CPS SCA Series Grid-tied PV InverterCPS SCA20KTL-DO-R/US-480and SCA25KTL-DO-R/US-480Installation and Operation Manual - Rev 1.0CHINT POWER SYSTEMS AMERICA CO.Revision 1.0 - Sep 2019

Revision HistoryRev NumberChap/SecRev DateDescription1.0N/ASep 2019Initial Release

Table of ContentsBEFORE YOU START . 11. IMPORTANT SAFETY INSTRUCTIONS. 32. OVERVIEW . 102.1 INVERTER FOR GRID-TIED PV SYSTEMS . 102.2 PRODUCT FEATURES . 102.3 PRODUCT PROTECTION FUNCTIONS . 112.4 APPEARANCE AND MAIN ITEM DESCRIPTION . 122.5 SCHEMATIC DIAGRAM AND CIRCUIT DESIGN . 132.6 ANTI-ISLANDING DETECTION . 142.7 DC GROUND FAULT PROTECTION. 142.8 SURGE SUPPRESSION . 142.9 DC ARC-FAULT PROTECTION . 143. INSTALLATION . 153.1 RECOMMENDATIONS BEFORE INSTALLATION . 163.2 MECHANICAL INSTALLATION . 193.2.1DIMENSIONS. 193.2.2INSTALLATION METHOD (SEE FIGURE 3-2): . 193.2.3INSTALLATION SPACE REQUIREMENT . 213.2.4MOUNTING THE INVERTER ONTO THE BRACKET. 223.3 ELECTRICAL INSTALLATION. 283.3.1REMOVING/REPLACING THE WIRING BOX COVER: . 283.4 WIRING BOXES. 303.4.1DC CONNECTION . 313.4.2AC AND GROUND CONNECTION . 38

3.5 COMMUNICATION CONNECTION . 443.5.1DESCRIPTION OF THE COMMUNICATION BOARD . 453.5.2RS485 COMMUNICATION . 463.5.3RS485 NETWORK SET-UP.473.5.4COMMUNICATION WIRING. 483.5.5RSD CONNECTION . 494 COMMISSIONING (VIA WIRELESS ) . 504.1 APP DOWNLOAD . 504.2 COMMISSIONING CHECKLIST . 504.2.1MECHANICAL INSTALLATION . 504.2.2CABLE CONNECTIONS . 504.2.3ELECTRICAL CHECK . 514.3 COMMISSIONING STEPS . 514.4 CONNECTION TO THE INVERTER – WIRELESS . 515 APP INTERFACE . 565.1 OVERVIEW . 565.2 MAIN SECTION . 565.3 RUNNING DATA . 585.4 SETTINGS . 595.4.1INVERTER PARAMETERS . 605.4.2READ/WRITE REGISTER . 615.4.3COMMANDS . 625.4.4ENABLE/DISABLE . 645.4.5PROTECT . 715.4.6LVRT/HVRT . 775.4.7ACTIVEPOWERDERATING . 825.4.8REACTIVEPOWERDERATING . 85

5.4.9OTHERS . 915.5 FAULT RECORDING . 945.5.1FIRMWARE UPGRADE . 945.5.2UPGRADE THE INVERTER . 955.5.3UPGRADE THE LINKIT . 975.6 HISTORY . 975.7 TURN ON/OFF . 986 FAULT SHUTDOWN AND TROUBLESHOOTING .1006.1 LED FAULT AND TROUBLESHOOTING . 1006.2 FAULT AND TROUBLESHOOTING . 1017 MAINTENANCE AND DE-INSTALLATION .1107.1 PRODUCT MAINTENANCE . 1107.1.1CHECK ELECTRICAL CONNECTIONS . 1107.1.2CLEAN THE AIR VENT GRATE . 1107.1.3REPLACE THE COOLING FANS. 1117.1.4REPLACE THE INVERTER . 1127.2 DE-INSTALLING THE INVERTER . 1148 ACCESSORIES .1158.1 FUSE BYPASS TERMINALS . 1158.1.1BYPASS INPUT TERMINAL INSTRUCTIONS: . 1158.2 SHADE COVER (SSC-25ST-2) . 1168.2.1PROTECTION FROM HARSH CONDITIONS . 1168.2.2INCREASED ENERGY PRODUCTION . 1168.3 Y-COMB TERMINAL BLOCK (OPTIONAL) . 1179 TECHNICAL DATA .118

