOISTURE AND AIR INFILTRATION FROM OR THROUGHWORK AREAS.6. CONTRACTOR SHALL LAWFULLY DISPOSE OF ALLCONSTRUCTION WASTE AND CLEAN WORK AREAS ANDAFFECTED NON-WORK AREAS AT THE END OF EACHWORK SHIFT. CONSTRUCTION WASTE SHALL NOTACCUMULATE ON THE PREMISES.7CEILING HGT10' - 6"111111ST FLOOR0' - 0"DEMOLITION NORTH ELEVATION11/16" 1'-0"CBA1April 23, 2019WNNorthWindArchitects LLC126 Seward StJunueau, AK 99801Ph #907.586.6150www.northwindarch.com1" ACTUALIF THE ABOVE DIMENSION DOES NOTMEASURE ONE INCH (1") EXACTLY, THISDRAWING WILL HAVE BEEN ENLARGED ORREDUCED, AFFECTING ALL LABEL SCALES.111ST FLOOR0' - 0"2DEMOLITION WEST ELEVATION21/16" 1'-0"8736543ADD ALTERNATIVE #122211CEILING HGT10' - 6"1ST FLOOR0' - 0"3DEMOLITON SOUTH ELEVATION1/16" 1'-0"SHEET NOTES1BCADD ALTERNATIVE #11RETAIN REPRESENTATIVE SECTIONS OFEXISTING, DEMOLISHED GASKET MATERIAL FORUSE IN IDENTIFYING CORRECT REPLACEMENTGASKET TYPE.321ST FLOOR0' - 0"4DEGLAZE CURTAIN WALL SYSTEM INCLUDINGACCESS DOORS, LEAVING EXISTING ALUMINUMCURTAIN WALL FRAMING AND DOOR LEAVESINTACT. DEMO EXISTING WINDOW BLINDS.PROVIDE PROTECTION COVER FOR BOOKCASEHOUSING "ALASKA COLLECTION" USINGPOLYETHYLENE PLASTIC SHEETING. SEE 2/A1.1SHEET TITLE:DEMOLITIONELEVATIONISSUED 05/24/2019CHECKEDDHDRAWNRESHEET #DEMOLITION EAST ELEVATION1/16" 1'-0"3292 MARINE WAYJUNEAU, AK 998011A. REPLACE EXTERIOR WINDOWS IN LIBRARY STAFFADMINISTRATION AREA: REMOVE AND SALVAGE FORREINSTALLATION INTERIOR WOOD CASINGS AND STOOLS.B. REMOVE AND DISPOSE OF EIGHT (8) EXISTING ALUMINUMCLAD WOOD CASEMENT WINDOWS INCLUDING EXTERIORMETAL FLASHINGS, MEMBRANE FLASHINGS, HARDWARE,SHIMS, ACCESSORIES, GAP INSULATION, BACKER ROD ANDSEALANTS.C. REPAIR ANY DAMAGE TO THE EXISTING WEATHER BARRIERAND TIE INTO WINDOW ROUGH OPENING USING MEMBRANEFLASHING, LAPPING SHEETS FOR POSITIVE DRAINAGE ANDLEAVING TOP, HEAD EDGE OF WEATHER BARRIER LOOSEUNTIL IT CAN BE LAPPED OVER AND SEALED TO NEW METALHEAD FLASHING. NEW METAL HEAD FLASHING SHALL HAVEDRIP EDGE.D. REPAIR ANY DAMAGE TO THE EXISTING VAPOR BARRIER ANDTIE INTO WINDOW ROUGH OPENING MEMBRANE FLASHINGS.E. FURNISH AND INSTALL EIGHT (8) NEW ALUMINUM CLADWOOD WINDOWS, EXTERIOR METAL FLASHINGS,HARDWARE, SHIMS AND ACCESSORIES WITH GAPINSULATION, BACKER ROD AND SEALANTS AS REQUIRED.LAP AND SEAL WEATHER BARRIER OVER NEW METAL HEADFLASHING. NEW METAL HEAD FLASHING SHALL HAVE DRIPEDGE. ALL WINDOWS TO MATCH OPERATION OF EXISTINGWINDOWS AND BE INSTALLED WEATHERTIGHT.F. REPAIR ANY DAMAGE TO EXISTING EXTERIOR WALLCLADDING.G. REINSTALL SALVAGED WINDOW BLINDS, INTERIOR WOODCASINGS AND STOOLS, REPLACING WITH NEW WHEREEXISTING IS NOT SALVAGEABLE. FINISH/REFINISH ALLINTERIOR FACING WOOD TO MATCH FINISH APPEARANCE OFEXISTING WINDOW TRIM ELSEWHERE IN THE LIBRARY.CBJ CONTRACT No. BE19-2271DOWNTOWN LIBRARY WINDOW REPLACEMENTADD ALTERNATIVE #1:CEILING HGT10' - 6"SALVAGE (E) WINDOW BLINDS FOR REINSTALLTHIS AREAA1.1PLOT DATE04/23/2019ISSUE DATE04/29/2019

