MONTHLY PROGRESS REPORTMonth‐ May‐2016Name of Project- 2x1.125 MW Pilangad SHPS.No.Project componentsUnitQty. to be executedas per BOQUp to date progresstill this MonthThis Month'sProgress1Diversion Weir & IntakeA.Civil WorksaExcavation in SMBm32740NILNILbExcavation in Hard NILcDewateringJob1NILNILJob1NILNILdRiver diversionB.Hydro‐Mechnical WorksaM.S. Work (Trash Rack)MT35.527NILNILbM.S. GatesMT8.95NILNILRM25NILNILc500 mm dia MS pipe2Desilting Tank & Power ductA.Civil WorksaExcavation in SMBm31429NILNILbExcavation in Hard LB.Hydro‐Mechnical Worksa400 mm dia MS pipeRM20NILNIL3Power Channel & itsProtectionA.Civil WorksaExcavation in SMBm3128027040bExcavation in Hard Rockm31280NILNILcP.C.C. M10m31952222dP.C.C. M15m37688024eR.C.C.m31599NILNILfPlum concretem3280417180gR:R 1:6m31701470173hR:R drym3370914030iDismantling of old plasterSqm208054.2NILB.Hydro‐Mechnical WorksaM.S. WorkMT3.69NILNIL25NILNILNILNILbM.S. Gates4TRC & its Protection workA.Civil WorksaExcavation in SMBm3471NILNILbExcavation in Hard ‐Mechnical WorksaTRC pipe 02 Nos 900 mm dia & 8 RMmm thickBottle Necks1.Only protection work is beingdone by the firm.2.Only 2 Mixture machine andone vibrator is Available at site.3. 80 Labours are Present at sitein this month.4. NoEngineer has Posted at site.5. Construction Schedule is yetto be Submitted.

Name of Project2x2.5 MW Suringad-II SHPProgress as on 31/05/2016S.No.Project ng tankExcavationM-10M-25M-25INTAKE CHANNEL & PowerChannelProgress in running meterExcavationLiningProgress in QuantumExcavationPCC M-10RCCR:R 1:6R:R dryForebayExcavationR:R 1:6R:R dryPCC M-10RCC M-25PenstockFabrication (in r.m)Construction of anchor/saddle blockbcdeErection of Y-JunctionErection of penstock (r.m)As peragreement/DesignWork executedupto theaforesaid date,cub mProgress inlast onemonth,cub m5000 m3560 m31000 m3115 m34420 m3400 m3300 m372 m3100 m395 m3-1430 m350 m3100 m3200 m3450 m3--1065 m1065 m1065 m865 m400 m120 m3280 m3350 m31450 m31000 m3750 m319610 m3221.7 m3460 m31038 m3468 m3138 m3-950m3150 m320 m3120 m3400 m3958.39 m3128 m313 m3130 m3406 m3830 m1965 m3785 m7851 no830 m--85 m15 m1700 m3--30 m3Remark-30 m38 mm-192.5 m, 12 mm-228m, 16 mm- 154.5, 20 mm102 m, 20 mm-108 mreached site.fPower HouseExcavationConcretePhysical StatusgApproach roadExcavationConcreteR:R 1:6R:R dryhSupply/ErectionofE&MEquipments1 Draft TubeEOT Crane23 Spiral Casing4 Turbine/Runner5 Generator6 Control Panels6.1 SCADA6.2 Generator relay and metering panel24330 m31700 m36737 m3421.89 m31370.77 m32056.15 m3Workofspreadingprogress.7994 m396.21 m31600 m3672 m31 No.2 Sets.2 Sets.1 No.2 No.6.3 Generator LAVT panel2 No.6.4 Transrormer protection relay2 No.6.5 Line relay and metering panel2 No.6.61 Sets.Manual and AutomaticSynchronizing Equipment and Panel2 No7 Tranformer8 Power Evacuation system8.1 33 KV Switchyard8.2 33 KV Transmission Line06 Km(approx.)------------providingWBMis&inN.A.Work of design & drawing inprogress.N.A.Work of design & drawing inprogress.

