Preventive Maintenance Manual 15/03/13/Rev1/ Preventive Maintenance Manual 1

The information contained herein contains proprietary information of ST Electronics (Satcom & Sensor Systems) Pte Ltd and may not be copied, used or disclosed in whole or in part to any third party except with written approval of ST Electronics (Satcom & Sensor Systems) or if it has been authorised under a contract. 15/03/13/Rev1/ Preventive Maintenance Manual 2

1 Introduction 4 2 Quarterly 5 Task & Procedure 6 3 Biannually 7 4 Annually 8 Task & Procedure 9 Biennially 10 Task & Procedure 11 Triennially 12 Task & Procedure 13 As Needed 14 Task & Procedure 15 2.1 4.1 5 5.1 6 6.1 7 7.1 15/03/13/Rev1/ Preventive Maintenance Manual 3

1 . INTRODUCTION The program presented in this manual represents the minimum requirements for AgilFence PIDS and its peripheral devices. However, more frequent service may be warranted in specific sites which require more care. The purpose of this maintenance program is to promote repair consistency and cost efficiency, and assure that the system is in good operating condition. ST Electronics (Satcom & Sensor Systems) is the manufacturer of AgilFence PIDS, the PIDS system described in this manual and as such is responsible for the system safety, reliability and performance only if: 1. installation 2. calibration & recalibration 3. changes and repair have been carried out by authorised personnel and if the system equipment is used according to the instructions provided and operation is only entrusted to qualified, trained personnel. ST Electronics (Satcom & Sensor Systems) is not liable to any damages derived from the non-compliance with the aforementioned recommendations. This document provides a recommended schedule of preventive maintenance categorised according to their frequency: - Quarterly Biannually Annually Biennially Triennially As needed 15/03/13/Rev1/ Preventive Maintenance Manual 4

. 2 Quarterly Task PTZ Camera Outdoor UPS System Description Cleaning the outer body of the camera. Clearing of lizard/bird waste. Clean the internal of the cover. Clear all the waste and dirt. . Cleaning the outer body of the enclosure. Clear all the waste and dirt inside the compartment. Measure the voltage of the backup battery. Check all the connectors are attached to the device. Check for loose mounting. Check all devices are working and Note Refer to 2.1 for task and procedure. powered up. Fixed Camera Housing Cleaning of Camera Housing. Clear lizard eggs/shit of the internal 15/03/13/Rev1/ Preventive Maintenance Manual Refer to 2.1 for 5

Task Description Note housing if any. Thermal Camera Cleaning the body of the camera. Cleaning the lens of the camera. task and procedure. Refer to 2.1 for task and procedure. 15/03/13/Rev1/ Preventive Maintenance Manual 6

2 1 Task & Procedure Task Cleaning PTZ Camera Cleaning Fixed Camera Housing Thermal Camera Description Note Inform OCC on which camera we are doing the servicing. Lower the PTZ camera. Clear all the waste and dirt. Clean the internal of the perspex cover. Fix back the cover. Ensure they are tightened properly. Clean the outer of the cover. After finish servicing, inform OCC. Inform OCC on which camera we are doing the servicing. Lower the camera. Clear all the waste and dirt inside the housing. Clean up the glass panel of the camera housing. After finish servicing, inform OCC. Inform OCC before doing the servicing. 15/03/13/Rev1/ Preventive Maintenance Manual Lower the camera pole, gently. When cleaning the perspex cover, use a clean cloth. Secure the collapsible pole tightly. Lower the camera pole, gently. Secure the collapsible pole tightly after servicing. Lower the camera 7

Task Description Lower the camera. Clean the body of the camera Cleaning the lens of the camera After finish servicing, inform OCC 15/03/13/Rev1/ Preventive Maintenance Manual Note pole, gently. Secure the collapsible pole tightly after servicing. 8

