Government of Western Australia Department of Mines, Industry Regulation and Safety Building and Energy Industry Bulletin 117 Improving tie-down of timber framed sheet metal clad roofs This Industry Bulletin provides technical guidance and information to assist with improving the tie-down of timber framed (including stick-built and truss framed) sheet metal clad residential roofs. A question and answers format is provided to address common queries, misunderstandings and non‑compliances to assist builders, building surveyors, designers, inspectors and other relevant stakeholders within the building industry. Background This information addresses common construction issues identified through ongoing building audits as well as concerns and queries raised by various stakeholders in the Western Australian building industry. It also addresses concerns that the current Building Code of Australia and referenced Australian Standards do not have a simple deemed-to-satisfy solution for the WA construction practice of attaching tie-down straps to timber roof/over battens. To assist with onsite construction compliance, documentation for these elements within the building permit drawings is strongly recommended. This information could include the member size and grade, tie-down position and fixings, and other relevant information referred to in Industry Bulletin 093 – Documentation for timber roof construction Diagrams are provided for typical timber wall plates and over-battens used in WA for the purpose of rafter/truss tie-down. A flowchart describing a design methodology for appropriate tie-down of houses with timber-framed roofs is also included. Tie-down battens/wall plates could be sized by a suitably qualified structural engineer to ensure compliance with the applicable building standards. Timber suppliers also have span tables for tie-down battens available online. May 2019 The following information has been collated by Building and Energy in collaboration with a recognised expert in timber and wind engineering. It supplements information provided in Australian Standard AS 1684.2: 2010 – Residential timber-framed construction; Part 2: Non‑Cyclonic Areas (AS 1684.2).

Department of Mines, Industry Regulation and Safety Roof tie-down question and answer: Metal battens Timber battens 1. Where a nailed connection is insufficient for fastening metal battens to timber rafters, can metal battens be fixed with a screw on one side of the batten and a nail on the opposite side, if the position of the screw is alternated between rafters? 2. A. No. The strength of this connection is the same as the double nailed connection. (The nail would fail first at its normal capacity, and then the batten would be prised over the top of the screw head.) The nail/screw connection does not have higher capacity than a nail/nail connection. Where a nailed connection is insufficient for fixing timber battens to timber rafters or trusses (i.e. metal clad roof), can the timber battens be attached with bugle (No. 14, Type 17 screw) fixings alternated with nail fixings along the length of the battens? A. No. Nails do not have sufficient capacity so would fail at less than the design wind speed. The batten would not have enough bending capacity to span the distance between the remaining screws. Manufacturers that have carried out an appropriate standard of testing typically recommend two screws for all metal roof battens into softwood timber rafters. Note: Although the published capacity of some types of nails into JD5 (i.e. MGP10) timber may indicate they have sufficient capacity, until they have been tested in metal battens, they should not be used to fix metal battens. Figure 02 Nails are not sufficient and will fail causing the standard batten to be overloaded between screwed batten connections Nailed connections Figure 01 Nails are not sufficient and will fail at the same load as if there was a nail each side IB 117 – Improving tie-down of timber framed sheet metal clad roofs 3. Can machine driven nails be used in metal plate connector brackets (e.g. multigrips, triple grips)? A. Machine-driven nails in straps or metal plate connectors should only be used if the manufacturers of the straps/ metal connectors recommend them for that situation. In some cases, conditions for use may include installing an extra nail, or only using specially designed connectors for machine driven nails. Palm nailers can be used to drive connector nails accurately into holes in standard metal plates and straps (similar to hand-driving). 2