PROGRESS REPORT2x0.75 MW DunaoSHPName of ProjectProgress as on 31/05/2016S.No.1 (A)UnitAs peragreement/DesignWorkexecutedupto .3549.28835-Work in 707-Work CompletedCumCum377446903.0084624.925510.71-Work 163514RMNo.RM1921192124160-Erection of Penstock is under progressand 60m penstock has been laid.CumCum337.951644.89694.001425.70-Work in ProgressProject componentsProgress inlast monthRemarkHead, Diversion & IntakeChamberInstallation work of Spillway gate,Intake Gates and stop log assembly isin progress. Construction Work isunder progress.1(B)De-silting tankExcavationConcrete2Power DuctProgress in running meterExcavationConcrete3Power ChannelProgress in QuantumExcavationConcrete4(A) ForebayExcavationConcreteBell MouthExpension Joints (1200mm Dia)4(B) PenstockFabrication (in r.m)Erection of Y-JunctionErection of penstock (r.m)5Power HouseExcavationConcretePhysical StatusSupply/ErectionofE&M6Equipments6(a Draft Tube6(b HOT Crane6(c Spiral Casing6(d Turbine/Runner6(e Generator6(f Control PanelsGeneratorandGenerator6(f1 Transformer control, protection &Metering panelTransrormer and Line relay and6(f2metering simplex panel (TLRMP)ManualandAutomatic6(f3 SynchronizingEquipmentandPanel6(f4 Generator LAVT panel6(g Tranformer6(h Power Evacuation system6(h1 11 KV Switchyard6(h2 11 KV Transmission LineHindrancesWork in progress.Installed95% CompletedSetsNo.SetsSetsSets2122221222-Supplied at SiteSupplied at SiteSupplied at SiteSupplied at SiteSupplied at Site-No.2---No.1---No.1---No.No.21---5 days due to rain-Erection completed

Detailed Progress of SHPs - Under Construction (Civil & HM Works) Madhyamaheshwar (3x5 MW) HEPProgress during Month MAY 2016Progress duringQuantity TotalSl ntityachieved tua In RsActuas For lessQuarterSched l / Sched l / Crore In (%)Progress IfTargetsule Antici ule Anticianypatedpated2456789101112131415161713Name of Work:‐ “Construction of Civil & Hydroelectric works of Forebay, Penstock, anchor & saddle block and allied works, Powerhouse, Switch yard, TRC, approach road andFlood Protection works of Madhyamaheswar SHP (3X5MW) in District Rudraprayag.”F ForebayExcavation1Nil465.00 Cum23G123(a)(b)4(a)(b)(c)(d)Concrete954.00 CumSupply, Fixing &1.00 Nos.Erection of BellmouthPenstockExcavation for300.00 Cumroad crossingConcrete for300.00 CumRoad CrossingConstruction ofBlocksAnchor/Thrust12.00 NosBlockSaddle Block50.00 NosPenstock pipeFabrication of500.00 RmPenstock pipeErection of500.00 RmPenstock pipeSupply,Fabrication &Erection ofExpansion JointsSupply,Fabrication &Erection ofTrifurcation5Protection Work(a)(b)RR 1:6Plum ConcretePower House,Switch Yard,&TRCExcavationConcrete workH12ab34(a)(b)56RCC in Raft workRCC in Beam &ColumnBrick WorkRoofingRoof SheetTrussFlooringMisc. Works(Door/Window/Ceiling etc.)7Protection WorkabExcavationConcrete workPlum Concrete &Wire CrateHP stone fillingcdJ123(a)(b)(C)Approach Roadof Power HouseCutting &ExcavationConcreteProtection workRR 1:6 & RR DryPlum Concrete &Wire CrateH.P.Stone fillingNilNilNilNilNilNilNilNil6.00 NosNil1.00 NosNil450.00 Cum150.00 CumNilNil8476.00 CumNil1306.00 CumNil588.00 CumNil270.00 CumNil900.00 Sqm18.00 Nos800.00 SqmNilNilNil1.00 JobNil2624.00 Cum1663.00 Cum500.00Nil267.79332.82767.79332.821694.00 CumNil471.9471.9440.00 CumNilNilNil3432.00 Cum6000.00Nil65.00 Cum4.10394.00 Cum310.001110.00 Nil737.97300