9.1 DATASHEET .1189.2 MEASUREMENT TOLERANCES .1209.3 PRODUCTION GRAPHS .1219.3.1HIGH TEMPERATURE DERATING GRAPH .1219.3.2ALTITUDE DERATING GRAPH .1229.3.3GRID VOLTAGE DERATING GRAPH .1229.3.4REACTIVE POWER CAPABILITY .12310 LIMITED WARRANTY .125

Before You Start ScopeThis Installation and Operation manual contains important information, safetyguidelines, detailed planning and setup information for installation, as well asinformation about configuring, operating and troubleshooting theCPS SCA20KTL-DO-R/US-480 and CPS SCA25KTL-DO-R/US-4803-Phase String Inverters. Here after in this manual this equipment may bereferred to simply as the inverters. Be sure to read this manual carefully beforeoperating or servicing the inverters.AudienceThe information in Chapters 2 “Overview”, 4 “Commissioning (via wireless)", 6"APP Interface”, and 8 "Accessories" is intended for the owner and operator ofthe inverter, and does not require any special training or qualifications. Theinformation in Chapters 3 “Installation”, 4 "Commissioning", 7 “Maintenanceand De-Installation” is intended for qualified personnel only. Qualifiedpersonnel have training, knowledge, and experience in:Installing electrical equipment and PV power systems (up to 1000VDC).Applying all local installation codes.Analyzing and eliminating the hazards involved in performing electricalwork.Selecting and using Personal Protective Equipment (PPE).Installation, commissioning, troubleshooting, and maintenance of theinverter must be done only by qualified personnel.1

Thank you for choosing a CPS 3-Phase String Inverter. These PV Invertersare high performance and highly reliable products specifically designed for theNorth American Solar market.Instructions inside this user manual will help you solve most installation andoperation difficulties. Installation, commissioning, troubleshooting, andmaintenance of the inverter must be performed by qualified personnel. If youencounter any problems during installation or operation of this unit, first checkthe user manual before contacting CPS Customer Service. This user manualis applicable for the following models:CPS SCA20KTL-DO-R/US-480 and CPS SCA25KTL-DO-R/US-480The manual will be periodically updated or revised due to the productdevelopment or improvement. The latest version of this manual can beacquired via the website at www.chintpowersystems.com.2

1. IMPORTANT SAFETY INSTRUCTIONS(SAVE THESE INSTRUCTIONS)Please read this user manual carefully before installation of the inverter. CPSreserves the right to refuse warranty claims for equipment damage if the userfails to install the product according to the instructions in this manual.Warnings and symbols in this documentDANGER:DANGER indicates a hazardous situation which, if notavoided, will result in death or serious injury.DANGER:DANGER indique une situation dangereuse qui, si elle n'estpas évitée, entraînera la mort ou des blessures graves.WARNING:WARNING indicates a hazardous situation which, if notavoided, could result in death or serious injury.AVERTISSEMENT:AVERTISSEMENT indique une situation dangereuse qui, sielle n'est pas évitée, pourrait entraîner la mort ou desblessures graves.CAUTION:CAUTION indicates a hazardous situation which, if notavoided, could result in minor or moderate injury.ATTENTION:ATTENTION indique une situation dangereuse qui, si ellen'est pas évitée, peut entraîner des blessures mineures oumodérées.3

