DVR-D33750-J-5761 Rev.: 0

2y ago
14 Views
2 Downloads
202.06 KB
6 Pages
Last View : 10d ago
Last Download : 3m ago
Upload by : Ryan Jay
Transcription

DVR-D33750-J-5761Rev.: 0Particulars of DesignManufacturer:National Oilwell Varco Norway A/SLocation:Kristiansand S, NORWAYPurchase order no:Utility Handling ToolInstallation:Statoil Cat J No.1 – SHI Koje Shipyard Hull no. 7117Id No:D33750Archive no:37602409, ElectronicRegulatory body:PSA NorwayThis is to verify that the design of:G9816 - Utility Handling Toolhas been reviewed and found to comply with:[1]DNV GL’s Offshore Standard DNV-OS-E101 “Drilling Plant”, October 2009,[2]DNV GL’s Offshore Service Specification DNV-OSS-201 “Verification for Compliance withNorwegian Shelf Regulations”, October 2013. Sec.7 DRILL(N)Form code: DVR 01aRevision: 2016-05 DNV GL 2014. DNV GL and the Horizon Graphic are trademarks of DNV GL AS.www.dnvgl.comPage 1 of 6

DVR-D33750-J-5761 Rev.:0The verification is based on the followingA. Design codes/standards used as referencesFEM Rules for the design of hoisting appliances, 3rd edition 1998.Eurocode 3, Design of steel structures, April 2006B. Design limitationsDesign ParameterValueSafe working load, SWL:HookGripper headMinimum design temperatureMaximum design temperatureArea classificationFEM appliance classificationDesign lifetimeHorizontal outreachSlew angle:BoomHeadTilt angle:inner armouter armhead (up)head (down)Gripper head tubular capacityGuide head tubular sizeMax slew speedMax telescope speedMax tilt speedMax telescope push/pull forceSlew torque, drive / breakDynamic factorHydraulic pressureHydraulic flowPower consumption(equivalent)1200kg500kg-20 C 45 CZone 1A2 (Q2 U2)20 years746 to 7406mm 180 180 64 123 93 -105 2 5/8” to 10”2 7/8” to 30”0.6 rpm0.1 m/s3 /sec40kN50 / 70 kNm1.15207 bar180 l/min100WEnvironmental loads at elevation DF 2900mm:AccelerationsConditionStill waterOperation ofthe UtilityHandling ToolSurvivalAccidental heelWind[m/s]Horizontal aH[m/s2]0.00Vertical ccelerations are total accelerations including the gravity component of roll and pitch angles.Form code: DVR 01aRevision: 2016-05www.dnvgl.comPage 2 of 6

DVR-D33750-J-5761 Rev.:0C. Design SpecificationsDrwg./Doc. .544213622020TitleGA, 317 UHTGA, 317 UHTAD, UHT, bottom foundationAD, UHT, KingAD, UHT, Middle boomAD, UHT, Telescopic boomAD, UHT, Grip headAD, UHT, Grip head diesAD, UHT, Guide headAD, UHT, Control panelAD, UHTAD, UHT, Expansion BD instrument, 317 UHTTD, 317 UHTTD, 317 UHT,LD, 317 UHT power distribution, 317 UHTLD, PLC configuration, 317 UHTLD, Base unit / ESD config, 317 UHTLD, AI, 317 UHTForm code: DVR 01aRevision: 2016-05Installation flangeBottom FoundationBottom boomMiddle boomTelescopic boom, outer boxTelescopic boom, middle boxTelescopic boom, inner boxHead frameJawsLink armLink arm – centerPin Ø30x264mmJawsDie keeper endPin Ø70x328mmPin Ø70x480Pin Ø60x280mmSlide PlateFlange bushingLink armEnd cover plateTop foundationPin Ø30/Ø35x227,5mmPin Ø60x284mmPin Ø70x389mmWire guidePosition Transmitter ArmDie frame lock plateShim pladeClawUHTUHTUHTUHTwww.dnvgl.comPage 3 of 6