Name of Work: Construction of remaining civil works of Tunnel, Adit, power channel & Escape work of Madhyamaheswar SHP (3X5MW) in District RudraprayagAgreement No- 13/GM(SHP)/2015-16Progress during Month MAY 2016ExpenditureCumulativeProgress during progress of yearincurred tillSchedulecurrent quarter Up to end ofDateNextCumulative(As rgettill dateActual/Actual / In Rs In (%)RevisedTarget Actual Target actualScheduScheduAnticipAnticip CroresleleatedatedQuantity TotalSlNo.Activity eAnchor blockSaddle blockS/F/E of escape pipeS/F/E of BendsTunnelMuck/RBM Clearance1360.00 CumNil517.00 CumNil11.00 NosNil15.00 NosNil200.00 RmNil11.00 NosNil2839.00 Cum4533.00Nil2201.00Nil1150.00NilWidening of3840.00 Cumtunnel/removing ofMucking ofCumcavity(Loose)Underground excavation2800.00 R.min tunnelConcrete15472.00 CumSupply of steel RibErection of steel Rib8350.16250.00 M.T8.836250.00 9.613Remarks/ConstraintsFor lessProgress If any

Progress during Month MAY 201612/GM (SHP)/2015-16Agreement noName of Work: Construction of Remaining Civil & Hydro Mechanical works of Weir, Intake, Under sluice, Power duct, Feeder tunnel and Desilting Tank of Madhyamaheswar SHP(3X5MW) in District Rudraprayag.Quantity TotalSlNo.Activity ParticularsOriginal1A2Diversion weirincluding Intake &Shingle Excluder1River Diversion work234ExcavationConcrete35.00 dRevisedtill 37.103NilNilUnder Sluice GatesS/F & Erection of1.00 JobHoisting arrangementsNil5Stoplog Gate forUnder Sluice GatesSupply & Fabrication 1.00 Nos.NilInstallation of gate 1.00 Nos.NilIntake Gate(a)Supply & Fabrication 3.00 Nos.Nil(b)Installation of gate 3.00 Nos.Nil(c)S/F & Erection of1.00 JobHoisting arrangementsNil7Stoplog Gate forIntake GateSupply & Fabrication 1.00 Nos.NilInstallation of gates 1.00 Nos.NilProtection Work300.00Cum8000.00(b)Plum ConcreteCumB Power Duct2580.001ExcavationCum709.002ConcreteCum3 Plum ConcreteC Desilting Tank7327.001 ExcavationCum4682.002ConcreteCumSupply & Febrication9.00 Nos3 of GatesSupply & Installation9.00 Nos4 of GatesProtection Work (RR1165.005work)CumApproach Road ofDWeirRR 1:6 & RR Dry16612.00ExcavationCum.66.00 Cum2 Concrete3 Protection workRR 1:6 & RR Dry 302.00 Cum(a)Plum Concrete & Wire4568.00 lation of gates 2.00 Nos.(b)Target30686(b)(a)Actual1Nil6TargetNilSupply & Fabrication 2.00 Nos.(b)Cumulativeprogress upto thismonth1(a)(a)Progress duringcurrent 00Nil452.251104.3Expenditureincurred till Date Remarks/Next(As per Agreement ConstrainQuarterts For lessstartCompletionTargetProgressIn RsActual /Actual /In (%)If anySchedule Anticipat Schedule Anticipat Croreseded1011121314151617Schedule