NOTICE:NOTICE indicates a hazardous situation which, if not avoided,could result in the inverter working abnormally or propertyloss.AVIS:AVIS indique une situation dangereuse qui, si elle n'est pasévitée, pourrait entraîner un fonctionnement anormal del'onduleur ou une perte de propriété.INSTRUCTION:INSTRUCTION indicates important supplementaryinformation or provides skills or tips that can be used to helpyou solve a problem or save you time.INSTRUCTIONINSTRUCTION indique des informations supplémentairesimportantes ou fournit des compétences ou des conseils quipeuvent être utilisés pour vous aider à résoudre un problèmeou vous faire gagner du temps.Markings on the productCAUTION:Risk of electric shock from energy stored incapacitor.Do not remove cover until 5 minutes afterdisconnecting all sources of supply.CAUTION:Risk of electric shock, do not remove cover. No4

user serviceable parts inside. Refer servicing toqualified service personnel.WARNING:Electric shock hazard. The DC conductors of thisphotovoltaic system are ungrounded and may beenergized.CAUTION:Risk of electric shock.a) Both ac and dc voltage sources are terminatedinside this equipment. Each circuit must beindividually disconnected before servicing.b) When the photovoltaic array is exposed to light,it supplies a dc voltage to this equipment.WARNING:Electric shock hazard.The DC conductors of this photovoltaic system arenormally ungrounded but will become intermittentlygrounded without indication when the invertermeasures the PV array isolation.ATTENTION:Risque de choc électrique.Les conducteurs DC de ce système photovaltaicne sont pas mis à la terre et peut être alimenté.ATTENTION:Risque de choc électrique.a) Les deux sources de tension CA et CC sontrésiliées à l intérieur de cet équipement.Débranchez chaque circuit individual avant tout5

entretien.b) Quand les panneaux photovoltaïque sontexposés à la lumière, ils fournissent une tensionen courant continu à l équipement.ATTENTION:Risque de choc électrique. Les conducteurs DC dece système photovaltaic ne sont pas mis à la terrenormalement, mais deviendra mis à la terre parintermittence lorsque l'onduleur mesure l'isolementdu champ photovoltaique.CAUTION:Hot surfaces.To reduce the risk of burns, do nottouch.ATTENTION:Surface chaude. Pour réduire le risqué de brûluresne pas toucher.WARNING:This AFCI device automatically resets and mayonly be used when allowed by NFPA 70.ATTENTION:Cet appareil AFCI se réinitialise automatiquementet ne peut être utilisé que si la norme NFPA 70 lepermet.WARNING:For continued protection against risk of fire,replace only with same type and ratings of fuse.ATTENTION:Pour continuer d'assurer la protection contre les6

risques d'incendie, il faut remplacer les fusibles demême type et courant.WARNING:Hazardous voltage area under the plastic cover.Do not open fuse holders under load ! Protectivegear must be used/worn before accessing fuses !Do not open fuse holders if bypass terminals wereinstalled !ATTENTION:Zone de tension dangereuse sous le couvercle enplastique.Ne pas ouvrir les porte-fusibles sous charge!L'équipement de protection doit être utilisé / portéavant d'accéder aux fusibles!N'ouvrez pas les porte-fusibles si des bornes debypass ont été installées!WARNING:High touch current .Earth connection essential before connectingsupply.ATTENTION:Courant tactile élevé.La connexion à la terre est essentielle avant deconnecter l'alimentation.For more details please see the user manual.Pour plus de détails s'il vous plaît voir le manueld'utilisation.7

WARNING:All the installation and wiring connections must be performed byqualified technical personnel. Disconnect the inverter from the PVmodules and the AC grid before maintaining or servicing theequipment.Failure to follow these instructions and other relevant safetyprocedures may result in voiding of the warranty and/or damage to theinverter or other property!Risk of electric shock and fire. Use only with PV modules that havea maximum system voltage of rating of 1000VDC or higher.Electric shock Hazard. The DC conductors of this photovoltaicsystem are normally ungrounded but will become intermittentlygrounded without indication when the inverter performs the PV arrayisolation measurement.Shock Hazard. The inverter is energized from both AC and DCsources. Disconnect all energy sources before servicing.For continued protection against risk of fire, replace only with sametype and ratings of fuse.DANGER:Disconnect the inverter from the AC grid and PV modules beforeremoving covers or opening the equipment. Wait at least 5 minutesafter disconnecting from the DC and AC sources before servicing ormaintaining the inverter. Ensure hazardous high voltage and energyinside the inverter has been discharged prior to servicing.NOTICE:The inverters are designed to only interconnect with an AC powersource as part of the public electric utility grid. Do not connect the ACoutput of the inverters directly to any private electric utility power8

