2018 IPC Sections 308 Through 316 - ICC

1y ago
49 Views
2 Downloads
773.70 KB
8 Pages
Last View : 9d ago
Last Download : 3m ago
Upload by : Bennett Almond
Transcription

Study Session 3 2018 IPC Sections 308 through 316— General Regulations II OBJECTIVE: To develop an understanding of those general provisions regarding plumbing systems that are not specifically addressed in other chapters of the code. To develop an understanding of the provisions that apply to materials in all plumbing applications REFERENCE: Sections 308 through 316, 2018 International Plumbing Code KEY POINTS: What piping is required to be supported? What seismic requirements apply? What types of materials are permitted to be used for hangers, anchors and supports? How is the interval of support for both horizontal and vertical piping determined? When is sway bracing required? When are piping restraints required, and what methods are acceptable? What requirements apply to hot and cold water piping installed in bundles? What regulations apply to plumbing systems and equipment installed in flood hazard areas? What plumbing systems are required to be located above the designated flood elevation? What plumbing systems are permitted to be located below the designated flood elevation? What light, ventilation and interior finish requirements apply to washrooms and toilet rooms? What plumbing facilities are required for construction workers? When is testing required for piping systems? What are the methods for testing? What criteria apply to the maximum increments in test gauges? When is pressure air testing not permitted? What test requirements apply to shower liners? What components of a plumbing system require annual inspection and testing? 49

KEY POINTS: What requirements apply to the collection and disposal of condensate wastes? (Cont’d) When are auxiliary systems required for the disposal of condensate wastes? When are traps required for condensate piping systems? When are pipe penetrations required to be sealed? What materials are approved for sealing around the pipes? How are pipe penetrations of fire-resistance-rated assemblies regulated? What specific design, submittal, documentation and inspection requirements apply to alternative engineered designs? 50 2018 IPC Study Companion

Topic: Sway Bracing Reference: IPC 308.6 Category: General Regulations Subject: Piping Support Code Text: Where horizontal pipes 4 inches (102 mm) and larger convey drainage or waste, and where a pipe fitting in that piping changes the flow direction greater than 45 degrees (0.79 rad), rigid bracing or other rigid support arrangements shall be installed to resist movement of the upstream pipe in the direction of pipe flow. A change of flow direction into a vertical pipe shall not require the upstream pipe to be braced. Discussion and For larger pipes, hangers alone may not be sufficient to resist the forces created by water Commentary: movement within horizontal piping at a change in direction. To maintain alignment and prevent damage to the piping system adjacent to the elbow fitting, rigid sway bracing is required when the horizontal change in direction exceeds 45 degrees and the piping is 4 inches or greater in diameter. For SI: 1 inch 25.4 mm, 1 degree 0.018 rad. Sway bracing is installed to resist side-to-side movement of horizontal piping at a change in direction. A change in horizontal direction of 45 degrees or less is not considered significant enough to cause pipe movement. Study Session 3 51

Topic: Anchorage Reference: IPC 308.7 Category: General Regulations Subject: Piping Support Code Text: Anchorage shall be provided to restrain drainage piping from axial movement. For pipe sizes greater than 4 inches (102 mm), restraints shall be provided for drain pipes at all changes in direction and at all changes in diameter greater than two pipe sizes. Braces, blocks, rodding and other suitable methods as specified by the coupling manufacturer shall be utilized. Discussion and This section requires a method of resisting axial movement of piping systems in order to Commentary: prevent joint separation, regardless of the type of fittings or connections used. In particular, mechanical couplings using an elastomeric seal (typically hubless piping systems) have a limited ability to resist axial movement (pulling apart); therefore, pipe restraints must be provided to prevent joint separation. Section 308.7.1 requires axial restraints for pipe sizes greater than 4 inches at each change in direction and at each location with a change greater than two pipe sizes. Such joints also have a limited ability to resist shear forces. The hanger and support system must, therefore, prevent the couplings and connections from being subjected to shear forces that can damage the joint. Although mechanical couplings using elastomeric seals are most often the type of joint to experience damage that is due to axial movement, this restraint requirement applies to changes in direction for all types of piping that exceed 4 inches in diameter. 52 2018 IPC Study Companion