UJVN LimitedDetailed Progress of SHPs - Under Construction (Civil Works) KALIGANGA-II SHP (2X2.25) MWProgress during the Month MAY 2016Sl 34D123E12Activity ParticularsQuantity Total Cumula Progress l ReviseTarget Actual Target actual QuarterIn RsIn (%)startCompletionQuantitTarget Schedu Actual / Schedu Actual / CroresdyleAnticip rsion weir includingIntake & Shingle ExcluderRiver Diversion work (Job)3.00Excavation (Cum)11527.50Concrete (Cum)1712.44Plum Concrete (Cum)423.00Under Sluice GatesSupply & Fabrication (Nos)2.00Installation of gates (Nos)2.00S/F & Erection of Hoisting1.00arrangements (Job)Stoplog Gate for Under SluiceGatesSupply & Fabrication (Nos)1.00Installation of gate (Nos)1.00Intake GateSupply & Fabrication (Nos)1.00Installation of gate (Nos)1.00S/F & Erection of Hoisting1.00arrangements (Job)Stoplog Gate for Intake GateSupply & Fabrication (Nos)1.00Installation of gates (Nos)1.00Power DuctExcavation (Cum)1610.00Concrete (Cum)196.72Plum Concrete (Cum)79.00Desilting Tank7775.00Excavation (Cum)Concrete (Cum)258.22Plum Concrete (Cum)53.20Supply & Installation of Sluice6.00valve 450 mm Dia (Nos)Power Channel322.00Excavation (Cum)32.94Concrete (Cum)Plum Concrete (Cum)87.00TunnelMuck/RBM Clearance (Cum)5486.00Underground excavation in842.00tunnel (RM) (Total 2002 m)(i) Inlet face (already excavated518m)54 00Remarks/ Constraints For lessProgress If inst agreement no.09/GM(SHP)/2015-16 dt.18.11.2015i) Construction Works of weir siteshall be start after the constructionof Approach Road to weir site.Construction work of ApproachRoad about 1220 m out of 2250 mhas been constructed towardsKaliganga-I Power House/Kaliganga-II Weir nst Agreement no.02/GM(SHP) /2016-17 dated04.04.2016(i) Inlet tunnel RBM clearence workshall be started after construction ofAh KG II W i i

(ii) Adit U/s (Al. excavated278m)(iii) Adit D/s (Al. excavated226m)(iv) Outlet Face (Al. excavated138)Concrete(Cum)Forebay/EscapeExcavation (Cum)Concrete (Cum)Supply, Fixing & Erection of Bellmouth (No)3F123456GAnchor block (Nos)Saddle Block (Nos)S/F/E of escape pipe (RM)PenstockExcavation for road crossing(Cum)Concrete for Road CrossingConstruction of BlocksAnchor/Thrust Block (Nos)Saddle Block (Nos)Penstock pipeFabrication of Penstock pipe(RM)123(a)(b)4(a)(b)Erection of Penstock pipe (RM)Fabrication & Erection ofExpansion Joint (Nos)Fabrication & Erection of YPiece (Nos)Power House, Switch Yard &TRC(c)(d)H12Excavation (Cum)Concrete worka RCC in Raft work (Cum)b34(a)(b)56I1234RCC in Beam & Column (Cum)Brick Work (Cum)RoofingRoof Sheet (Sqm)Truss (Nos)Flooring (Sqm)Misc. Work (Job)Flood Protection WorksExcavation (Cum)Concrete (Cum)Plum Concrete (Cum)Random Rubble StoneMasonry 00697.00421.001350.00129.00150659.00ii)Dewatering work of Tunnel fromAdit side has been started and workis on Progress, Exacvation of AditU/s and D/s Face planned to bestrat in next week.ii) Protection work of approcah toOutlet face is on progress.Nil350.0085.00225.00Approach to KG-II Weir site.NilNilAgainst Agreement no.08/GM(SHP) /2015-16 dated18.11.2015.i) Flood Protection Retaining Wallwork has been started in the lastweek of april-2016 and work is onprogress.