equipment. The inverters are to be installed with floating orungrounded PV arrays -R/US-480inverters weigh approximately 22kg (48.5 pounds). The wireboxportion weighs approximately 6kg (13.2 pounds).Ensure the mounting bracket is properly installed before hanging theinverter and wirebox on the bracket. A team of two is recommended tolift and place the inverter and wirebox into position.INSTRUCTION:Please check with your local electric utility supply company beforeselecting a grid standard. If the inverter is operated with an incorrectgrid standard, the electric utility supply company may cancel theinterconnection agreement.Placing the inverter into operation before the overall system complieswith the national codes, rules and safety regulations of the applicationis also not permitted.WARNING:This product can expose you to chemicals including lead, known to thestate of California to cause cancer and birth defects or v9information,goto

2. Overview2.1 Inverter for grid-tied PV systemsCPS SCA20KTL-DO-R/US-480 and SCA25KTL-DO-R/US-480 3-PhaseTransformerless String Inverters are designed for use with an ungroundedarray in carport, commercial rooftop, and large utility scale PV grid-tiedsystems. The system is generally made up of PV modules, a 3-Phase StringInverter with a fused combiner/disconnect, and AC power distributionequipment (Figure 2-1). The inverter converts the available DC energy fromthe PV modules to AC power by synchronizing the output current to the samefrequency and phase as the AC grid. All or part of the AC power is supplied tolocal loads, and the surplus power is exported to the electric utility grid.Figure 2-1 Grid-tied PV system2.2 Product FeaturesHigh conversion efficiency: Advanced 3-level conversion topology withSpace-Vector PWM; Max. efficiency: 98.5%, CEC efficiency: 98.0%.Grid adaptability: IEEE 1547 Interconnect Standard and CPUC Rule 21applicable; Reactive Power; 0.99 PF ( 0.8 adjustable), and optional localor remote Active Power Curtailment.10

Flexible communication: Supports standard CPS Modbus RS485,SunSpec Modbus, and HTTPS/XML communications via Flex Gateway toensure compatibility with 3rd party monitoring and control systems. TheFlex Gateway enables further command/control as well as remote firmwareupgrades. Flex Gateway card is an optional accessory. Refer to FlexGateway manual for further detailed information.Wide DC input voltage range: Operating DC Input Voltage Range:200-950VDC; Max DC input voltage: 1000VDC.Long Service Life: Designed with thin-film capacitors to extend inverter'sservice life.2 MPPTs: Multi-channel MPPT (Maximum Power Point Tracker) enablesmaximum design flexibility and energy harvest optimization over the life ofthe system.Separable Wirebox: The wirebox enables fused input of industry standardconductor assemblies.High protection degree: Powder coated aluminum NEMA 4X enclosuremeets the demanding needs of both indoor and outdoor use.Intelligent Integration: Integrated load break rated DC/AC disconnectswitches, and up to 6 positive fused string inputs eliminate the need forexternal DC combiner boxes, simplifying installation and the need for DCBOS equipment.2.3 Product Protection FunctionsReverse polarity protection of DC inputAC and DC Short circuit protectionArc-fault detection and circuit interruptionAnti-islanding detection with bi-directional frequency perturbationDC Input and AC output over-voltage protection11

DC Input over-current protectionDC input insulation against ground monitoringDC injection of AC outputAC output voltage and frequency monitoringLeakage current against ground monitoringInternal enclosure temperature monitoringIGBT power module temperature monitoringRSD function2.4Appearance and Main Item Description3154267Figure 2-2 Diagram of the Inverter assemblyMain items of the Inverter:Main inverter enclosureInverter mounting bracketInverter wireboxCooling fans12