Topic: Parallel Water Distribution Systems Reference: IPC 308.9 Category: General Regulations Subject: Piping Support Code Text: Piping bundles for manifold systems shall be supported in accordance with Table 308.5. Support at changes in direction shall be in accordance with the manufacturer’s instructions. Where hot water piping is bundled with cold or hot water piping, each hot water pipe shall be insulated. Discussion and Typically, manifold systems distribute individual water supply lines to each fixture using Commentary: PEX or some other semirigid plastic piping or tubing. The individual lines may be bundled together, and such bundles are treated as a single unit for determining hanger spacing. Installation also must comply with the manufacturer’s installation instructions, which include the required supports at changes in direction to maintain a smooth transition without damaging, deforming or reducing the cross-sectional area of the piping. To prevent thermal transfer, the code requires each hot water pipe to be insulated when hot water piping is bundled with other piping. Bundles of PEX piping typically are held together loosely with plastic ties to allow for expansion and contraction of the individual pipes. Study Session 3 53

Topic: Test Gauges Reference: IPC 312.1.1 Category: General Regulations Subject: Tests and Inspections Code Text: Gauges used for testing shall be as follows: 1. Tests requiring a pressure of 10 pounds per square inch (psi) (69 kPa) or less shall utilize a testing gauge having increments of 0.10 psi (0.69 kPa) or less. 2. Tests requiring a pressure of greater than 10 psi (69 kPa) but less than or equal to 100 psi (689 kPa) shall utilize a testing gauge having increments of 1 psi (6.9 kPa) or less. 3. Tests requiring a pressure of greater than 100 psi (689 kPa) shall utilize a testing gauge having increments of 2 psi (14 kPa) or less Discussion and A test gauge must be chosen to accurately measure the air pressure and clearly indicate Commentary: any drop in pressure so as to detect a leak in the piping system. For example, a test gauge with increments of 1or 2 psi will not provide the necessary accuracy when testing a piping system with only 5 psi of air pressure. In such a case, a small drop in pressure would not be noticeable on the gauge. 5 0 10 15 PRESSURE GAUGE WITH 0.10 PSI INCREMENTS FOR TESTING AT 10 PSI OR LESS The permit holder is responsible for performing the tests and giving reasonable advance notice to the code official that the system is ready for inspection and observation of the testing. 54 2018 IPC Study Companion

Topic: Drainage and Vent Water Test Reference: IPC 312.2 Category: General Regulations Subject: Tests and Inspections Code Text: A water test shall be applied to the drainage system either in its entirety or in sections. In testing successive sections, at least the upper 10 feet (3048 mm) of the next preceding section shall be tested so that no joint or pipe in the building, except the uppermost 10 feet (3048 mm) of the system, shall have been submitted to a test of less than a 10-foot (3048 mm) head of water. This pressure shall be held for not less than 15 minutes. The system shall then be tight at all points. Discussion and All drain, waste and vent (DWV) piping must be tested in an appropriate manner to verify Commentary: that there are no leaks in the system. For a water test (the most common method of testing the DWV system) all portions of the system are filled with water, including 10 feet of water-filled vertical pipe above all piping being tested. The uppermost 10 feet of the system that includes the highest vent through the roof only needs to be filled with water and does not require 10 feet of head pressure. Fill to required height Cap or plug all vents, fixtures and building drain 30" Building drain DWV systems: Water: 10-foot head for 15 minutes Air: 5 psi for 15 minutes For SI: 1 inch 25.4 mm, 1 foot 304.8 mm, 1 psi 6.895 kPa. Building sewer Building sewer: Fill with water for a 10-foot head for 15 minutes A-433 For other than plastic piping, the code also permits testing the DWV system with air at a pressure of 5 psi. Pressure air testing of plastic pipe can pose significant safety risks on account of the stored energy of the compressed air. Study Session 3 55