GENERAL NOTES:236' - 2"6' - 2"6' - 2" 3' - 0"45' - 10"3CEILING HGT10' - 6"5' - 10"5' - 10"55' - 10"5' - 10" 3' - 0"365' - 10"35' - 10"1. ON-SITE WORK HOURS:A. REFER TO ADDENDUM #1 - ITEM 52. WORK MAY NOT COMMENCE UNTIL SUCH TIME ASDIRECTED BY THE CBJ BASED ON CBJ COORDINATIONWITH THE LIBRARY OF TEMPORARY MOVE-OUTACTIVITIES TO CLEAR WORK AREAS.3. CONTRACTOR SHALL BE RESPONSIBLE FORMAINTAINING ALL EXISTING FIRE PROTECTION, LIFESAFETY AND EGRESS SYSTEMS OTHERWISE AFFECTEDBY THE WORK FOR THE FULL DURATION OF THEPROJECT.4. CONTRACTOR SHALL FULLY PROTECT ALL LIBRARYPROPERTY AND EXISTING TO REMAIN FINISHESINCLUDING BUT NOT LIMITED TO WINDOW, WALL,FLOOR, CEILING CASEWORK AND ELEVATOR FINISHESWITHIN WORK AND WORK ACCESS AREAS USINGPOSITIVE PROTECTION MEANS SUCH AS FIRE RESISTIVEPOLYETHYLENE SHEET, FIRE RESISTIVE FOAM BOARD,AND HARD BOARD PRODUCTS. DAMAGE INCLUDESDAMAGE RESULTING FROM CONSTRUCTION ORCONSTRUCTION SUPPORT ACTIVITIES AND MOISTUREAND/OR AIR INFILTRATION THROUGH TEMPORARYOPENINGS IN THE EXISTING WINDOW/EXTERIOR WALLSYSTEM. DAMAGED, EXISTING TO REMAIN FINISHESSHALL BE REPAIRED OR REPLACED AT CONTRACTOR'SEXPENSE.5. CONTRACTOR SHALL FULLY PROTECT NON-WORKAREAS FROM CONSTRUCTION NOISE, DUST, DEBRIS,MOISTURE AND AIR INFILTRATION FROM OR THROUGHWORK AREAS.6. CONTRACTOR SHALL LAWFULLY DISPOSE OF ALLCONSTRUCTION WASTE AND CLEAN WORK AREAS ANDAFFECTED NON-WORK AREAS AT THE END OF EACHWORK SHIFT. CONSTRUCTION WASTE SHALL NOTACCUMULATE ON THE PREMISES.75' - 10" 3' - 0"337' - 9"11ST FLOOR0' - 0"4CW1CW2CW3CW4111121' - 11 1/2"CW51NOTE: ALL NEW CURTAIN WALL GLAZING SHOWN TO BE GL-2NORTH11/16" 1'-0"CB5' - 10"5' - 10"5' - 10"5' - 10"5' - 10"5' - 10"5' - 10"A5' - 10" 3' - 0" 5' - 10"7' - 0"7' - 0"7' - 0"3' - 6"April 23, 2019WNNorthWindArchitects LLC126 Seward StJunueau, AK 99801Ph #907.586.6150www.northwindarch.com1" ACTUALIF THE ABOVE DIMENSION DOES NOTMEASURE ONE INCH (1") EXACTLY, THISDRAWING WILL HAVE BEEN ENLARGED ORREDUCED, AFFECTING ALL LABEL SCALES.31CW611ST FLOOR0' - 0"2CW7CW10CW12111NOTE: ALL NEW CURTAIN WALL GLAZING SHOWN TO BE GL-1WEST21/16" 1'-0"78CEILING HGT10' - 6"65432 6' - 2"3' - 6"3ADD ALTERNATIVE #11ST FLOOR0' - 0"NOTE: ALL NEW CURTAIN WALL GLAZING SHOWN TO BE GL-135' - 6"SOUTHCW8CW911A. REPLACE EXTERIOR WINDOWS IN LIBRARY STAFFADMINISTRATION AREA: REMOVE AND SALVAGE FORREINSTALLATION INTERIOR WOOD CASINGS ANDSTOOLS.B. REMOVE AND DISPOSE OF EIGHT (8) EXISTINGALUMINUM CLAD WOOD CASEMENT WINDOWSINCLUDING EXTERIOR METAL FLASHINGS, MEMBRANEFLASHINGS, HARDWARE, SHIMS, ACCESSORIES, GAPINSULATION, BACKER ROD AND SEALANTS.C. REPAIR ANY DAMAGE TO THE EXISTING WEATHERBARRIER AND TIE INTO WINDOW ROUGH OPENINGUSING MEMBRANE FLASHING, LAPPING SHEETS FORPOSITIVE DRAINAGE AND LEAVING TOP, HEAD EDGEOF WEATHER BARRIER LOOSE UNTIL IT CAN BE LAPPEDOVER AND SEALED TO NEW METAL HEAD FLASHING.NEW METAL HEAD FLASHING SHALL HAVE DRIP EDGE.D. REPAIR ANY DAMAGE TO THE EXISTING VAPORBARRIER AND TIE INTO WINDOW ROUGH OPENINGMEMBRANE FLASHINGS.E. FURNISH AND INSTALL EIGHT (8) NEW ALUMINUMCLAD WOOD WINDOWS, EXTERIOR METAL FLASHINGS,HARDWARE, SHIMS AND ACCESSORIES WITH GAPINSULATION, BACKER ROD AND SEALANTS ASREQUIRED. LAP AND SEAL WEATHER BARRIER OVERNEW METAL HEAD FLASHING. NEW METAL HEADFLASHING SHALL HAVE DRIP EDGE. ALL WINDOWS TOMATCH OPERATION OF EXISTING WINDOWS AND BEINSTALLED WEATHERTIGHT.F. REPAIR ANY DAMAGE TO EXISTING EXTERIOR WALLCLADDING.G. REINSTALL SALVAGED INTERIOR WOOD CASINGSAND STOOLS, REPLACING WITH NEW WHERE EXISTINGIS NOT SALVAGEABLE. FINISH/REFINISH ALL INTERIORFACING WOOD TO MATCH FINISH APPEARANCE OFEXISTING WINDOW TRIM ELSEWHERE IN THE LIBRARY.SHEET NOTES1/16" 1'-0"1BADD ALTERNATIVE #1C121ST FLOOR0' - 0"4EAST31/16" 1'-0"4DEGLAZE CURTAIN WALL SYSTEM INCLUDINGACCESS DOORS, LEAVING EXISTING ALUMINUMCURTAIN WALL FRAMING AND DOOR LEAVESINTACT. RETAIN REPRESENTATIVE SECTIONS OFEXISTING, DEMOLISHED GASKET MATERIAL FORUSE IN IDENTIFYING CORRECT REPLACEMENTGASKET TYPE.PROVIDE PROTECTION COVER FOR BOOKCASEHOUSING "ALASKA COLLECTION" USINGPOLYETHYLENE PLASTIC SHEETING.FURNISH & INSTALL SURFACE MOUNTED, NONMOTORIZED ROLLER BLIND ASSEMBLIES ATWIDTHS SHOWN. CONTRACTOR SHALL BERESPONISBLE FOR FIELD MEASURING OPENINGSTO DETERMINE SPECIFIC BLIND WIDTH.FALL PROTECTION - STAINLESS STEEL WOVENMESH292 MARINE WAYJUNEAU, AK 998013DOWNTOWN LIBRARY WINDOW REPLACEMENT3CEILING HGT10' - 6"CBJ CONTRACT No. BE19-227ADD ALTERNATIVE #1:SHEET TITLE:ELEVATIONISSUED 05/24/2019CHECKEDDHDRAWNRESHEET #A2.0PLOT DATE04/29/2019ISSUE DATE04/29/2019