. 3 Biannually Task Server Rack in AOC Room NVR System Description Clean and dust inside and outside of the rack. Check the KVM is working. Check PIDs server is working. Check the UPS system is working The replace battery LED is not lighted up. Replace the back battery if indicator light up. Check there is not beeping at the UPS. Beeping indicate Low Battery Warning Level. Ensure all connectors are secure. Check the status of each PIDs sensor through AgilFence Signal Processing Unit software, if pre-tension value is below threshold, perform pre-tension activity. Clean and dust inside and outside of the rack. Check all the equipment in the rack are working. 15/03/13/Rev1/ Preventive Maintenance Manual Note Refer to 7.1 for task and procedure. Refer to 4.1. for task and procedure. 9

Task Description Check all the connectors are connected. Check all the used ports of the network switches communicating LED lights are blinking. Check all the CCTV images. Test out the Pan/Tilt/Zoom of all the PTZ cameras. Check the recording of the NVR. Record the earliest recording date. 15/03/13/Rev1/ Preventive Maintenance Manual Note 10

. 4 Annually Task Fibre Optic Sensor Cable and GI conduit at Fencing Metal Containment Splicing Enclosure Box Description Check the sensor cable is attached with cable ties. Replace new cable ties if there is breakage. Outer jacket of the sensor is not injured. Replace new sensor cable if the outer jacket is damaged. GI conduit pipe, coupling (socket) and space bar saddle is not rust. Paint it if they are rusty. The conduit pipe is fastening with space bar saddle, and the leave of the saddle is not loose. Tighten the screw if loose. Replace new screws if missing. Enclosure box is not loose and shaky. Tighten the box if it is loose. The box cover is not damaged. Replace a new cover if it is damaged. Internal of the box are clean. Does 15/03/13/Rev1/ Preventive Maintenance Manual Note 11

Task Description Note not have any ants or lizard eggs/shits Clean or brush away all the wastes. 15/03/13/Rev1/ Preventive Maintenance Manual 12

4 1 Task & Procedure Task Pre-Tensioning of sensor cable Description Inform OCC on which cluster, channel and sensor that is working on. Pre-tensioning is perform using bragg meter. Inform OCC on completion. At AOC, check the status through AgilFence Signal Processing Unit to confirm the affected sensor cable is back to it threshold value. 15/03/13/Rev1/ Preventive Maintenance Manual Note 13

. 5 Biennially Task Outdoor UPS Description Note Replace of backup battery 15/03/13/Rev1/ Preventive Maintenance Manual Refer to 5.1 for task and procedure. 14

5 1 Task & Procedure Task Replace backup battery at Outdoor UPS Description Note Inform OCC on replacing which UPS battery. Switch off the circuit breaker. Replace new backup battery. Write a label over the new battery on date of replacement. Inform OCC on completion of the replacement. 15/03/13/Rev1/ Preventive Maintenance Manual Do not allow the battery terminal in contact with metal body. Secure the terminal tightly. 15

. 6 Triennially Task Solar Obstruction Light Description Note Replace of internal battery 15/03/13/Rev1/ Preventive Maintenance Manual Refer to 6a. for task and procedure. 16

6 1 Task & Procedure Task Replace Solar Obstruction light internal battery Description Note Inform OCC before replacing the internal battery. Lower the collapsible pole. Dismantle the Solar light. Replace the new battery. Re-install Solar light. After finish servicing, inform OCC. 15/03/13/Rev1/ Preventive Maintenance Manual Lower the camera pole, gently. Secure the collapsible pole tightly after servicing. 17

. 7 As Needed Task Outdoor UPS UPS/ back battery in Server Rack. Equipment at Server Rack Description Note Replace faulty UPS System Refer to 7.1. for Task And Procedure. Refer to 7.1 for Task and Procedure. Replace faulty UPS System Replace faulty equipment in the rack Solar Obstruction Light Refer to 7.1 for Task And Procedure. Replace faulty set 15/03/13/Rev1/ Preventive Maintenance Manual Refer to 7.1 for Task and Procedure. 18

7 1 Task & Procedure Task Outdoor UPS UPS/backup battery in Server Rack Equipment at Server Rack Description Inform OCC before replacing the faulty UPS system. Switch off the circuit breaker. Replace the new UPS System. Switch on the circuit breaker. Inform OCC on completion of the replacement. Inform OCC before replacing the UPS System. Shut down and switch off all the server and equipment that is using the UPS system. Replace the new UPS System. Plug back all equipment that is using the UPS System. Power up the UPS system. Power up all the equipment/ server. Inform OCC on completion. Inform OCC before replacing the faulty equipment. Switch off the faulty equipment. 15/03/13/Rev1/ Preventive Maintenance Manual Note 19