Topic: Water Supply System Test Reference: IPC 312.5 Category: General Regulations Subject: Tests and Inspections Code Text: Upon completion of a section of or the entire water supply system, the system, or portion completed shall be tested and proved tight under a water pressure not less than the working pressure of the system; or, for piping systems other than plastic, by an air test of not less than 50 psi (344 kPa). This pressure shall be held for not less than 15 minutes. The water utilized for tests shall be obtained from a potable source of supply. The required tests shall be performed in accordance with this section and Section 107. Discussion and Water piping typically is tested by capping the outlets and connecting to the domestic Commentary: potable water supply. In cases where the water supply is not yet available or to test isolated portions of the system, the code also permits testing of copper water piping with air at a pressure of 50 psi. Testing with air is not permitted on plastic piping systems because of the hazards of a sudden release of energy, which could cause a separated piece of piping or a fitting to become a projectile causing serious injury. 56 2018 IPC Study Companion

Reference: IPC 308.9 Subject: Piping Support Code Text: Piping bundles for manifold systems shall be supported in accordance with Table 308.5. Support at changes in direction shall be in accordance with the manufacturer's instruc-tions. Where hot water piping is bundled with cold or hot water piping, each hot water pipe shall be insulated.

Related Documents:

IPC 3000 Lakeside Drive Suite 309S Bannockburn, Illinois 60015-1249 Tel 847 615.7100 Fax 847 615.7105 IPC 中国 电话:400-621-8610 邮箱:BDAChina@ipc.org 网址:www.ipc.org.cn 上海青岛深圳北京苏州成都 取代: IPC-A-610E,2010年4月 IPC-A-610D,2005年2月 IPC-A-610C,2000年1月 IPC-A-610B,1994年12月 IPC-A-610A .

IPC 改版履歴: IPC-A-610F WAM1 - 2016年2 IPC-A-610F - 2014年7 IPC-A-610E - 2010年4 IPC-A-610D - 2005年2 IPC-A-610C - 2000年1 IPC-A-610B - 1994年12 IPC-A-610A - 1990年3 IPC-A-610 - 1983年8 If a conflict occurs between the English and translated versions of this document, the English version will take precedence.

Venodyne boots- calf/thigh VasoPress DVT System IPC Vascutherm IPC Thrombus pumps - calf/thigh IPC Thromboguard IPC Sequential pneumatic hose IPC Sequential compression device IPC IPC Rapid inflation asymmetrical compression (RIAC) devices IPC Pneumatic intermittent impulse compression device Plexipulse-calf/thigh IPC

Ipc Module Ipc - IPC Manager Used to initialize IPC and synchronize with other processors. Application must call Ipc_start and Ipc_attach. Two startup protocols Ipc.ProcSync_ALL - all processors start at same time Ipc.ProcSync_PAIR - host processor starts first Configuration Ipc.procSync configures startup protocol When using Ipc.ProcSync_ALL, Ipc_attach is .

308-391 Uniform Commercial Code, Article 9. 308-408 Definitions. 308-408A Licensing. 308-408B Education. 308-408C Standards of practice. DISPOSITION OF CHAPTERS FORMERLY CODIFIED IN THIS TITLE Chapter 308-390 UNIFORM COMMERCIAL CODE, REVISED ARTICLE 9 308-390-100 General provisions. [Statutory Authority: Chapters

IPC-A-610, Acceptability of Electronic Assemblies IPC-A-610EC, Telecommunications Addendum to IPC-A-610 (in development) *IPC-J-STD-001, Requirements for Soldered Electrical and Electronic Assemblies IPC-A-600, Acceptability of Printed Boards IPC-6012, Qualification and Performance Specification for Rigid Printed Boards

discussed. IPC-6011, IPC-6012C, J-STD-003B and IPC-A-600H Block 3: 1400-1500 (Including one coffee break) Electronic Assembling and Soldering. What is a lead free process. Acceptability and Requirements for Electronic Assemblies will be discussed using IPC Standards; J-STD-001F, IPC-610F, IPC-7711/21B and IPC-620B

IPC-3, IPC-5 USER MANUAL REV. 2.04 7 TEKNIC, INC.PHONE (585)784-7454 IPC-3 SPECIAL SAFETY NOTE Unlike the IPC-5, the IPC-3 is an open frame power supply. As such, there are user-accessible, hazardous voltage points present on the device.