(E) DOOR OPENINGApril 23, 2019W1 1/2 X 1 1/2" X 1/8" STAINLESS STEELGRADE 316 ANGLE FRAMEN(E) DOOR OPENINGSTAINLESS STEEL MESH, 316 GRADE2A3.0NorthWindArchitects LLC126 Seward StJunueau, AK 99801Ph #907.586.6150www.northwindarch.com1" ACTUALIF THE ABOVE DIMENSION DOES NOTMEASURE ONE INCH (1") EXACTLY, THISDRAWING WILL HAVE BEEN ENLARGED ORREDUCED, AFFECTING ALL LABEL SCALES.1/2" 1'-0"EXTERIOR1 1/2" X 1 1/2" X 1/8" STAINLESS STEEL GRAD 316 ANGLE FRAME,FASTENED TO ALUMINUM DOOR JAMBW/ #10 GASKETED STAINLESS STEEL GRADE 316 SCREWS 12' O.C.PREDRILL AND FLOOD EA HOLE W/ DOW 795 SILICONE SEALANTSTAINLESS STEEL MESH, 316 GRADESTITCH WELD 1-6 (4) SIDESCURTAIN WALL SCHEDULEINTERIOREXISTING DOOREXISTING CURTAIN WALLIDCW1CW2CW3CW4CW5CW6CW7CW8CW9CW10CW12GLAZING EA203.00 SF140.00 SF114.00 SF90.00 SF72.00 SF356.00 SF68.00 SF44.00 SF83.00 SF47.00 SF225.00 SFNOTESNOTE: ALL DIMENSION ARE TO BE FIELD VERIFIED BY CONTRACTOR2292 MARINE WAYJUNEAU, AK 99801SAFETY SCREENCBJ CONTRACT No. BE19-2271DOWNTOWN LIBRARY WINDOW REPLACEMENTTYP (4) CORNERSSHEET TITLE:DETAILS ANDSCHEDULEISSUED 05/24/2019CHECKEDDHDRAWNRESHEET #SAFETY SCREEN JAMBA3.03" 1'-0"PLOT DATE04/23/2019ISSUE DATE04/29/2019