DVR-D33750-J-5761 1000LD,LD,LD,LD,LD,LD,LD,LD,LD,LD,LD,DO, 317 UHTAO, 317 UHTCounter, 317 UHT317E1-IB010, 317 UHT-JB001, 317 UHT-JB002, 317 UHT-JB003, 317 UHT-JB004, 317 UHT-JB005, 317 UHT-JB006, 317 UHT-JB007, 317 UHTDoc. No.Rev.TitleG9816-Z-RD-0080Utility Handling ToolD. CalculationsE. Material SpecificationsComponentsMaterialMinimum Yield StrengthMain steel (see drawingsfor details)S355355 MPaEN 1.4418QT900Gr. 8.8Gr 10.9Gr 12.9750 MPa42 J at -20 C640 MPa900 MPa1080 MPa27 J at -20 CStructural bolts (as perdrawing)**Charpy35 J at -20 CFor all thicknessesF. Fabrication ProceduresTest Procedures:1- Charpy testing of the materials shall be carried out in accordance to DNV-OS-E101 Ch.2 Sec.2 Bat or below minimum design temperature.2- Pressure testing of the hydraulic system/components shall be tested in accordance to DNV-OSE101 Ch.2 Sec.7 D200.NDE Procedures:3- Non-destructive examination shall be carried out in accordance to DNV-OS-E101 Ch.2 Sec.7 C.Welding Procedures:4- Qualifications of welding procedures and qualification of welders shall be in accordance to DNVOS-E101 Ch.2 Sec.7 B.G. CorrespondencesReferenceJ-5819 (IN)J-5979 (IN)Form code: DVR 01a“Subject” / Content“FW: D33750 - G9816 - Missing drawings” / Submission ofadditional drawingsRE: D33750 - G9816 - Fatigue and Cylinder / Slew bearingcapacities Clarification of fatigue capacity and capacity ofslew bearingRevision: 2016-05www.dnvgl.comDate2016-08-252016-10-06Page 4 of 6

DVR-D33750-J-5761 Rev.:0H. Comments2456(PE)The following Hydraulic cylinders shall be delivered with Product Certificates. Theminimum required capacities are as follow:Inner Boom tilt Cylinders (per cylinder)Min allowable / holding compression capacity 196.5 kN / 242 kN-Telescope tilt cylinder (per cylinder):Min allowable / holding compression capacity 188 kN / 217.5 kN-Telescope cylinder:Min allowable / holding compression capacity 44.2 kN / 61.3 kNMin allowable / holding tension capacity 41.9 kN / 54.2 kN2499(PE)The Cylinder of the head claw shall be delivered with a DNV GL product. The minimumcapacities are as follow:Working / Holding compression force: 197 kN2457(PE)Guide cylinders - position H01 on drawing number D1327-A0008 - shall be deliveredwith at least Manufacturer’s Work Certificate2458(PE)The slew drive shown on drawing number D1327-A0002 revision 4 (model WD-H-0373)shall be delivered with a DNV GL product certificate.2459(PE)The Rotobox shall be delivered with a DNV GL product certificate.For the minimum required capacity, see Appendix A08.6 and Appendix A09.32460(PE)Bolts for connections to the slewing ring (dwg D1327-A0002) shall be delivered with3.1 certificates.2461(PE)2462(PE)Other structural bolts shall as a minimum be delivered with 2.2 certificates.2463(PE)For Ex components with EX certificates with certificate number that is ending with a “U”or “X” where measures to obtain compliance with the special conditions given in thecertificate are required, shall be documented and demonstrated to local DNV GLsurveyor.EX documentation for this system is assumed to be submitted in a common completepackage to the yard. EX documentation is also to be provided and presented to theDNV GL surveyor at site. It is assumed that the electrical equipment installed iscertified for the relevant/correct zone.2464(PE)Overload testing at 1.25 SWL (hook load) shall be carried out after installation inaccordance to DNV-OS-E101 Ch.2 Sec.7 D300. Considerations shall be made torequirements as specified in D304.2465(PE)Gripper head holding capacity shall be verified through testing at 2xSWL in accordanceto DNV-OS-E101 Ch.2 Sec.5 F104.2466(PE)Testing of the equipment, as specified above, shall be carried out according to receivedFAT program, and witnessed as relevant by attending DNV GL surveyor. Additionaltests might be required.2467(PE)Functional testing after installation shall be carried out in accordance to DNV-OS-E101Ch.2 Sec.7 D400. Gripper head functionality with SWL shall be properly addressed intesting. All safety functions shall be included.Form code: DVR 01aRevision: 2016-05www.dnvgl.comPage 5 of 6

