EM–22 1GR-FE ENGINE MECHANICAL – TIMING CHAIN

3y ago
58 Views
1 Downloads
666.28 KB
5 Pages
Last View : 2m ago
Last Download : 3m ago
Upload by : Julia Hutchens
Transcription

EM–221GR-FE ENGINE MECHANICAL – TIMING CHAINREMOVALEM1.REMOVE BATTERY2.DRAIN ENGINE COOLANT (See page CO-3)3.DRAIN ENGINE OIL (See page LU-4)4.REMOVE POWER STEERING LINK ASSEMBLY (for2WD)Refer to the procedures up to "REMOVE POWERSTEERING LINK ASSEMBLY" (See page PS-18).5.REMOVE POWER STEERING LINK ASSEMBLY (for4WD)Refer to the procedures up to "REMOVE POWERSTEERING LINK ASSEMBLY" (See page PS-37).6.REMOVE FRONT DIFFERENTIAL CARRIERASSEMBLY (for 4WD)Refer to the procedures up to "REMOVE FRONTDIFFERENTIAL CARRIER ASSEMBLY" (See page DF20).7.REMOVE FANRefer to the procedures up to "REMOVE FAN PULLEY"(See page CO-17).8.REMOVE GENERATOR ASSEMBLYRefer to the procedures up to "REMOVE GENERATORASSEMBLY" (See page CH-9)9.SEPARATE COOLER COMPRESSOR ASSEMBLY(See page ES-420)10. REMOVE V-RIBBED BELT TENSIONER ASSEMBLY(a) Remove the 5 bolts, then remove the V-ribbed belttensioner.11. REMOVE OIL LEVEL GAUGE GUIDE(a) Remove the oil level gauge.(b) Remove the bolt and pull out the oil level gaugeguide.(c) Remove the O-ring from the oil level gauge guide.A076445E0112. SEPARATE VANE PUMP ASSEMBLY(a) Disconnect the power steering pressure switchconnector.(b) Remove the 2 bolts, then separate the vane pump.NOTICE:Do not hit the pulley with other parts whenseparating the vane pump.HINT:The vane pump is suspended securely.A076444

1GR-FE ENGINE MECHANICAL – TIMING CHAINEM–2313. REMOVE NO. 2 IDLER PULLEY SUB-ASSEMBLY(a) Remove the 2 bolts, then remove the No. 2 idlerpulleys.A076338E0114. REMOVE NO. 1 IDLER PULLEY SUB-ASSEMBLY(a) Remove the bolt, then remove the No. 1 idler pulley.EM“DOUBLE”A076438E0115. REMOVE CRANKSHAFT PULLEY(a) Using SST, hold the crankshaft pulley and loosenthe pulley set bolt.SST 09213-54015 (91651-60855), 09330-00021SSTA072947E02(b) Using the pulley set bolt and SST, remove thecrankshaft pulley.SST 09950-50013 (09951-05010, 09952-05010,09953-05020, 09954-05030)SSTA072948E0116. REMOVE NO. 2 OIL PAN SUB-ASSEMBLY(a) Remove the 10 bolts and 2 nuts.A072949E01

EM–241GR-FE ENGINE MECHANICAL – TIMING CHAIN(b) Insert the blade of SST between the oil pan and No.2 oil pan, cut off applied sealer and remove the No.2 oil pan.SST 09032-00100NOTICE: Be careful not to damage the contactsurfaces of the oil pan and No. 2 oil pan. Be careful not to damage the No. 2 oil panflange.SSTA072950E0217. REMOVE OIL STRAINER SUB-ASSEMBLY(a) Remove the 2 nuts, then remove the oil strainer andgasket.EMA072951E01Flywheel HousingUnder Cover18. REMOVE OIL PAN SUB-ASSEMBLY(a) Remove the 4 housing bolts.(b) Remove the flywheel housing under cover.A076446E01(c) Remove the 17 bolts and 2 nuts.A072952E01(d) Using a screwdriver, remove the oil pan by pryingbetween the oil pan and cylinder block.NOTICE:Be careful not to damage the contact surfaces ofthe cylinder block and oil pan.(e) Remove the O-ring from the oil pump.19. REMOVE AIR CLEANER ASSEMBLY (See page ES429)PryG036806E0120. REMOVE THROTTLE BODY BRACKET (See pageFU-11)

1GR-FE ENGINE MECHANICAL – TIMING CHAINEM–2521. REMOVE OIL BAFFLE PLATE (See page FU-11)22. REMOVE NO. 1 SURGE TANK STAY (See page FU-11)23. REMOVE NO. 2 SURGE TANK STAY (See page FU-12)24. REMOVE INTAKE AIR SURGE TANK (See page FU12)25. REMOVE IGNITION COIL ASSEMBLY (See page IG-8)26. REMOVE CAMSHAFT TIMING OIL CONTROL VALVEASSEMBLY (See page ES-414)27. REMOVE VVT SENSOR (See page ES-417)28. REMOVE WATER INLET (See page CO-8)29. REMOVE CYLINDER HEAD COVER SUB-ASSEMBLY(See page EM-40)30. REMOVE CYLINDER HEAD COVER SUB-ASSEMBLYLH (See page EM-40)31. REMOVE TIMING CHAIN OR BELT COVER SUBASSEMBLY(a) Remove the 24 bolts and 2 nuts.G036303E01(b) Remove the timing chain cover by prying betweenthe timing chain cover, cylinder head or cylinderblock with a screwdriver.NOTICE:Be careful not to damage the contact surfaces ofthe timing chain cover, cylinder block andcylinder head.(c) Remove the O-ring from the LH cylinder head.32. REMOVE TIMING GEAR CASE OR TIMING CHAINCASE OIL SEAL (See page EM-163)G036304E01EM

