RBI Solar RS-TL Double Rail IG 2017-1

2y ago
15 Views
2 Downloads
1.88 MB
9 Pages
Last View : 7d ago
Last Download : 3m ago
Upload by : Kelvin Chao
Transcription

Solar Moun!ng SystemInstalla!on GuideRBI Solar Tilted Roof Mount SolutionDouble Rail RS-TL5 & 10 Portrait Orienta on Solu on forAll Low-Slope and Flat Roof Applica onsUL 2703 Listedfor Bonding and GroundingRBI Solar 1292 Logan Circle NW Atlanta, GA 30318 513-618-7240 info@rbisolar.com

TABLE OF CONTENTSUL 2703 Lis ng Summary.2RBI Solar Warranty .2Component Overview.3RS-TL Installa on .4RS-TL Grounding . 5APPENDIX A: Accessory Moun ng .6APPENDIX B: Addi onal Grounding Notes .7UL 2703 LISTING SUMMARYThe en!re RBI Solar Tilted Roof Mount Solu!on is UL 2703 Listed for bonding and grounding. Some components,such as the !lt legs and lower rails, are not in the ground path and therefore were not required under UL 2703 to beevaluated.The evaluated components have pages marked by:RBI SOLAR WARRANTYInstalla!on instruc!ons and applicable building code must be followed or product warranty is void. RBI Solar willnot be responsible for any loss and/or liable for any claim resul!ng from installa!ons that are not in accordancewith installa!on guide instruc!ons and/or applicable building code.RBI Solar RS-TL Double Rail IG 2017-12

OVERVIEWThe RBI Solar RS-TL system tilts modules to a 5 or 10 angle using tilt leg sets. The RS-TL can bemounted to a variety of low-slope roof applications.The RS-TL carries a Class A Fire Ra!ng under UL1703 for low-slope roofs when used with Type 1,2, or Type 3 modules.If UL1703 is required for your project, a fire shield will need to be installed. Refer to the Fire Shield Guides for detailson the fire shield and installa!on instruc!ons.Please read this guide carefully prior to installa!on. Always follow proper safety precau!ons and check local buildingcodes to ensure compliance. Please check for the latest versions of the installa!on guide at www.renusolamerica.com.GCBDAFE*If the !lt legs are a"aching directly tothe roof, refer to the RBI Solar RS-VS TiltPortrait Single Rail Installa on Guide forhow to install.Required Tools1.13mm hex head deep socket2.Torque wrenchSYSTEM COMPONENT LISTAL-FootBRailCIB SpliceDLarge Tilt LegESmall Tilt LegFEnd ClampGIB Mid ClampHGrounding LugRBI Solar RS-TL Double Rail IG 2017-13

INSTALLATIONStep 1. Roof Attachment and L-feetInstall appropriate roof a achment per manufacturer’sinstruc ons. Fasten A L-feet to roof a achment.ARefer to the Project Layout for the L-foot spacing.Step 2. 1st Set of RailsBA ach the 1stset of B rails to the L-feet using the preassembled T-bolts and nuts. Tighten T-bolts to 10 !-lbs.AStep 3. IB Splice ConnectorsC IB splice connectors are required to connect B rails togetherand electrically bond them.Rails can be flush against each other orspaced apart up to ¼”.Insert splice in the side of the rail with fourt-bolt heads lined-up with channel opening and center the splicebetween the two rails.Tighten T-bolts to 10!-lbs.BCStep 4. Tilt LegsDA ach the E small and large D lt legs to the 1stset of rails.The distance between each large and small lt leg is 48” to ensureproper fit up. Refer to the Project Layout for the inter-row spacing.EStep 5. 2nd Set of RailsA ach the rails to the lt legs using the pre-assembled T-boltsand nuts. Tighten T-bolts to 10 !-lbs. Install addi onal IB SpliceConnectors where needed.Step 5. End ClampsSnap the F end clamp onto the rail as shown. Secure themodules by ghtening clamp to 8 !-lbs.8 !.-lbs.FImportant: DO NOT apply additional anti-seizeto the clamps.Step 5. IB Mid ClampsSnap the G IB mid clamp onto the rail with the T-bolt head linedup with the channel opening. Slide the next module against themid clamp and ghten to 10 !-lbs.10 !.-lbs.GIMPORTANT: Be sure that the T-boltindicator line is parallel to the small ribson the G IB mid clamp. This alignment isrequired for proper a achment.RBI Solar RS-TL Double Rail IG 2017-14

