Aeon Series - GfK Etilize

2y ago
10 Views
2 Downloads
1.28 MB
12 Pages
Last View : 1m ago
Last Download : 3m ago
Upload by : Roy Essex
Transcription

Aeon SeriesEDGE FREE Fixed Frame Projection ScreenUser’s GuideApplies to all available screen materials:CineGrey 3D , CineGrey and CineWhite Product Description: The Aeon Series is a fixed frame projection screen that uses Elite’s EDGE FREE technology. The EDGE FREE design resembles a giant size flat panel TV display. The Aeon includes a velvet tape asan installation option to further enhance the frame appearance and absorb projector overshoot. An optional LEDbacklighting kit is available for added visual appearance.Assembly Video: For further assistance, watch our assembly and installation video atwww.elitescreens.com/video/aeon-assembly or scan the following QR Code:For more information on the LED kit please visit: http://www.elitescreens.com/ledHardware and Parts ListPlease make sure all parts listed below are included before installation.A. Elbow joint x 4 pcsB. Top/Bottom horizontal fame x 4 pcsC. Left/Right vertical frame x 2 pcsD. Center joints x 2 pcsE. Center Support bar x 1-3pcsF. Wall brackets x2-3 pcs(135”-150”x2pcs;180”-200” x3pcs)G. M6 screw x 2-12 pcsH. M5x15 screw x24 pcsI. M6x12 screw x 2-12pcsJ. M5x50 screws/anchor x 6 pcsK. Rubber hammer x 1 pcL. Screwdriver x1 pcM. Velvet tapeV021417-EAN. Corner Support Bar (180”-200”) x4pcswww.elitescreens.com1

Frame Assembly1. Insert the center joint (D) into one of the ½ horizontal frames (B) and fasten it with the two M5x15 screws (H).2. Insert the other ½ horizontal frame piece to the center joint and fasten also using two M5x15 screws.3. Repeat steps 1 and 2 for assembling the second horizontal frame.PushPushCenter JointsTop right FrameTop left FrameHorizontal frame4. For models 150” and below, insert and slide in oneM6 screw (G) through the channel located on the back eachhorizontal frame section (top/bottom).Note: For models 180” and above, insert and slide in four M6 screws (two on each frame) through the channellocated on the back of each horizontal frame section (top/bottom). Insert two M6 screws on each vertical framesection (left/right).Horizontal long frameM6 hex screws (G)Face upPlace one M6 hex screw (G) in the center for attaching the center support bar (E)5. Insert the elbow joint (A) into each end of the horizontal frames (B) as shown below.Elbow Joint (A)V021417-EAHorizontal long frame (B)Elbow Joint (A)www.elitescreens.com2

6. Insert the two vertical short frames (C) into the elbow joint (A).pushHorizontal long frame (B)pushVertical short frame (C)Vertical short frame (C)Note: For models 180” and above,ensure two M6 screws (G) areinserted on each vertical framebefore proceeding to step 7.Face up7. Join the remaining horizontal long frame (B) with the frame built in the previous steps as shown below.pushHorizontal Long frame (B)V021417-EAwww.elitescreens.compush3

8. Make sure all four corners are properly in place to form a perfect square. Then fasten the four angles with theM5x15 Screws (H).Four corners join correctly to form a perfectsquare. Use the included screwdriver (L) tofasten the Mx15 screws (H) into each cornerby aligning the frame screw holes to theholes in the elbow joint (A).Screen Material Installation1.Lay the screen material completely flat with the front facing down on a clean surface in a horizontal position. Theback side of the screen material should be placed upwards.Note: The back side of the material has the velcro borders all around the edges.2. Carefully and gently place the assembled frame on top the screen material as shown below. Make sure to not allowthe angle edge of the frame to come in direct contact with the screen material to avoid puncturing it.Screen material back facing upV021417-EAwww.elitescreens.com4