DVR-D33750-J-5761 Rev.:0Høvik, 2016-10-11for DNV GLDigitally Signed By: Aker, Alf HenryLocation: DNV GL Høvik, NorwaySigning Date: 14/10/2016 , on behalf ofEsvall, PerHead of SectionMOANO376Junalik, BrunoSenior EngineerVerified by:Ola E. RuudDistribution:Orig: National Oilwell Varco Norway A/S, att.: Administrator NOVADMCC:DNV GL KristiansandForm code: DVR 01aRevision: 2016-05[Fax: 47 38 19 26 04]www.dnvgl.comPage 6 of 6

2- Pressure testing of the hydraulic system/components shall be tested in accordance to DNV-OS-E101 Ch.2 Sec.7 D200. NDE Procedures: 3- Non-destructive examination shall be carried out in accordance to DNV-OS-E101 Ch.2 Sec.7 C. Welding Procedures: 4- Qualifications of welding procedures and qualification of welders shall be in accordance to DNV-

Related Documents:

DVR MODELS DVR-7004/D-NET DVR-7008/D-NET DVR-7016/D-NET DVR-7408-NET DVR-8808-NET DVR-8816-NET DVR-8824-NET DVR-8832-NET . Belkin Router Netgear Router Westell Router Netopia Router Two-Wire Router Motorola Router Linksys Wireless Router Enable the system by checking the enabled box. .

TruVision DVR 10 TruVision NVR 10 TruVision DVR 11 TruVision NVR 11 TruVision DVR 12 TruVision NVR 20 . TruVision DVR 60 TruVision NVR 21 Plus TruVision DVR 12HD TruVision NVR 50 TruVision DVR 15HD TruVision NVR 22 TruVision DVR 44HD TruVision NVR 22S TruVision DVR 45HD TruVision NVR 22 Plus TruVision

WPS-DVR iOS / Android App User Guide pg. 2 3. SELECT A DEFAULT DVR The WPS-DVR app can be set to connect to and view a Default DVR (instead of the device list) as soon as the app is opened. Only one DVR may be configured as the Default DVR at any time. To configure a Default DVR: A. Add one or more DVRs as described above. B.

The exceptions are the DIRECTV Genie and HR34 DVR receivers, which have five tuners and count as five tuners when calculating tuners for a SWM installation. Number of non-DVR receivers 2 x Number of DVR receivers Total tuners for SWM8 installation Example Two non-DVR receivers and three DVR receivers are being used for a SWM8 installation. 2 non-DVR receivers 2 x 3 DVR receivers 8 .

3. In connection screen, enter DVR IP, Port, User ID and Password for login to the DVR server. DVR IP: IP address of the remote DVR server. Port: The connection port of the remote DVR server. The default value is 5550. User ID: The user account to login the remote DVR server. Password: The password for login authentication. 4. When connection is successful, the screen will display the video .

B. Install and run WPS-DVR (WPS-DVR-HD for iPad ) on your Apple Device. 2. Add the DVR as a Device A. Select the Add button to add the DVR to the Device List. B. In Device Name, enter a name for the DVR. C. In Address enter the DVR's IP address or DDNS name. x If connecting on a local network: enter the IP address (Ex: 192.168.101).

XOS Series Rackmount DVR XOS Compact DVR DVR Lite DVW-304N DVW-304T DVW-616 DVW-816 Stand Alone DVR MOBILE DVRS X-Series Mobile DVR Xr4 Mobile Digital Recorder Mobile Accessories DVR Accessories CAMERAS The Titan Speed Dome DVW Speed Dome SM1065N/SM1065P G1315NF/G1315PF D2815NVF / D2815PVF D2315NVF/D23

reading is to read each day for at minimum 30 minutes. Please turn in all assignments to your child’s teacher in the fall. May you have a blessed, restful, relaxing, enjoyable and fun-filled summer! Sincerely, Thomas Schroeder & Vicki Flournoy Second Grade Summer Learning Packet. DEAR FAMILY, As many of you are planning for your summer activities for your children, we want you to remember .