GROUNDINGIntegrated WEEB bonds module to module. Serrated T-bolt Serrated T-bolts and serrated flange nut bond both railsand serrated flange nut extend that bond to the rail.and the IB splice connector.WEEB clip bonds the rail to the lug. The solid copper wireprovides the ground connec-"on. Tighten the lug to therail to 10 #-lbs. Tighten the copper wire to 7 #-lbs.RBI Solar RS-TL Double Rail IG 2017-15

APPENDIX A: ACCESSORY MOUNTINGAs part of the UL 2703 Listing, Solar Edge Power Optimizer top plates (used with P600/P700 models) andother microinverters & power optimizers with top plates that meet the requirements listed below can bebonded to the rest of the system. After installing the provided hardware, tighten to 10 ft-lbs.M8-1.25 304SS serrated flange nut(tighten to 10 ft-lbs)8.2mm slot widthTop Plate (5052-H32 aluminum,2mm thick) - Common tomicroinverters power optimizersM8-1.25x25mm 304SS serratedT-bolt w/ nylon patchRBI Solar RS-TL Double Rail IG 2017-16

APPENDIX B: ADDITIONAL GROUNDING NOTESThe RBI Solar RS-TL moun!ng system may be used to ground and/or mount a PV module complying with UL1703 only when the specific module has been evaluated for grounding and/or moun!ng in compliance with theincluded instruc!ons.In order to maintain the Lis!ng for bonding, Listed (ZODZ) or R/C(ZODZ2) wire management device(s) must beassembled according to the manufacturer’s instruc!ons.The RBI Solar RS-TL is a non-separately derived system that is listed under UL 2703 and was evaluated withthe modules listed in the table below. The max fuse ra!ng is 30A, which covers most modules. It is importantto periodically inspect the installed system for loose components, loose fasteners, and any corrosion. If anycorroded parts are discovered, the affected parts must immediately be replaced.Table 1. UL 2703 Approved ModulesModule ManufacturerAstronergy[40mm Frame]BYD[40mm Frame]CSUN[40mm Frame]ET[60 Cell Silver 35mmFrame]RBI Solar RS-TL Double Rail IG 2017-1Module Series(Nova) CHSM6612M-315-345(Nova) CHSM6612M/HV-320-345,(Nova II) CHSM6612M-325-365,(Nova II) CHSM6612M/HV-330-365,(Nova) CHSM6610M-265-290,(Nova) CHSM6610M/HV-265-290,(Nova II) CHSM6610M-275-295,(Nova II) -310-330,(Violin) CHSM6610P-255-275,(Violin) CHSM6610P/HV-255-275,(Violin) CHSM6612P-305-330,(Violin) CHSM6612P/HV-305-330,(Violin II) CHSM6612P-315-335,(Violin II) CHSM6612P/HV-315-335,(Violin II) CHSM6610P-260-290,(Violin II) CHSM6610P/HV-260-290,(Diamond) CHSM6612P-305-325,(Diamond) CHSM6612P/HV-305-325,(Star II) CHSM6612M-350-365,(Star II) CHSM6612M/HV-350-365BYD XXXP6C-30BYD M 70-290WWCO,ET-P660260-270WWCO,Elite Mono ET-M660280-295WW,Elite Poly An!-Glare ET-P660255-265WWG,Elite Poly ET-P648205-215WW,Elite Poly ET-P660250-270WW7

APPENDIX B: ADDITIONAL GROUNDING NOTESModule ManufacturerFlex EnergyHanwha Q CellsModule SeriesFXS-310-335BB-SAZ1W4Hanwha Q Cells Q.Pro L-G2HyundaiHiS-MxxxRG where xxx is 250 to 260HiS-SxxxRG where xxx is 260 to 270HiS-SxxxRW where xxx is 255 to 265HiS-MxxxMG where xxx is 230 to 250HiS-SxxxMG where xxx is 245 to LPB,KD235-250GX-LFB,KD135-140GX-LFBS 20N1K-A5,LG290-300S1C-A5REC[30mm Silver Frame]REC[38mm Black Frame]REC[38mm Silver Frame]REC[45mm Silver Frame]Recom[40mm Frame]Seraphim[50mm Frame]SolarWorld[33mm Frame]RBI Solar RS-TL Double Rail IG 2017-1REC275-290TP2S,REC335-350TP2S 72REC265-285TP BLK,REC275-295TP2 BLK,REC240-270PE BLK,REC285-300TP2M BLK2REC265-285TP,REC275-295TP2,REC240-270PETwin Peak REC330-340TP72,Peak Energy REC300-325PE72Amur Leopard RCM-300-340-6PA,Black Panther RCM-310-330-6MA,Black Panther odule Plus, SW xxx Mono where xxx is 275 - 300Sunmodule SW xxx XL Mono where xxx is 320 - 350Sunmodule Pro-Series, SW xxx Poly where xxx is 250 - 260Sunmodule Protect, SW xxx Mono where xxx is 275 - 2808

