1 Longview Power – Reliable, Economic, Clean Coal October 6, 2015

2 Longview Power Overview 778 MW gross (700 MW net) coal fired plant Located near Morgantown, WV Total project cost was approximately 2.0B Primarily owned by major private equity firms Commenced operations in December 2011 Mine mouth coal provided by conveyor Lowest cost generator of any coal plant in region Lowest heat rate in PJM power market Exceptionally low emissions Highly efficient water balance with minimal wastewater discharge (zero to surface water)

3 Longview Boiler Island Amec Foster Wheeler - Boiler Island Steam Generator - Once thru, supercritical, sliding pressure Low mass flux vertical tube design Efficiency 90% Rated steam flow 4,875,000 lbs/hr MS/RH Steam Temps 1,052 F/1,056 F Combustion System Opposed wall arrangement 6 mills, full load on 5 mills 36 low NOx burners & 16 OFA registers Selective Catalytic Reactor (SCR) 2 1 design Haldor Topsoe Corrugated Plate DNX-XD

4 Longview AQCS Islands Amec Foster Wheeler – Air Quality Control System (AQCS) Acid Mist Reduction Hydrated lime injection system Particulate Matter (PM) Removal 99% Removal pulse jet fabric filter (PJFF) SO2 Removal Wet Flue Gas Desulfurization System (FGD) Up to 99.5% removal Mercury Removal Significant mercury removal with combined AQCS equipment

5 Longview Steam Turbine & Generator Thermal Energy Mechanical Energy Electrical Energy (Boiler) (Steam Turbine) (Generator) Siemens HMNN 770 MW Turbine System Tandem Compound Design: 1x single flow HP, 1 x double flow IP, 2 x double flow LP Sections Inlet steam conditions 3600 psi, 1050F 5,027,000 lbs/hr of steam flow @ VWO Siemens Model # SGen6-3000W Generator Rated for 807MW/hr Directly coupled to the turbine Hydrogen inner cooling Water-cooled stator winding Up to 99% operating efficiency

6 Best in Class Technology Longview is the most efficient coal-fired unit in PJM market. Longview Power 8,750 Btu/KWh (39%)

7 PJM Dispatch Curve (Marginal Cost of Dispatch by Unit) Longview is among the lowest cost generators in PJM

8 Longview Air Emissions Longview has the lowest coal plant emissions in West Virginia. 6.000 Permitted PM, NOx and SO2 Emissions Lbs per MMBtu NOx lb/MMBtu 5.000 SO2 lb/MMBtu PM lb/MMBtu 4.000 3.000 2.000 1.000 0.000 Source: Facility Operating and Acid Rain Permits

9 Longview Rehabilitation –Challenge RELIABILITY OPERATION’s Low Reliability Capacity Factor in the 60% range Frequent forced outage events Large number of derate hours Unnecessary unit trips and runbacks High O&M Costs Frequent tube leaks and other equipment failures Heavy slag fall damage Aggressive erosion Inefficient use of consumables O&M Operational Challenges Lack of stability and controllability Excessive alarming Constant operator(s) intervention

10 Longview Rehabilitation – Solution Engineering & Analysis Detailed root cause analysis Exhaustive modeling and testing Collaborative partnerships with OEM’s Innovative use of new technology Planning Detailed planning and project integration Staff augmentation in key areas Detailed risk analysis and mitigation strategies Innovative contracting strategies to ensure alignment of objectives & priorities Execution Full integration of entire plant staff Staff augmentation in key areas ENGINEERING PLANNING EXECUTION

11 Longview Rehabilitation - Scope Rehabilitation Component Evaporator Bottom Ash System Combustion System SCR/Ammonia System Scope Header - header arch, screen tubes, front wall panels replacement; tube material from T23 to T12/T22, optimized furnace fluid side controls Enlarge hopper, reconfigure conveyor, improve seal skirt, increase fill/drain piping New air flow sensors, increased O2 grid resolution, new CO instrumentation, new automatic windbox flow balancing logic, extensive testing/tuning Replaced catalyst, modify in-duct heat exchangers, recommission NH3 delivery system, replace NOx instrumentation, incorporate new control logic Economizer Replace 450 eroded tube bends, alter biasing damper operation to reduce erosion Pulverizers Install new airport design, coal flow distribution devices, extensive test/tuning effort Op Enhancements Install intelligent sootblowing and acoustic leak detection systems Generator Repair causes of vibration and hydrogen leakage Install additional dual flow tray, lower air spargers, add spargers, new hydroclones, add filter feed pumps, piping and tank, add a decant basin Distributed Control System Replace entire 12,000 point DCS with Emerson Ovation system and validate new (DCS) hardware and software, train operators Expand PJFF by 30% to reduce dP, add ID fan isolation, increase ash handling Pulse Jet Fabric Filter (PJFF) capability Flue Gas Desulfurization