LED indicator lightsAC switch: AC power on/offDC switch: DC power on/off2.5 Schematic Diagram and Circuit DesignThe basic electrical schematic diagram of CPS SCA20KTL-DO-R/US-480 andSCA25KTL-DO-R/US-480 inverters are shown in Figure 2-3. The input from PVsource circuits passes through surge protection circuitry, DC EMI wave filters,and independent DC-DC boost circuitry to achieve maximum power pointtracking and boost the voltages to a common DC bus. The inverter uses linevoltage and frequency measurements to synchronize to the grid and convertsthe available PV energy to AC power by injecting balanced 3-phase AC currentinto the electric utility grid. Any high frequency AC component is removed bypassing through a two-stage relay and EMI wave filter to produce high qualityAC power.Figure 2-3 Schematic Diagram of the CPS SCA20/25KTL-DO-R/US-480 Inverter13

2.6 Anti-islanding DetectionThe CPS SCA20KTL-DO-R/US-480 and CPS SCA25KTL-DO-R/US-480inverters include Unintentional Islanding detection as required by UL 1741/IEEE1547. The inverter will continuously make bi-directional perturbations to thefrequency of the output current by injecting a small amount of reactive power todetect a possible islanding condition. If the grid is stable, these smallperturbations will have negligible effects on the system voltage frequency.However, in an islanded condition the changes in reactive power will force thefrequency of the system voltage to deviate significantly, which will trigger theinverter to cease operation and disconnect from the grid.2.7 DC Ground Fault ProtectionThe inverters include residual current detection GFCI as part of the DC groundfault detection method required by UL 1741. If there is a ground fault in the PVarray, the ground fault detection circuitry will detect leakage current, trigger analarm, and the inverter will cease operation.See Chapter 5 for furtherinformation regarding GFCI Static and Dynamic trip thresholds and operation.2.8 Surge SuppressionStandard Waveform Peak ValuesSurge CategoryRing WaveCombination WaveB6kV/0.5kA6kV/3kA"Standard 1.2/50 s - 8/20 us Combination Wave""Standard 0.5 s - 100 kHz Ring Wave"2.9 DC Arc-fault ProtectionThe inverters include DC Arc-fault detection compliant with UL 1699B-2018.The inverter will detect electrical noise that is indicative of a DC series arc.Upon detection of an arc-fault, the inverter will cease operation.14

3. InstallationThis chapter describes the planning and installation procedures for theSCA20KTL-DO-R/US-480 and SCA 25KTL-DO-R/US-480 inverters. Pleaseread carefully and install the products following the step-by-step instructions.The inverter and other main items are shipped in one package, consisting of A.)the main inverter enclosure and B.) the wirebox, mounting bracket, quickinstallation guide, and accessory kit. Before installation, please check that thefollowing items are included in the package:Table 3-1 Main ItemsNo.(1)(2)(3)(4)ItemMain enclosure ofthe PV inverterWiring box of the PVinverterMounting bracketQuick installationguideQ’tyNote11Bracket upon which the PV1inverter is hung and mountedPV inverter installation and1operation guideKit contains all necessary(5)Accessory kit1hardware and accessories forinstallation15

Table 3-2 Accessory KitNo.ItemQ’tyNote4 for securing the wiring box to the(1)M6 X18mm Phillipsscrewmain enclosure; 6 for securing the12inverter to the mounting bracket; 1for the External Ground connection,1 spare(2)(3)(4)6 pin PCB connectorplug2 pin PCB connectorplugPhilips screw1For the RS485 communication1For the RS485 communication1Spare (for wire-box cover)INSTRUCTION:The items in the Accessory Kit Table 3-2 above are for the standardconfiguration. The accessories provided may vary if optional partsare purchased.3.1 Recommendations before InstallationSee Chapter 9, Technical Data for specification ranges and ortheSCA20KTL-DO-R/US-480 and SCA25KTL-DO-R/US-480 inverters isdefined based on the following conditions;Condition 1: -40 C to 70 C, Inverter not installed, and in storage (inpackaging or unpackaged).16