Department of Mines, Industry Regulation and Safety General roofing Perimeter tie-downs 4. Are lateral restraints required for each end of steel strutting beams? 8. Can roofing be screwed into tie-down battens? A. Yes (generally). They are required for timber beams as per Clause 7.2.6 of AS 1684.2 and steel beams have the same tendency to slide or rotate. In many cases, blocking pieces can be fitted to the timber top plate and bolted to the top of the beam to act as lateral restraints. A. Yes. In fact, fixing the roofing to tie-down battens increases their capacity to resist net roof uplift forces. Tie-down battens can be used in the same way as standard battens, but standard battens can’t always be used as tie-down battens. For example, metal top hat battens can be used as standard battens, but not as tie-down battens as under uplift forces, the metal batten will crush under the strap. 5. What should I do if a framing anchor hasn’t been nailed correctly? (E.g. nails are too close to the edge of the framing anchor, or timber has split underneath the connection) 9. What tie-downs are required either side of large openings? A. Most defective connections can be bridged by installing a strap into undamaged timber using the correct number of nails. This should occur in accordance with applicable building standards or under the direction of a suitably qualified engineer. A. It depends on the wind classification and the size of the opening. Stronger straps installed into the brickwork at floor level or metal rods into the concrete slab may be required either side of larger openings. There is often insufficient weight of brickwork on top of the lintel to resist the uplift forces by tying to only the lintel. 6. Can the same tie-down connections be used for standard trusses and girder trusses? A. No. Girder trusses need stronger tie-downs than standard trusses. Truss suppliers provide tie-down options and guidelines for correct installation. 7. Do hip rafters need to be tied down at the corners of houses? A. Yes. Hip rafters need stronger tie-downs than standard rafters as they have larger tributary areas and therefore carry larger loads. IB 117 – Improving tie-down of timber framed sheet metal clad roofs 10. When fixing a tie-down strap, does it make a difference if the connectors (nails) are fixed to the near face, top face or far face of the timber top plate, rafter or batten? A. Yes. The full capacity of the strap requires at least five nails in JD5 (i.e. MGP10 pine) timber. Five nails won’t fit in a single face and the strap must be looped over the timber and the nails distributed between the near face, top face and far face of the timber. Installing at least one nail into the far face of the timber means that the strap is bent twice. The double bend increases the connection capacity (AS 1684.2 gives higher capacities for connections using looped straps). 3

Department of Mines, Industry Regulation and Safety 11. Where the strap is to be tied to a tie‑down batten, can the required number of nails to the tie‑down straps be shared between the top plate and the tie‑down/cavity batten? A. No. All the nails must be installed into the tie‑down batten. (Note that if the tie‑down strap is to be fixed to the top plate, framing anchors may be required between rafters and top plates to transfer the uplift forces from the rafter to the top plate as shown in Figure 3.) Methodology for appropriate tie-down of houses with timber framed roofs Perimeter tie-downs only? No Yes Design internal tie-downs – *ULW underpurlin spacing Perimeter ties *ULW ½ underpurlin spacing eaves Perimeter ties *ULW ½ house width across ridge eaves Perimeter tie-downs using Figure 03 This acts as a two nail connection to either the over‑batten or wall plate Tie-down (cavity) battens Rafters Top plates Check cavity batten capacity Design rafter to top plate connections Check top plate capacity 12. Can perimeter tie-down only be used on any house? A. Perimeter tie-down only is commonly used in truss roofs and the tie-downs must have sufficient capacity to resist the forces indicated in the truss design. For framed (stick built) roofs, AS 1684.2 allows perimeter tie-down only for coupled roofs in N1 and N2 wind classifications. Engineers can provide details that enable framed roofs to be tied down at the perimeter for houses in N3 and above. Size connection, check brickwork capacity Design tie-downs around large openings * Note: for more details on ULW, refer to Figure 9.5 of AS 1684.2/a suitably qualified engineer IB 117 – Improving tie-down of timber framed sheet metal clad roofs 4

Department of Mines, Industry Regulation and Safety Guidance to using tie-down battens/top plates in sheet roofs Notes: 1. Tie-down straps should be installed taut and straight plumb over tie-down battens as shown in Figures 4 and 5. 2. Span tables may specify that tie-down straps can be installed at any location on the batten/top plate or need to be within a set distance from the rafter. 3. Fastening roof sheeting to tie-down battens increases the maximum ULW able to be carried by the tie-down batten. 4. Battens are not generally suitable to support construction loads prior to fixing the roof cladding. 5. Batten fixings should comply with the tie-down requirements specified in AS 1684.2 (fixings for 45mm deep timber battens should be 1 x 75mm long No. 14 Type 17 screws for N1 and N2 site wind classifications. Longer screws may be required in N3 and N4 sites for some batten and rafter spacings.) 6. Batten spacings must also comply with maximum spacing requirements applicable to the roof sheeting manufacturer’s product information. Figure 04 Tie-down strap over tie-down/cavity batten Figure 05 Tie-down strap over top plate with framing anchors on rafters Disclaimer – The information contained in this fact sheet is provided as general information and a guide only. It should not be relied upon as legal advice or as an accurate statement of the relevant legislation provisions. If you are uncertain as to your legal obligations, you should obtain independent legal advice. 8.30am – 4.30pm Level 1 Mason Bird Building 303 Sevenoaks Street (entrance Grose Avenue) Cannington Western Australia 6107 W: www.dmirs.wa.gov.au E: bcinfo@dmirs.wa.gov.au Plumbers enquiries: 6251 1377 Regional Offices Goldfields/Esperance Great Southern Kimberley Mid-West North-West South-West (08) 9021 9494 (08) 9842 8366 (08) 9191 8400 (08) 9920 9800 (08) 9185 0900 (08) 9722 2888 IB 117 – Improving tie-down of timber framed sheet metal clad roofs National Relay Service: 13 36 77 Translating and Interpreting Service (TIS): 13 14 50 This publication is available in other formats on request to assist people with special needs. 5 DMIRSAPR19 5818 / Online Building and Energy Department of Mines, Industry Regulation and Safety 1300 489 099