5J1ab234(a)(b)Boulder wire crates (Cum)338.00NilCutting & Excavation (Cum)Approach road to Weir site (m)Excavation onlyApproach road to Power Housesite (m) Excavation onlyConcrete (Cum)3466.003694.12250.001250150.0015077.05NilPlum Concrete (Cum)Protection work148.00538.20RR 1:6 & RR Dry (Cum)952.001016.50Boulder apron wire crates(Cum)338.001802.25Approach RoadsAgainst agreement no.09/GM(SHP)/2015-16 dated18.11.2015(i)Construction work of ApproachRoad about 1250 m out of 2250 mhas been constructed towardsKaliganga-II Weir site and the workis on progress.(ii) About 150 m approach road atKG-II Power House site has beenexcavated and the protection workof approach road is on progress

UJVN LimitedDetailed Progress of SHPs - Under Construction (Civil Works) KALIGANGA-I SHP (2X2) MWProgress during MonthSl No.1A12345(a)(b)(c)Activity Particulars2Diversion weir including Intake &Shingle ExcluderRiver Diversion work (Job)Excavation (Cum)Concrete (Cum)Plum Concrete (Cum)Under Sluice GatesSupply & Fabrication (Nos)Installation of gates (Nos)S/F & Erection of Hoistingarrangements (Job)6Stoplog Gate for Under Sluice Gates(a)(b)7(a)(b)Supply & Fabrication (Nos)Installation of gate (Nos)Intake GateSupply & Fabrication (Nos)Installation of gate (Nos)S/F & Erection of Hoistingarrangements (Job)Stoplog Gate for Intake GateSupply & Fabrication (Nos)Installation of gates (Nos)Power DuctExcavation (Cum)Concrete (Cum)Plum Concrete (Cum)Desilting TankExcavation (Cum)Concrete (Cum)Plum Concrete (Cum)Supply & Installation of Sluice valve450 mm Dia (Nos)Forebay (Miscellaneous)Excavation (Cum)Concrete (Cum)RR 1:6 & RR Dry (Cum)PenstockExcavation (Cum)Construction of BlocksAnchor/Thrust Block (Nos)Saddle Block (Nos)Penstock pipeFabrication of Penstock pipe (RM)Erection of Penstock pipe (RM)Fabrication & Erection of ExpansionJoint (Nos)Fabrication & Erection of )(c)(d)Quantity TotalOriginal Revised34CumulativeQuantityachieved 6.001.00Progress heduleQuarterstartCompletionTarget Schedul Actual /Schedule Actual /eAnticipatedAnticipated1011121314ExpenditureIn RsIn (%)Crores1516MAY 2016Remarks/ConstraintsFor lessProgress Ifany17AgainstAgreement no.01/GM(SHP)/2016-17 dated04.04 2016.i) Portectionwork at Powerduct/DesiltingTank has beenstated.NilNilAgainst

F1Power House, Switch Yard & TRCExcavation (Cum)Concrete worka RCC in Raft work (Cum)b RCC in Beam & Column (Cum)Brick Work (Cum)3Roofing4Roof Sheet (Sqm)(a)Truss (Nos)(b)Flooring (Sqm)5Plum Concrete (Cum)6G Flood Protection WorksExcavation (Cum)1Concrete (Cum)2Plum Concrete (Cum)3Random Rubble Stone Masonry4(Cum)Approach RoadsHCutting & Excavation (Cum)1Concrete (Cum)23Plum Concrete (Cum)4Protection work(a) RR 1:6 & RR Dry (Cum)(b) Boulder apron wire crates 1104.00NilNilgagreement no.03/GM(SHP)/2016-17 dated.28.04.2016i) NoConstructionwork has notbeen started tilldate.

