Update to BOEM on JIP Studyon Reliability ofSubsea Blowout PreventersSeptember 13, 2010Lafayette, LaFrank Gallander, ChevronChair, API RP‐53 Committee1

Reliability of SubseaBlowout Preventers JIP Study commissioned in April 2007 This study. examined the historical reliability ofsubsea well control systems, operating in theGulf of Mexico (GOM) Reviewed all subsea wells drilled during thethree‐year period (January 1, 2004 ‐December 31, 2006) Final subsea report issued May 12, 20092

Reliability of SubseaBlowout Preventers First reliability based study since 1996 and1999 (Tetrahedron & SINTEF respectively) Included the largest number of 5th & 6thgeneration rigs Industry’s first statistically based study at thecomponent and system levels3

RESULTS OF SUBSEA BOP RELIABILITYEquipment Probability of Success: 99% 4

RESULTS OF SUBSEA BOP RELIABILITYEquipment Failure Frequency5

RESULTS OF SUBSEA BOP RELIABILITY Total Number of MMS Subsea Wells239 Total Number of Wells Recorded238 Total Number of Test Records4 ,244 Total Number of Failures Recorded62 Average Regulatory Tests Per Well21 Total Number of Component Tests89,189 Average component Tests per Well375 Confidence Factor of the data99.58% (Goal of 95%)Distribution of Failures from Subsea BOP Reliability Study6

RECOMMENDATIONS TO MMS1) Clarify § 250.449 (c) to clearly define that testing all possible redundant control possibilities isnot required.2) Clarify § 250.449 (h) to explicitly state that wellbore pressure testing also satisfies regulatoryrequirements of function testing.3) Modify § 250.447 to incorporate: (b) maximum BOP wellbore pressure test interval of 35days(c) limit BOP wellbore pressure testing before drilling out each string of casing or a liner to thoseidentified in the APD.4) Modify § 250.449 as follows: (d) pressure test BSR only at points designated and approved inthe APD, (e) change the maximum interval between any blind or blind‐shear ram BOP pressuretests from 30 to 77 days.5) MMS issue a safety alert describing pressure de‐rating of annulars fitted with large bore drillpipe elements.7

RECOMMENDATIONS TO APIAPI RP‐53; Recommended Practices for Blowout Prevention Equipment Systems for DrillingWells:1) Update Figures 4 and 5 describing minimum stack requirements.2) Specific issues for discussion:a. Provide additional details for testing of the hydraulic operating system to more closely replicateconditions subsea.b. Provide a protocol for testing spring and stem integrity on stack valves.3) Change:a. the recommended maximum time between wellbore pressure tests in 18.3.3.c to 35 days and that allcrews are properly trained to conduct said wellbore pressure tests,b. 18.5.9 to specify conducting locks only ram wellbore pressure tests for every stump test, as well as, adiscussion on the risks and preventative measures to minimize risks during locks only testing.4) Adding the following to 18.3.1Ensure Emergency Disconnect System and Deadman systems, if installed, are tested while latched on asubsea wellhead, at least initially after a rig comes out of the shipyard.API 16A; Specifications for Drill Through Equipment:1) Adding locks only pressure testing rams every 500 psi in the qualification tests listed in 5.7.2) Increasing API fatigue testing for ram locking systems listed in Appendix C2.2 by dramaticallyincreasing the number of locking cycles.8

Current API InitiativesWorking to update RP‐53, 16A and 16D. API RP‐53 and API Sub‐Committees 16A and 16D(Specification for Control Systems for Drilling Well ControlEquipment and Control Systems for Diverter Equipment)have reconvened RP‐53 committee has broad industry participation (BOEMinvited). Documents under review for content Dept of Interior 30 Day Report (May 27, 2010) NTL‐2010‐05 & 06 JIP Study Recommendations Final reports of the several Deepwater Horizoninvestigations9

API Recommended Practices andSpecifications Focus Areas Stack configurationsClear definitionsStandardizations within the industryResults from Deepwater Horizon Investigations, asthey are made available to the public10

Reliability of Subsea Blowout Preventers JIP Study commissioned in April 2007 This study examined the historical reliability of subsea well control systems, operating in the Gulf of Mexico (GOM) Reviewed all subsea wells drilled during the three‐year period (January 1, 2004 ‐ December 31, 2006)

Related Documents:

BOEM ENVIRONMENTAL STUDIES PROGRAM: ONGOING STUDIES BOEM OCS Region: Gulf of Mexico . hydrocarbons (PAHs) and other ecotoxicological markers of contaminants relative to sex, age, and colony (Seiser et al. 2000, Trust et al. 2000, Alonso-Alvarez et al. 2007a, Esler . baseline ecological information. Data to be collected may include but not .

3.3 Danfoss JIP Hot Tap Valves with Hot Tapping Machine Toolbox 8 4. Operational Instructions 9 4.1 Branch Preparations before the Hot Tapping 9 4.1.1 Removing the Insulation 9 4.1.2 Adjusting the Hot Tap Valve 9 4.1.3 Welding of the Hot Tap

range of fields, as well as powder metallurgy. This Special Issue on Iron and Steel Powders pres-ents a summary of technical trends in the respective fields of use, including powder metallurgy applications, and an outline of JFE Steel's "JIP " iron powder prod-ucts. 2. Industrial Fields of Application for Iron Powders and

relative potential of U.S. offshore areas as sources of oil and natural gas. This report represents an update of the 2013 Comprehensive Inventory Report and reflects information consistent with the Bureau of Ocean Energy Management's (BOEM) latest 2016 National Assessment of Undiscovered Technically Recoverable Oil and Gas Resources on the

Double-crested Cormorant ( DCCO) proportional relative abundance by BOEM area and season 18 Dovekie (DOVE) proportional relative abundance by BOEM area and season 19 . South Carolina Call Area - Grand Strand 3.6e-05 1.1e-04 9.6e-05 6.9e-07 South Carolina Call

lease sale was proposed by BOEM on June 14, 2021, through a Proposed Sale Notice (PSN), which encompassed 627,331 acres and was published in the Federal Register (86 FR 31524). A 60-day comment period followed. BOEM received 134 comment submissions in response to the PSN, which are available on regulations.gov (Docket ID:

The offshore wind industry is poised for significant growth in the United States. A necessary step in the . Humboldt Call Area and areas within and adjacent to the Morro Bay Call Area for offshore wind energy development. In July 2021, BOEM designated the Humboldt WEA and published the Morro Bay East .

API RP 500 and API RP 505 NFPA 497 and NFPA 499. PETRONAS Technical Standards provides guidelines to ensure proper management of Ex Equipment. 1. Ex Electrical Equipment Inspection and Maintenance Guidelines (Ex IMG) Standards and Guidelines Personnel Inspection Maintenance 2. Ex Equipment Repair Guidelines (Ex ERG) 3. Ex Management Assessment Guidelines (Ex MAG) 4. Ex .