EM–261GR-FE ENGINE MECHANICAL – TIMING CHAINTiming Line33. SET NO. 1 COMPRESSION TO TDC/COMPRESSION(a) Using the crankshaft pulley set bolt, turn thecrankshaft to align the crankshaft set key with thetiming line of the cylinder block.Set KeyA076450E02Bank 1:Timing MarksEMBank 2:(b) Check that the timing marks of the camshaft timinggears are aligned with the timing marks of thebearing caps as shown in the illustration.If not, turn the crankshaft 1 complete revolution(360 ) and align the timing marks as above.34. REMOVE NO. 1 CHAIN TENSIONER ASSEMBLYNOTICE: Never rotate the crankshaft with the chaintensioner removed. When rotating the camshaft with the timing chainremoved, rotate the crankshaft counterclockwise40 from the TDC first.Timing MarksTiming MarksG036290E06PushStopper PlateStopper PlateA072958E02(a) While turning the stopper plate of the tensionerupward, push in the plunger of the chain tensioneras shown in the illustration.(b) While turning the stopper plate of the tensionerdownward, insert a bar of φ 3.5 mm (0.138) into theholes in the stopper plate and tensioner to fix thestopper plate.(c) Remove the 2 bolts, then remove the chaintensioner.35. REMOVE CHAIN TENSIONER SLIPPER36. REMOVE IDLE SPROCKET ASSEMBLY(a) Using a 10 mm hexagon wrench, remove the No. 2idle gear shaft, No. 1 idle gear and No. 1 idle gearshaft.37. REMOVE NO. 2 CHAIN VIBRATION DAMPER(a) Remove the 2 No. 2 chain vibration dampers.38. REMOVE CHAIN SUB-ASSEMBLYA072959E01

25. remove ignition coil assembly (see page ig-8) 26. remove camshaft timing oil control valve assembly (see page es-414) 27. remove vvt sensor (see page es-417) 28. remove water inlet (see page co-8) 29. remove cylinder head cover sub-assembly (see page em-40) 30. remove cylinder head cover sub-assembly lh (see page em-40) 31.

Related Documents:

1.Engine Oil SABA 13 1.Engine Oil 8000 14 1.Engine Oil 6000 15 1.Engine Oil 3000 16 1.Engine Oil Alvand 17 1.Engine Oil Motor Cycle Engine Oil M-150 18 1.Engine Oil M-100 19 1.Engine Oil Gas Engine Oil CNG-BUS 20 1.Engine Oil G.I.C.X.LA 21 1.Engine Oil G.I.C.X. 22 1.Engine Oil Diesel Engine Oil Power 23 1.Engine Oil Top Engine 24

em-8 1gr-fe engine mechanical - valve clearance em valve clearance adjustment 1. disconnect cable from negative battery terminal 2. drain engine coolant (see page co-3) 3. remove v-bank cover (see page es-428)

A group of diagnostic trouble codes that are output by ECM based on same malfunction . ES–4 1GR-FE ENGINE CONTROL SYSTEM – SFI SYSTEM ES IGNITION COIL VVT SENSOR (BANK 1) VVT SENSOR (BANK 2) CAMSHAFT TIMING OIL CONTROL VALVE (BANK 2) . VVT OCV (Bank 1) VVT OCV (Bank 2) Knock Sensor (Bank

EM-28 1GR-FE ENGINE MECHANICAL - TIMING CHAIN EM (b) Align the yellow mark link with the timing mark of the crankshaft timing link. (c) Align the orange mark links with the timing marks of the camshaft timing gears, and install the chain. 4. INSTALL NO. 2 CHAIN VIBRATION DAMPER (a) Install the 2 No. 2 chain vibration dampers. 5.

1gr-fe fuel – fuel injector fu–11 fu removal 1. discharge fuel system pressure (see page fu-1) 2. disconnect cable from negative battery terminal 3. drain engine coolant (see page co-3) 4. remove v-bank cover (see page es-428) 5. remove air cleaner a

The Aircraft Engine Design Project Fundamentals of Engine Cycles Ken Gould Spring 2009 Phil Weed 1. g GE Aviation Technical History GE Aircraft Engines U.S. jet engine U.S. turboprop engine Vibl tt iVariable stator engine Mach 2 fighter engine Mach 3 bomber engine High bypass engine

ESL15521 Engine Plug Kit Oversized 1 1 1 1 K ESL15522 Engine Overhauling Kit 545-010 1 1 ESL15523 Engine Overhauling Kit 545-020 1 1 ESL15530 Engine Overhauling Kit 545"()30 1 1 ESL15531 Engine Overhauling Kit 555-010 1 1 ESL15532 Engine Overhauling Kit 555-020 1 1 ESL15533 Engine Overhauling Kit 555-030 1 1 Note: Content of Service Kits Section 1:2 14,15,30

37 Engine Control #5 38 Engine Control #6 39 Machine Control Module 40 Engine Control #7 41 Engine Control #8 42 Engine Control #9 43 Engine Control #10 47 Backup Engine Control 49 VIMS Main Module 50 VIMS Analysis Module 51 VIDS Main Module 52 Graphical Display Module #2 D6R Track-Type Tractor 9PN00001-UP (MACHINE) POWERED BY 3306 Engine(SEB .