MISUJVN LimitedDetailed Progress of SHPs - Under Construction (E/M Works)Month- MAY 2016SNParticularsName of WorkScheduleAgreemenDate ofDate oft Value (inStart commissioLacs)ningAgreementno.Status of ErectionExpenditureincurred tillDateStatus of(As perTesting &Agreementcommissiovalue)ningRemarks if anyIn Rs LacsDesign, Supply, InstallationSupply of E&M equipments andmachines, spares and tools1234Assiganga‐I SHP (4.5MW) Transportation, insurance anderection of E&M equipmentsDesign , Construction, Supply,Installation, Commissioning andSupervision of O&M of plant forOne(1) year ofAssiganga‐II SHP (4.5MW) (2x2250kW 155COL) AsigangaII SHPKaldigad SHP (9.0MW)Limchagad SHP (3.50MW)Design, Supply, Installation,commissioning and testing ofElectromechanical 04.200931.03.20132639.65More than 80% of the work wasMs/s Voith Hydro05/GM(SHP)/2008‐09 completed till the flash flood inyear 2012 that leads to completedated 18.07.2008damage of E&M equipments. Thecontract is alive and contractor isagreed to restart the work withMs/s Voith Hydrosome changes in contract.06/GM(SHP)/2008‐09dated 18.07.2008689 .0(excluding priceescalation)Contract is still alive & turbine ,M/s Avantikagenerator & other equipments hasContractors07/UJVNL/GM(SHP)/ been supplied by Contractor08-09 dated23.01.2009625.491. Bank Guaranty of the project has been expired9151.Contractor bill Rs. 26 lac is pending & spare of Rs. 47.5.lac2. Time extension is required03.12.200802.12.20101245.65M/s Boving Fouress Contract is still alive & Majority ofLtd (BFL)E&M equipments has been05/GM(SHP)/2008‐09 supplied by Contractordated 16.10.2008Design, Construction, Supply,18.06.2012Installation, Commissioning andO&M of Plant for 1 yearof(2x1000kW 15%COL) LimchgadSHP in distt. Uttarkashi.17.06.20142247.57M/s EnergyDevelopmentCompany Limited(JV)05/EE/EDD(SHP)/Limchagad/2011‐12 dated‐29.09.20111. Survey work has been completedby the firm , Revised drawings is yetto be provided2. Land casefor additional forest land for theproject is pending for the approvalof the project.28.91(excluding priceescalation)1. Bank guarantee of the contract has been expired andcontractor made proposal for Corporate Guarantee.Proposal of corporate guarantee has been submitted tothe board for consideration.2. Contractor bill amounting to Rs. 89.45 lac & 100 lacdue against pending bill & price escalation billrespectively. Further contractor has submitted claimamounting to Rs. 110 Lac due to project delay. 3.Retendering of civil works starts after closing the ongoingcivil contrcts.From the letter of Chief forest onservator(central) No‐8/UCP/03/44/2006/1757 dated 31.03.2014 addressed tochief Secretary(Forest),it was informed that s this projectcomes under the Gangotri Uttarkashi Eco‐sensitive Zoneso the permission for start the work should be takenfrom the Eco‐sensitive Zone monitoring committee.