12 Longview Rehabilitation - Results Component Nose and Front Wall Bottom Ash System Combustion System SCR/Ammonia System Results No more tube leaks, max tube temps 20-30% lower; improved slag shedding; heat flux within design 50% improvement in startup times; exceptional tolerance to heavy ash/slag loading Best in class control capability with significant improvements in performance: CO ( 70%); boiler efficiency ( ); excess air ( 2%); LOI 2.0% Reliability issues eliminated with 15% improvement in NOx removal; 90% improvement in NH3 Slip; reliable performance Economizer Aggressive erosion is gone Pulverizers Mill performance is now best in class: 75% improvement in fuel & air pipe-to-pipe distribution. Test Results: Fineness 80%; air & fuel pipe-to-pipe deviation 10% Generator Vibration and Hydrogen leakage is at levels typical of new units Flue Gas Desulfurization Capable of SO2 removal rates are at or above 99.5% Best in class performance Digital Control System Full control of plant with state of the art system. All past issues from prior controls have been eliminated Pulse Jet Fabric Filter (PJFF) PJFF addition under construction (early November completion)

13 Longview Current Plant Performance Based on July 2015 Performance Test Boiler Efficiency 90% CO (lb/MM Btu) 0.03 (Permit 0.11) NOx (lb/MM Btu) 0.055 (Permit 0.065) Slip (ppm, 3% O2) 0.1 (Guarantee 2.0) Current Other Emissions SO2 (lb/MM Btu) 0.07 (Permit 0.095) Mercury (lb/GWHr) 0.0031 (Permit 0.013) Current Heat Rate (HHV) 8750 Btu/KWh ( 39% Eff) * without PJFF expansion Current Capacity Factor 97% * September operation

14 Conclusion Longview had significant challenges – they are now remedied The rehabilitation results are best in class performance with: Superior cost competitiveness Best in class heat rate Small environmental footprint Efficient use of natural resources Longview substantially demonstrates what modern coal-fired plant design and operation can do for clean coal power production Longview will be a viable power generator for years to come and a model of clean coal and environmental stewardship

15 THANK YOU

778 MW gross (700 MW net) coal fired plant Located near Morgantown , WV Total project cost was approximately 2.0B Primarily owned by major private equity firms Commenced operations in December 2011 Longview Power Overview . 2 Mine mouth coal provided by conveyor Lowest cost generator of any coal plant in region

Related Documents:

Longview, TX Store # 3828 4006 Estes Parkway Longview . KODAK BLVD. HUNTSMAN WAY S T A T E H W Y. N o. 1 4 9 ESTES DRIVE T.L.E. STRIPING DETAIL. KODAK BLVD. HUNTSMAN WAY S T A T E H W Y. Remove surface vegetation, topsoil, debris, root systems, organic material, asphalt and gravel, exist ing N o. . Longview

STATE OF WASHINGTON GOVERNOR'S OMMITTEE ON DISA ILITY ISSUES AND EMPLOYMENT Employment Security Department P.O. Box 9046 MS: 6000 Olympia, Washington 98507-9046 Olympia (360) 902-9511 Fax (360) 586-4600 Spokane (509) 482-3854 Photo 1: Longview sign Kelso/Longview, Washington

Longview Fibre Paper and Packaging, Inc/KapStone Kraft - Longview 2020 EITE stationary source McCain Foods - Othello 2023 EITE stationary source Northwest Pipeline C/S - Sumas 2029 stationary source Nucor Steel Seattle, Inc, - Seattle 2020 EITE stationary source NW Natural - Washington -

Northwest District. Clean Marina Program. Clean & Resilient Marinas. Clean Vessel Act . Jeanne Williams. Clean Marina Coordinator. November 1, 2017

to engage with people from many cultures and countries. They will need these to be responsible citizens and effective participants in the global marketplace of the 21st century. Few teachers today are well prepared to educate students for this new global context. The Longview Fo

structures of small apparent offset cross strike at several locations. Dip of the barite is 10 to 25 to the southeast. True width of the bodies (the least certain dimension) is estimated to be 160 to 200 m for Longview and 220 to 260 m for Lakeview. The two bodies contain a minimum of 4.5 million metric tons of barite and more than 38 million

Rhonda Rollyson, SM Longview & Longview Village, Wytheville, VA Lindsay Arnold, Resident Activities Administrator Rodger Gardner, MC Nugget Ridge, Christiansburg, VA Mike Sowers, MC Crestview, Christiansburg, VA Susan Elliott, Senior Regional Property Manager Meghan Ca

Anatomi dan Fisiologi Sistem Muskuloskeletal 2.1.1. Sistem Otot (Muscular System) 2.1.1.1. Otot (Musculus) 2.1.1.1.1. Definisi Otot adalah sebuah jaringan yang terbentuk dari sekumpulan sel-sel yang berfungsi sebagai alat gerak. Jaringan otot sekitar 40% dari berat tubuh. Otot melakukan semua gerakan tubuh. Otot mempunyai sel-sel yang tipis dan panjang yang mengubah energi yang tersimpan dalam .