APPENDIX B: ADDITIONAL GROUNDING NOTESModule ManufacturerSolarWorld[31mm Frame]Suniva[46mm Silver Frame]Sunpower[46mm Frame]Trina[60 Cell 40mm Frame]RBI Solar RS-TL Double Rail IG 2017-1Module SeriesSunmodule SW 220 mono & poly,SW 225-235 poly,SW 240-245 mono & poly,SW 245-255 poly Pro,SW 250-270 mono,Plus SW 250- 285 mono,Protect SW 265-275 monoOPT E-WHT-DTSM-225-245 PC05TSM-225-245 PA059

[38mm Black Frame] REC265-285TP, REC275-295TP2, REC240-270PE REC [38mm Silver Frame] Twin Peak REC330-340TP72, Peak Energy REC300-325PE72 REC [45mm Silver Frame] Amur Leopard RCM-300-340-6PA, Black Panther RCM-310-330-6MA, Black Panther RCM-335-355-6MA Recom [40mm Frame] SRP-340-360-

Related Documents:

Chapter 7: RBI 581 ISO Risk Plot 88. About the RBI 581 ISO Risk Plot 89 Access the Inventory Groups in a Process Unit 90 Access the RBI 581 ISO Risk Plot Page of a Functional Location 91 Access the RBI 581 ISO Risk Plot Page of an Asset 95 Access the RBI 581 ISO Risk Plot Page of a Corrosion Loop 96 Access the RBI 581 ISO Risk Plot Page of a .

Solar Milellennium, Solar I 500 I CEC/BLM LLC Trough 3 I Ridgecrest Solar Power Project BLM 250 CEC/BLM 'C·' ' Solar 250 CEO NextEra I Trough -----Abengoa Solar, Inc. I Solar I 250 I CEC Trough -I, II, IV, VIII BLM lvanpah SEGS Solar I 400 I CECJBLM Towe'r ico Solar (Solar 1) BLM Solar I

Mohave/Harper Lake Solar Abengoa Solar Inc, LADWP San Bernardino County 250 MW Solar Trough Project Genesis NextEra Energy Riverside County 250 MW Solar Trough Beacon Solar Energy Project Beacon Solar LLC Kern County 250 MW Solar Trough Solar Millennium Ridgecrest Solar Millenn

4. Solar panel energy rating (i.e. wattage, voltage and amperage). DESIGN OF SYSTEM COMPONENTS Solar Panels 1. Solar Insolation Solar panels receive solar radiation. Solar insolation is the measure of the amount of solar radiation received and is recorded in units of kilowatt-hours per square meter per day (kWh/m2/day). Solar insolation varies .

responding to the solar direction. The solar tracker can be used for several application such as solar cells, solar day-lighting system and solar thermal arrays. The solar tracker is very useful for device that needs more sunlight for higher efficiency such as solar cell. Many of the solar panels had been

There are three types of solar cookers, solar box cookers or oven solar cookers, indirect solar cookers, and Concentrating solar cookers [2-10]. Figure 1 shows different types of solar cookers namely. A common solar box cooker consists of an insulated box with a transparent glass or plastic cover that allows solar radiation to pass through.

RBI Solar RS-TL Single Rail IG 2017-1 6 A P P E N D I X A : A C C E S S O R Y M O U N T I N G As part of the UL 2703 Listing, Solar Edge Po

API RP 581 is a well-established methodology for conducting RBI in the downstream industry and the 3rd edition of the standard has just been published in April 2016. This paper examines the new features of the 3rd edition particularly for internal and external thinning and corrosion under insulation and it also discusses a case study of application of this latest RBI methodology in France .