3. After all of the corners of the frame have been properly aligned, attach the material to the frame in the followingorder A B C D(see instructions below for details).DADCBAttach the screen material to the corners as shown below.1) Stretch the screenmaterial in the directionof the arrowhead.2) Fold over and attachmaterial to the velcrostrip of the frame.3) Fold over second sideand attach to frame4) Repeat until all foursides are done in theorder A, B, C, D4. After all four corners have been attached; please check whether the frame corners are wrapped by the screen material.If not, please loosen the velcro connection and repeat the above steps so the frame is not exposed.Note:Represents thescreen materialNote: The black shaded part represents the velcro on the frame. That Velcro end will ultimatelyattach with the other velcro end on the screen material.V021417-EAwww.elitescreens.com5

5. Proceed to attach the rest of the material to the frame as described in the illustrations below.Grasp the middle of the screenmaterial and attach it to the velcrostrip on the frameLay the Velcro end on the screenmaterial over the Velcro end of theframe and keep it within the edge.Proceed in the following sequencebelow① ②The key is to attach within themiddle sections of 1 and 2. Thencontinue attaching the remainingunattached areas.Repeat the same steps onremaining three sides in thesequence A, B, C, D as showbelow.AAttach in the following sequence: a-b-c-dDCBV021417-EAwww.elitescreens.com6

6.If the material is too loose or tight after adjusting all four corner sides, then you will need to reattach the material.Please follow the steps below to properly remove the screen material from the frame. This procedure will ensureprolonging the life of the screen material.Screen Material Removal1. Detach the velcro from the frame.2. Gently pull back the material to release the material from the velcro connections on the corners.Pull back the screen material fromthe velcro connection along theedges of the frame to detach it.Support bar installation (for models under 135”):Center Support bar1. Position the center support bar (E) in the middle of the frame and align the hole on each end of the support barwith the M6 hex screws (G)on the top and bottom frames. Then fasten with the M6x12 screws (I).Move the M6 hex screw (G) to the middle area of the frames.Align the M6 screwswith the two holes.V021417-EAwww.elitescreens.com7

Support bar installation (for models 135” - 150"):1. Position the center support bar (E) and M6hex screws (G) in the areas of the frameshown in fig 1. (Each about one thirds theway in from the end of the frame.) Align thehole on each end of the support bar with theM6 hex screws (G) located at the top andbottom frame sections. Then fasten with theM6x12 screws (I).Move the M6 hex screw (G) to these areas of the frame.Center Support BarAlign the M6 Screws withthe two holes located onthe Center Support Bar.Figure 1Support bar installation (for models 180” - 200")2. Position the center support bar (E) and M6hex screws (G) in the areas of the frameshown in fig 1. Align the hole on each end ofthe support bar with the M6 hex screws (G)located at the top and bottom frame sections.Then fasten with the M6x12 screws (I).Move the M6 hex screw (G) to these areas of the frame.Center Support BarFigure 1V021417-EAAlign the M6 Screws withthe two holes located onthe Center Support Bar.www.elitescreens.com8

1. Position the Corner support bars (N) and M6 Hex screws (G) in the areas of the frame as shown below infig 2. Align the holes on each end of the corner support bars with the M6 hex screws located on thevertical and horizontal frame sections. Then fasten with the M6x12 screws (I).Corner Support BarFigure 2Align the M6screws with thetwo holes on theCorner SupportBars.Notice to Installer:Please use the following installation instructions to obtain superior optical performance from the CineGrey 3D Angular Reflective ALR (Ambient Light Rejecting) Screen.Make sure to follow these instructions in order for the CineGrey 3D to perform correctly. Angular-Reflective material is not compatible with ultra/short-throw projectors Minimum lens throw ratio 1.5x image width Ambient light must not come from the same direction as the projectorSince angular-reflective means that the projected image will reflect at the mirror-opposite angle, itis important to position the projector so that the viewer will get the best possible image.Step 1: Establish the general “eye level” of the viewersStep 2: Set the appropriate projection levelStep 3: Adjust the screen height level and projection angleInput Angle (A) Output Angle (B) aligns with the viewer’s angleV021417-EAwww.elitescreens.com9

Velvet Tape Trim InstallationAttention: Installing the velvet trim will reduce the viewing size of your screen. See below illustrations for acomparison of the viewing size of the before and after edge trim installation using the 100” &120” 16:9 diagonalmodels.100” comparison:Before installing the trim strip120” comparison:After installing the trim stripBefore installing the trim stripV021417-EAAfter installing the trim stripwww.elitescreens.com10