Condition 2: -30 C to 60 C, Inverter installed, connected to electricutility grid and operating during daylight hours.Condition 3: No low temp limit to 70 C, Inverter installed, connectedto electric utility grid but non-operating (daylight or nighttime hours).Pre-installation checklistCheck that the inverter environmental specifications (protectiondegree, operating temperature range, humidity and altitude, etc)meet the requirements of the specific project location.Make sure that the electric utility grid voltage is within range for thegrid standard chosen.Ensure that the local electric utility grid authority has grantedpermission to connect to the grid.Installation personnel must be qualified electricians or those whohave received professional training.Wear and use proper PPE (personal protective equipment) duringinstallation.Sufficient space according to Figure 3-3 and Figure 3-4 must beprovided to allow the inverter cooling system to operate effectively.Install the inverter away from flammable and/or combustiblesubstances.Avoid installing the inverter in locations that exceed the temperaturelimits specified for the inverter to prevent undesirable power loss.Do not install the inverter near an electromagnetic source which cancompromise the normal operation of electronic equipment.17

NOTICE:Outdoor Installations for Extended Periods without PowerCPS advises against leaving inverters mounted outdoors for anextended period of time (more than 90 days) and/or allowing invertersexposed to cycles of freezing temperature without both DC and ACpower connected to the inverters under normal operation.The CPS inverter enclosures are designed to conform to NEMA4 (orIP65), however there exists the possibility of water condensation insidethe inverter enclosure when it is left exposed to an outdoor environmentwithout power to operate for an extended period of time. Moisture in theair could enter the power head of the inverter through the small openingbetween wiring box and power head during the time that the wiring boxcover is opened for wiring purposes. When the inverter is exposed totemperature swings, especially in cold weather, moisture inside theinverter power head could condense over the aluminum heatsink areawhere inverter semiconductors are mounted. Water droplets on theheatsink may cause a short-circuit to live semiconductor devices. Whenthe PV source is applied to the inverter, this PV power source couldcause the inverter to fail and result in a short-circuit across the PVarray.If such a situation in which the inverter is mounted outdoors withoutoperating power occurs, CPS recommends that the inverter power headbe inspected for water condensation before any DC or AC power canbe applied to inverter. Without inspection, customers will run the risk ofhaving inverter electronic circuit damage when power is applied toinverter during startup. It is advised that customers contact CPS forfurther advice and to arrange schedule for CPS service personnel toperform inspection of inverter on site.- CPS hotline: 855-584-716818

3.2 Mechanical Installation3.2.1 Dimensions200.0 1mm(7.9in.)400.0 1mm(15.7in.)5m inCAUTION:Ris k of e lectric shock from energy stored in ca pacito r.Do not remo ve cove r until 5 minutes afterdisconnecting all sources of supply.CAUTION :Risk of electr ic shock, d o notr emovecover. No userser vic eable pa rts inside . Refer servicing to qualifiedservice per so nnel.W AR NING :Ele ctric shock h azard . The DC conductors o fthisphotovoltaic system are u ngrounde d and may beenerg iz ed.CAUTION:Risk Of Electric Shock.a) B oth ac and dc voltage sou rces are termina tedinside this equipment. E ach circuit must be individuallydisconnected befo re servicing.b) W he n the p hotovolta ic array is exposed to light, itsupplies a dc voltage to th is equ ip ment.W AR NING :Ele ctric S hock Hazard.The DC conductors o f th is pho tovoltaic system a renorma l y ungr ounded but will become interm itten tlygr ounde d wit hout ind ication when the ni vertermea sures th e PV array isolation.ATTENTION:Risque de choc éle ctrique à par tir d énergie stockéedans les condensate urs.Retirer le couver cle du b o?tier au moins 5 minutesaprès a vo ir d ébranché tou te s le s sour cesapp rovision nement.ATTENTION:665.0 1mm(26.2in.)Ris qu e de choc électrique.Ne pas r etirer le couvercle.Reportez-vous à u n technicien qualifé pour toutentr etie n.ATTENTION:Ris qu e de choc électrique.Les conducteu rs DC de ce système ph otovaltaic nesont pas mis à la ter re et peut être ali menté.ATTENTION:Ris qu e de choc électrique.a) L es deu x source s de tension CA et CC sontrésiliées à l intérieur de ce t équipement. Débran ch ezchaque circuit individual avant tout en tr etien.b) Quand les pa nneaux photovolta?qu e so nt exposésà la lum ière, il s f ournissent une tension encourantcontinu à l équ ipem ent.ATTENTION:Ris qu e de choc électrique. Les cond ucte urs DC de cesystème pho tovalt aic ne sont pas mis à la terrenorma le ment, mais deviendra m is à la te rre parintermittence lor sq ue l'ond uleu r mesure l'isolement duchamp p hotovoltaique.OFFOND C D ISCONN ECTFigure 3-1 Dimensions of the Inverter3.2.2 Installation Method (see Figure 3-2):Ensure that the mounting structure (wall, rack, roof, etc) is suitable to support theweight of the inverter. Follow the mounting guidelines below:(a)If the location permits, install the inverter vertically.19