56789Sawarigad SHP(2.00MW)18.06.2012Design, Construction, Supply,Installation, Commissioning andO&M of Plant for 1 yearof(2x1000kW 15%COL) SwarigadSHP in distt. Uttarkashi.31.03.20131481.25M/s KIDCO NACC (JV), EPC contract for execution of workexecuted with Contractor M/sKolkata.03/EE/EDD(SHP)/2010‐ KIDCO NACC (JV), Kolkata.11/SUWARIGADdated 16.05.10Complete supply ,erection ,commissioning & testing22.06.2012819 65M/s Hythro Power12/DGM (ADB‐Projects) dated01.07.201123.09.201133 kV Transmission LineAsiganga ValleyGangori SHP(800kW)Dunao SHP (1.5 MW)Supply parts almost completed bycontractor but erection &commissioning activities arepending. Contractor has left the sitemore than one year back.717NILRepairing & overhauling of11.04.20151125kW capacity machine Unit‐2of Pilangad SHP.31.12.20159.9M/s Fibretech, 314Tilak Park, SadarBazar, MerrutCatt.(U.P)04/EE(E&M)/SHP)/Maneri/14‐15 dt.07/02/2015Work in Progress. Work can befinalized after availability of waterfor machine. At present Civil workis in progressRenovation of Electrical works of 01.01.2009unit No‐1st, 2nd,3rd & 4th at4x200kW. Gangori SHP in Distt.Uttakashi.30.09.2009142.92M/s Fibretech, 314Tilak Park, SadarBazar, MerrutCatt.(U.P)14/EE(SHP)/2008‐09dated 16.12.2008The contract is to be closed. Boardhas given consent for abandoningthe project and closing existingcontract.Pilangad(2.5MW)Desin, manufacture, testing,supply, transit insurance, packingshipment, delivery to projectssite, complete erection, testing &commissioning of complete E&Mequipments and O&M of plantfor one (1) year at 2x750 KWDunao SHP.Validity of BG has been expired in 28.02.20131. Contractor has left the site with liabilities to many localcontractors & associates approx. amounting to Rs. 32 lac.Local people demanding their dues through UJVNL2. Notice to Perform has been issued by UJVNL &contract is to be terminatedContractor has requested for payment of pending billamounting to Rs. 11.81 lac & 21.00 Lac . Furthercontractor submitted claim for delay i work amounting toRs. 13.5 LacM/s Boom System Pvt Works under process.Ltd.29‐05‐1229‐03‐13time extension upto 31‐3‐2016 for completion of thework is in process403.22246.681011Kaliganga‐I (2x 2MW)Design, Supply, Installation,Commissioning and Testing ofElectromechanical Works of theKaliganga ‐I SHP (2X2 MW 15%COL) in District Rudraprayag02.03.16with one year Operation &MaintenanceDesign, Supply, Installation,Commissioning and Testing ofElectromechanical Works of theKaliganga ‐II SHP (2X2.25 MWKaliganga‐II (2x 2.25MW)02.03.16 15%COL) in District Rudraprayagwith one year Operation &Maintenance.Moblization advance given. Design drawing andFabrication works under progress.01.09.2018996.5M/s GoGoal Hydro Pvt Moblization advance given onLtd. Haridwar.02.03.201649.5Moblization advance given. Design drawing andFabrication works under progress.01.09.20181096.5M/s GoGoal Hydro Pvt Moblization advance given onLtd. Haridwar.02.03.201654.8

Madhyamaheswar(15MW)12Suringad‐II (5MW)13Design, Supply, Installation,Commissioning and Testing ofElectromechanical Works of theMadhyamaheshwar SHP (2X5MW 15%COL) in DistrictRudraprayag with one yearOperation & MaintenanceMoblization advance given. Design drawing andFabrication works under progress.01.4.2016Design, supply, installation,23.12.2014commissioning & testing of E&Mequipment of Suringad‐II SHP(2X2.5MW 10% COL) includingone year operation &maintenance.31.03.201922.12.2016M/s Flovel Energy PvtMoblization advance given on2369 Ltd., Faridabad,31.03.2016Haryana1060.27544 (including alltaxes)118.45M/s GoGoa;l HydroWorks under process.Pvt Ltd. Haridwar.01/DGM(SHP)/PTH/2013‐14 , 06.03.2014Moblization advance given. Design drawing andFabrication works under progress.106

MISUJVN LimitedSHPs - DPR Approved, Clearances Obtained/Under ProgressMonth-MAY 2016Sl.No.Name ofProjectStatus of Forest ClearanceDate ofapproval ofDPRPreparation Submissionof Land Caseto StateNodalAgency/MoEFStage -IClearanceCAT PlanUpladedObtained by DFO Awaitedin Dec 151Bhilangana07.09.2011IIA2Tankul SHPOct-153SonegadSHPAwaited Project under Gangotri eco sensitive zone.Oct-12Stage -IIClearanceLand case preparation under progress.Status ofotherStatutoryclearanceRemarks ifanyStatus of Investigations, If anyTenderReceipt ofBidsPlacementof OrderDate ofStartDate ofCompletion