1) Lay the assembled frame on its back on a clean surface.The Screen2) Measure 10 mm (0.40”) from the edge of the frame to the inside of the material.3) Make a light mark with a pencil approximately every 8-10 inches apart. This will help guide the way to making astraight line for the velveteen strip.10”10”4) Repeat steps 2 and 3 on the remaining sides5) Peel off the backing on the velvet strip and align the top edge at the 10mm mark.Screen MaterialScreen Material10”V021417-EAwww.elitescreens.com11

6) Continue peeling off the backing until the other side has been reached. Make sure that the velvet strip is keptstraight the entire way.7) Fold back the excess unused velveteen.8) Repeat steps 5-7 to complete the velveteen strip installation.InstallationLocate your desired installation location with a stud finder (recommended) and mark the drill-hole area of where thescreen is to be installed.1. Drill a hole with the proper bit size according to the wood screws included.2. Line up the wall brackets with the drilled holes on the installation location and screw them in using a Phillipsscrewdriver.3. Position the frame screen onto the wall brackets(F) as shown in below.4. The design of the wall brackets allows the frame to slide over them through its sides. This is an importantfeature of the installation design as it allows your screen to be properly centered.For a local Elite Screens contact or Technical Support, please s.com12

EDGE FREE Fixed Frame Projection Screen . User’s Guide Applies to all available screen materials: CineGrey 3D , CineGrey and CineWhite Product Description: The Aeon Series is a fixed frame projection screen that uses Elite’s EDGE FREE technology. The EDGE F

Related Documents:

AEON 4000 AEON 2000 AEON 800 Extended life lubricant; demulsible formulation Minimizes maintenance and downtime Characteristics of a synthetic in a petroleum blend Hydrocarbon based, semi- sy

Aeon Labs MultiSensor 6 Engineering Specifications and Advanced Functions for Developers Aeon Labs MultiSensor is a routing binary sensor device based on Z-Wave routing slave library V6.51.06. MultiSensor can be included and operated in any Z-wave network with other Z-wave certified devices from other manufacturers and/or other applications.File Size: 765KBPage Count: 24

Green Eye AEON COVID-19 . Palm oil. 100% RSPO certification of raw materials. 100% 54% 64% 38% 82% 80% 33% 76% 41% 99%. 12. AEON Sustainable Procurement Policy and 2020 Procurement Goals. . producers around the world, use third-party certification to ensure secure evidence Because there are multiple labels,

GfK Group GfK Custom Research – Nick Moon, GfK NOP Social Research July 2008 . Solid and reliable because we are a leading global market research company. Sales. In 2007: 1,800 million US Employees. More than 9,000 full-time staff. Growth. An average growth of 15% during the last 10 years. Services. Fact based consultancy Full global .

In addition to the Cisco 1900 series, Cisco 2900 series, and Cisco 3900 series ISR Software Configuration Guide (this document), the following reference guides are included: Type of Document Links Hardware † Read Me First for the Cisco 1900 Series, 2900 Series, and 3900 Series Integrated Services Routers.

GFK-0265 Series 90 -70 Programmable Controller Reference Manual GFK-0356 Series 90 -30 Programmable Controller Installation Manual . GFK-1396 CIMPLICITY HMI for Windows NT and Windows 95 CimEdit Operation Manual At GE Fanuc Automation, we strive to produce quality technical documentation. After you have

SMB_Dual Port, SMB_Cable assembly, Waterproof Cap RF Connector 1.6/5.6 Series,1.0/2.3 Series, 7/16 Series SMA Series, SMB Series, SMC Series, BT43 Series FME Series, MCX Series, MMCX Series, N Series TNC Series, UHF Series, MINI UHF Series SSMB Series, F Series, SMP Series, Reverse Polarity

American Gear Manufacturers Association 500 Montgomery Street, Suite 350 Alexandria, VA 22314--1560 Phone: (703) 684--0211 FAX: (703) 684--0242 E--Mail: tech@agma.org website: www.agma.org Leading the Gear Industry Since 1916. February 2007 Publications Catalogiii How to Purchase Documents Unless otherwise indicated, all current AGMA Standards, Information Sheets and papers presented at Fall .