(b)If the inverter cannot be mounted vertically, it may be tilted backward at15-90 angle from vertical to horizontal.(c)When inverter is installed under direct sunlight, the CPS Shade Cover(SSC-25ST-2) accessory is required to be installed. See Section 8.2 formore information.(d)Do not mount the inverter leaning forward.(e)Do not mount the inverter upside down.(f)Do not mount the inverter horizontal.shade cover0 9150 915 90(a)(d)(b)(c)(e)Figure 3-2 Inverter Mounting Options20(

CPS SCA Series Grid-tied PV Inverter CPS SCA20KTL-DO-R/US-480 and SCA25KTL-DO-R/US-480 Installation and O

Related Documents:

Product Viscosity in Centipoise Water 1 cps Milk 3 cps SAE 10 Motor Oil 85 - 140 cps Castor Oil 1,000 cps Karo Syrup 5,000 cps Honey 10,000 cps Chocolate Syrup 25,000 cps 275 Ketchup 50,000 cps Sour Cream 100,000 cps Shortening 1,200,000 cps . Epoxy and Urethane compounds can be heated to reduce viscosity however there are other .

The local SCA phone indicates that the phone is involved in an SCA call, while the monitoring SCA phone indicates that the phone is not involved in the SCA call. T58V/T58A/T56A T48S/T48G T46S/T46G/T29G Description The shared line is idle. (for monitoring SCA phone) (for monitoring SCA phone) (for monitoring SCA phone) The shared line is seized.

Grid-tied feed in PV systems have PV panels that are connected directly to an inverter. The electricity it generates is used locally on the property or fed back into the electricity grid, when excess electricity is generated. A. GRID-TIED FEED IN PV SYSTEMS 2. TYPES OF PV SYSTEMS Grid-tied hybrid PV systems are able to disconnect the incoming

SCA Policy Director Brian Parry reported the SCA legislative agenda is drafted to reflect legislative priorities found in common in city agendas across the SCA membership. Draft SCA legislative priorities for 2022 were reviewed by the Public Issues Committee (PIC) at its meeting on December 8, 2021.

followed during installation and maintenance of the inverter. The SolarPod TM Grid Tied is designed per NEC 2008 code, but as with all electrical and electronic equipment, certain precautions must be observed when installing and/or operating the SolarPod TM Grid Tied. Only persons with electrical knowledge must install the SolarPod TM Grid Tied

CPS Spark and CPS Pulse Pads CPS Pulse Pads can answer true/false, yes/no, numeric, answer series and multiple-choice questions (up to 10 answer choices depending on the delivery mode), answer sequence, short answer (up to 20 characters), and essay questions (up to 140 characters). CPS Spark Student Response Pads can answer true/false, yes/no

CPS SCH Series Grid-tied PV Inverter SCH100KTL-DO/US-600 and SCH125KTL-DO/US-600 . Installation and Operation Manual Rev 1.7 . CHINT POWER SYSTEMS AMERICA CO.

Business-Level Strategies 23.11.2010 4. What is a Strategic Business Area? Demand Demand potential (size, growth rate, market share) Customers Customer potential customer structure, buying motives and criteria) Competition Structure of the competition, the competitors' objectives and strategies, competitive position Specific resources and competences (the strategic capabilities) Organisation .