5.Light-Filtering Fabric: Non-PVC, woven or knit polyester, 3% light transmission. 6.Product Safety Standard: WCMAA100.1. 1.4 INSTALLATION A.Outside of jamb installation. B.Install in locations per sheet A2.0, base bid work locations only. WINDOWS 1.1 SECTION INCLUDES A.Insulated Glass Units (IGUs) for reglazing existing curtain wall system.

Related Documents:

l DecryptionServices DPI-SSL/TLSClient l ViewingDPI-SSLStatus l DeployingtheDPI-SSL/TLSClient DecryptionServices DPI-SSL/TLSClient TIP:ForinformationaboutDPI-SSL,seeAboutDPI-SSL. SonicOS7DPI-SSLAdministrationGuide ConfiguringtheDPI-SSL/TLSClient 2 8

administrators of Windows Server 2003 & 2008R2 to harden SSL/TLS support. Administrators can manually edit and backup the SSL configuration and set PCI-DSS compliant SSL rules with a click of a button. Link SSL Audit (alpha) - A remote SSL audit tool able scan for SSL/TLS support against remote servers.

Proposed SSL 2015 Salary Midpoints versus SSL 3 and Market Present (SSL 3) SSL 2015 Midpoint SSL 2015 Midpoint/Market Benchmark (%) 11,400 154 12,084 144 12,809 135 13,578 127 . SSL 2015 vs. Market for Nurses (Total Guaranteed Compensation PBB) 17 (254%) (281%) (209%) SSL 2015 vs. Market for Teachers (Total Guaranteed Compensation PBB) 18 .

Go to SETUP - VPN Settings - SSL VPN Server - SSL VPN Policies, create a policy that allow the SSL VPN users to access remote network. Add a SSL VPN policy and follow below parameters on SSL VPN Policy Configuration Page. Policy For: Global Apply Policy to: All Addresses Policy Name: Allow_all_address Begin: 0 End: 65535 Service: All .

Genetic transformation and DNA DNA is the genetic material in bacterial viruses (phage) The base-pairing rule DNA structure. 2. Basis for polarity of SS DNA and anti-parallel complementary strands of DNA 3. DNA replication models 4. Mechanism of DNA replication: steps and molecular machinery

Recombinant DNA Technology 3. Recombinant DNA Technology 600 DNA ISOLATION AND PURIFICATION Basic to all biotechnology research is the ability to manipulate DNA. First and foremost for recombinant DNA work, researchers need a method to isolate DNA from different organisms. Isolating DNA from bacteria is the easiest procedure because bacterial cells

2. At the end of DNA replication, (four/two) new strands of DNA have been produced, giving a total of (four/six) strands of DNA. 3. New DNA is replicated in strands complementary to old DNA because production of new DNA follows the rules of (base pairing/the double helix). Identifying Structures On the lines corresponding to the numbers on the .

Public Authority 2013 -2014 Annual Progress Report on: . established in June 2011 following a special two day residential meeting. A range of qualitative and quantitative evidence was analysed in order to assess the context for the successor five year strategy and to form a picture of current priorities and challenges. Other evidence examined included the changed economic context, the .