MISUJVN LimitedSHPs- Under Survey & Investigation StageMonth- MAY 2016Sl.No.Name ofProjectDistrictCapacityStatus of Consultancy for Preparation of DPRStatus of Investigations, If anyInvitation Date ofof Tender Receiptof BidPlacement Date ofof Order StartExpectedDate angana -2BTehri24Oct-163Pilangad-IIUttarkashi4Non accessablity for survey due to dacalaration of Eco Sensitive Zone4Urgam-IIChamoli10Non accessablity for survey5PainagadPithoragrah9Capacity Enhansement is in progress. Capacity may increases form 9MW to 15 MW6Bhilangana t Placementof Bids of OrderDate ofDate ofStartCompletionRemarksifany

4 TRC & its Protection work NIL NIL A. Civil Works a Excavation in SMB m3 471 NIL NIL b Excavation in Hard Rock m3 350 NIL NIL c R.C.C. m3 100 NIL NIL B. Hydro‐Mechnical Works a TRC pipe 02 NIL NILNos 900 mm dia & 8 mm thick RM 20 MONTHLY PROGRESS REPORT Name of Project- 2x1.125 MW Pilangad

Related Documents:

XSEDE HPC Monthly Workshop Schedule January 21 HPC Monthly Workshop: OpenMP February 19-20 HPC Monthly Workshop: Big Data March 3 HPC Monthly Workshop: OpenACC April 7-8 HPC Monthly Workshop: Big Data May 5-6 HPC Monthly Workshop: MPI June 2-5 Summer Boot Camp August 4-5 HPC Monthly Workshop: Big Data September 1-2 HPC Monthly Workshop: MPI October 6-7 HPC Monthly Workshop: Big Data

average monthly income or net operating loss. Small Business Startup Eligibility Calculation Reduction in Average Monthly Income Net Operating Loss 1.2 X Average Monthly Income (Prior to March 1, 2020) Average Monthly Income (March 1, 2020 to August 31st 2020) Monthly Cash Flow ( ) Monthly Cash Flow (-) Monthly Cash Flow (-) Monthly Cash Flow ( )

January monthly files – March 15th February monthly files – April 15th March monthly files – May 15th April monthly files – June 15th May monthly files – July 15th June monthly files – August 15th July monthly files – September 15

Billings Clinic Cost Total Monthly Cost Billings Clinic Cost Total Monthly Semi-Monthly Monthly Monthly Semi-Monthly Monthly Monthly Cost Employee Only 99.45 198.90 419.52 618.42 128.01 256.02 415.75 671.77 Preventive Care The Billings Clinic medical plans cover in-network preventive care at 100%. This includes routine screenings and .

Monthly Progress Report Executive Summary 2-1 August 31, 2016 Rev 0 2.0 EXECUTIVE SUMMARY The Monthly Progress Report is intended to provide an overview of the PCEP and provide funding partners, stakeholders, and the public an overall update on the progress of the project. This document provides information on the scope, cost, funding, schedule,

At Your Name Name above All Names Your Name Namesake Blessed Be the Name I Will Change Your Name Hymns Something about That Name His Name Is Wonderful Precious Name He Knows My Name I Have Called You by Name Blessed Be the Name Glorify Thy Name All Hail the Power of Jesus’ Name Jesus Is the Sweetest Name I Know Take the Name of Jesus

Monthly progress report No. 5 2017 2 MONTHLY PROGRESS REPORT NO. 5 1.0.0 Project: Design and Construction of a Proposed New Medical Stores Warehouse, Chipata, Zambia 2.0.0 Project Data Participants 2.01 Employer: United National Development Programme (UNDP) 2.02 Benef

Peninsula Corridor Electrification Project Monthly Progress Report Executive Summary 2-1 April 30, 2018 2.0 EXECUTIVE SUMMARY The Monthly Progress Report is intended to provide an overview of the PCEP and provide funding partners, stakeholders, and the public an overall update on the