Task Solar Obstruction Light Description Replace with a new one. Inform OC on completion. Note Inform OCC before replacing the faulty set. Lower the collapsible pole. Dismantle the faulty set. Replace and install the new one. Inform OCC on completion of the replacement. 15/03/13/Rev1/ Preventive Maintenance Manual Lower the camera pole, gently. Secure the collapsible pole tightly after servicing. 20

ST Electronics ( Satcom & Sensor Systems ) Pte Ltd 15/03/13/Rev1/ Preventive Maintenance Manual 1 Ang Mo Kio Electronics Park Road, #06‐02, ST Engineering Hub, 21 Singapore 567710 T: (65) 6521 7888 F: 6521 7801 www.agilfence.com Regn.: 199103901W

15/03/13/Rev1/ Preventive Maintenance Manual 3 1 Introduction 4 2 Quarterly 5 2.1 Task & Procedure 6 3 Biannually 7 4 Annually 8 4.1 Task & Procedure 9 5 Biennially 10 5.1 Task & Procedure 11 6 Triennially 12 6.1 Task & Procedure 13 7 As Needed 14 7.1 Task & Procedure 15

Related Documents:

PICKET FENCE 3 PICKET FENCE Tall Closed Picket Nothing finishes off a property like a Ply Gem Picket Fence. We have made choosing a picket fence easy by offering our great-looking selection of fence styles and colors in all price ranges. Even your neighbors will love your fence, because Ply Gem Fence & Railing's

against the fence pivot block (Figure 2). 6. Tighten the resaw lock handle. 7. Pull the fence handle up and place the fence assembly on the rail. 8. Push the fence handle down to lock the fence assembly in place. 5. Install the resaw fence lock handle (with the 8mm washer and moving plate) onto the fence, then slide the resaw fence over the

the INCRA Wonder Fence as a free-standing router table fence or you can mount it directly to the INCRA Jig Ultra for the ultimate router table fence setup . If you have purchased the TS/Wonder Fence table saw fence upgrade kit, you can mount the fences directly to your INCRA TS table saw fence for use with a router table extension wing .

―Ohio Partition Fence Law, A Procedural Guide for Townships‖ available on our website. What is a Line Fence? The law defines a ―partition fence‖ or ―line fence‖ as a fence placed on the division line between adjacent properties. The new law expanded this definition in R.C. 971.01(E) by also including a fence that has

Preventive Medicine and Public Health Preventive Medicine and Pediatrics Healthcare and Primary Care Preventive Medicines and Vaccinations Occupational Health and Safety Preventive Medicine and Pathology Preventive Medicine and Diabetes Preventive Medicine and Geriatrics 13:10-13:15 GROUP PHOTO 13:15-14:00 LUNCH BREAK MEETING HALL 01 MEETING .

can use the INCRA Wonder Fence as a free-standing router table fence or you can mount it directly to the INCRA Jig Ultra for the ultimate router table fence setup . If you have purchased the TS/Wonder Fence table saw fence upgrade kit, you can mount the fences directly to your INCRA TS table saw fence for use with a router table extension wing .

AC CHARGER 6' 10 '10 POWER SOURCE 1 2 4 3 Install Intelligizer Fence Monitor next to your existing AC fence charger* in a clean, sheltered location. Unplug your AC charger. Install the fence sensor cables on the Ground and Fence terminals of your AC charger. Intertwine the fence sensor wire ends around your existing fence and ground wires. It

Introducción 2.1 Principios básicos. 2.2 Características de los proyectos de desarrollo. 2.3 Mentalidad ágil. 2.4 El tríangulo ágil. 2.5 El manifiesto ágil. 3.1 Pilares y valores. 3.2 Roles. 3.3 Herramientas. 3.4 Actividades. 3.5 Pasos para el desarrollo del plan PM4R Agile. 4.1 Análisis y consulta a los interesados. 4.2 Paso 1: Análisis de los elementos existentes de planificación