Guidance to using tie-down battens/top plates in sheet roofs Notes: 1. Tie-down straps should be installed taut and straight plumb over tie-down battens as shown in Figures 4 and 5. 2. Span tables may specify that tie-down straps can be installed at any location on the batten/top plate or need to be within a set distance from the rafter. 3.

Related Documents:

N6 Technical Guide Timber Curtain Wall Timber Curtain Wall Technical Guide N7 Timber Curtain Wall Detail Timber Curtain Wall Corner Detail Curtain Wall CL to CL 34 7/8" [887mm] Glass 33 7/8" [861mm] CL to CL 34 7/8" [887mm] Glass 33 7/8" [861mm] F.S. Timber to Timber 103 11/16" [2634mm] Outside Dimension 111 3/8" [2829mm]

Timber service life design - Design Guide for Durability 06. Timber-framed Construction - Sacrificial Timber Construction Joint 07. Plywood Box Beam Construction for Detached Housing 08. Stairs, Balustrades and Handrails Class 1 Buildings - Construction 09. Timber Flooring - Design Guide for Installation 10. Timber Windows and Doors 11.

1 EN 14081 -1:2005 A1:2011 Timber structures Strength graded structural timber with rectangular cross section Part 1: General requirements 2 EN 14080:2013 Timber structures - Glued laminated timber and glued solid timber - Requirements 3 EN 14374:2004 Timber structures - Structural laminated veneer lumber - Requirements

Masonic Bolo Tie BBL2937 96/dz 14 each Shrine Bolo Tie BS2508 108/dz 16 each Sphinx Bolo Tie BS2533 108/dz 14 each Shrine/Sunburst Bolo Tie BSF25 108/dz 14 each ANY SMALL EMBLEM AVAILABLE ON SUNBURST Shrine Plain Bolo Tie BS2687 108/dz 14 each Shrine Bolo Tie BS3353 144/dz 24 each www.ralphsingerjewelry.com

I saw Esau sitting on a seesaw. I saw Esau; he saw me.! Ralph rakes leaves really, really lousily. !!!!! Lady Luck dislikes losers ! Kantai can tie a tie. If Kantai can tie a tie, why can't I tie a tie like Kantai can

100-06 COnCRETE TIE 100S-09 COnCRETE TIE 429-20 COnCRETE TIE Elastic Fastener System: e-Clip 610 lbs Length: Railseat positive 277 in-kips Center negative 152 in-kips Tie Spacing: Meets AREMA structural performance criteria for tie spacing from 24" to 30" on center 6.5 mm pad Rail Seat Cant: 1:40 Rail Section: 136 lb rail or other 6" base .

The failure of tie rod may cause instability of vehicle and cause an accident.so it is important to check the strength of tie rod. The load coming on tie rod is mostly . For this analysis the tie rod with diameter 19 mm and length 405 mm of bolero car is considered. The tie rod is made up of steel material. For material analysis we are .

programming Interrupt handling Ultra-low power Cortex-M4 low power. STM32 F4 Series highlights 1/4 ST is introducing STM32 products based on Cortex M4 core. Over 30 new part numbersOver 30 new part numbers pin-to-pin and software compatiblepin and software compatible with existing STM32 F2 Series. Th DSP d FPU i t ti bi d tThe new DSP and FPU instructions combined to 168Mhz performance open .