EpconG5High-Strength Epoxy AdhesiveRamsetTM

CONTENTSCorporate Profile3Product Information4Installation Instructions5On-Site Tensile Pull-out Test Procedure6Material Safety Data Sheet7Design Guide9Rebar (FE460)9Anchor Stud (G5.8) / Chemset 9Anchor Stud (G8.8) / Chemset 22Anchor Stud (SS316) / Chemset 26Test Reports & Approvals30Project References37Ramset EpconG5TM2

P R O D U C T I N F O R M AT I O NEpcon G5 -- High Strength EpoxyYou don’t have to waste your valuable time waiting for longer cure times or wastemoney disposing of dried up nozzles. The Epcon G5 is the solution to your problem.The epoxy resin and hardener are thoroughly and evenly mixed as they are dispensed from the dual cartridge through a static mixing nozzle, directly into theanchor hole.With an extended working time (15 minutes) and a full cure in less than 2 hours,your crew can work more efficiently saving you time and money.AdvantagesHIGH PERFORMANCE EPOXY: Shallower embedment depth requiredFIRE RESISTANT STRUCTURES: Tested up to 4 hours FRP by Warrington (BS 476 Part 20)EXTENDED WORKING TIME: 15-minute nozzle life at 20ºC, 2-hour cure time at 20ºCCOST SAVINGS: Less delay of work, Less nozzles usedLOW SHRINKAGE: Suitable for cored and oversized holesNON-OFFENSIVE ODOR: Virtually odorless, can be used indoorsWATER INSENSITIVITY: Works in damp holes and underwater applicationsSpecificationsEPOXY CHEMICAL:PACKAGING: Two component, 100% solids (containing no solvents), nonsag paste, insensitive to moisture, grey in colour Disposable, self-contained 650mL cartridge systemcapable of despensing both epoxy components in theproper mixing ratio. Meets ASTM C881-99, Type IV, Grade 3 with the exceptionof gel time Shrinkage during cure per ASTM D2566: 0.00004 in./inEpoxy components dispensed through a static mixingnozzle that thoroughly mixes the material and placesthe epoxy at the base of the pre-drilled hole. Compressive strength, ASTM D695: 71 MPa minimum Heat Deflection Temperature: 62 C minimumCartridge markings: Include manufacturer’s name,batch number and best-used-by date, mix ratio byvolume, ANSI hazard classification, and appropriateANSI handling precautions. Water solubility: None Shelf Life: Best if used within 18 monthsRamset EpconG5TM4

I N S TA L L AT I O N P R O C E D U R E1. Drill a hole with a Ramset Power Tooland Drill Bit to the required hole diameter and depth as indicated in theRamset Design Guide.2. Remove initial debris caused by thedrilling action with a hand blower orair compressor.3. Use a wire brush to dislodge excessdebris on the surrounding surface ofthe hole.4. Repeat steps 2 and 35. Remove the cap of the Ramset EpconG5 cartridge and attach the staticmixer provided.6. Put the Ramset Epcon G5 cartridgeinto the hand dispenser tool.7. Dispense the chemical initial mix untilthe colour is consistent.8. Pump the chemical into the hole untilit is half-filled.9. Insert the rebar/stud into the hole ina twisting motion to ensure that therebar/stud is fully coated with thechemical.Ramset EpconG5TM5

TESTING PROCEDUREMETHOD STATEMENT FOR NON-DESTRUCTIVE TENSILE TESTON RAMSET EPCON G5 CHEMICAL WITH REBARS INSTALLED1.Prior to carrying out the test, the test equipment (Hydraulic Jack System with calibration certificationattached) must be setup in position according to BS5080 Part 1.2.The loading frame is placed through the rebar and sits directly on the base concrete. The appropriatetype of hydraulic jack is mounted on top of the loading frame and wedged in place with a corresponding wedge system to engage the rebar tightly at the end of the setup before applying the load.3.A central load is applied gradually by means of the hydraulic jack system, via a hollow piston cylinderonto the wedges to create a reaction force equaling to a tensile pull-out effect, up to the requireddesign test load.4.The load achieved is indicated in the calibrated pressure gauge, usually expressed in KiloNewtons (kN)for ease of load determination. During or at the end of the loading, the achieved load and the modeof failure, if any, are recorded in the field test record form. The recorded field test record form shall beacknowledged by all parties present, namely the tester, the contractor and the consultant and shallform part of the final test report to be submitted to the contractor for filing purpose.TEST SETUP (N.T.S.)Wedge SystemHydraulic JackSystemLoadingFrameRamset Epcon G5with installed rebar* For different diameters of anchors,the dimensions of the hollow jack may varyDIMENSION OF HOLLOW JACKRamset EpconG5TM6

M AT E R I A L S A F E T Y DATA S H E E TPAGE 1 OF 2G5CONCRETE ANCHORING SYSTEMSProduct Name: G5 Epoxy AdhesiveDescription: Part A: Epoxy Resin Part B: Amine HardenerGeneral Use: Chemical anchor used for commercial construction.Manufacturer: ITW Red Head · 2171 Executive Drive, Suite 100 · Addison, IL 60101Emergency Number: 1-800-424-9300Ingredients and Exposure LimitsIngredientsCAS NumberTLV:Part A: Bisphenol A Epoxy Resin25068-38-6NEPart B: Amine Blend*NEMATERIAL SAFETYDATA SHEETDate Prepared: July, 2007PEL:NENESTELNENE* An asterisk indicates a substance whose identity is a trade secret of our supplierAbbreviations: TLV ACGIH Threshold Limit ValueNA Not ApplicableSpecific GravityBoiling PointWater SolubilityPEL OSHA Permissible ExposureNE None EstablishedSTEL Short Term Exposure LimitPhysical PropertiesPart A: Beige PastePart B: Gray Paste 1.2 g/cm3 (at 20 C) 400 FNone 1.7 g/cm3 (at 20 C) 212 FNoneSafe Handling ProceduresHandling and Storing Precautions: For professional use only. Keep away from children. Avoid contact with theeyes and skin. Wash after using and before eating or smoking. Avoid breathing vapors. Use only as directed; avoiduncontrolled mixing with other materials, esp. polymerizable or combustible materials.Storage: For maximum shelf life, store in a cool dry area between 40 F and 80 F. Do not store above 110 FSpill Procedures: Collect with an absorbent material and place in a container for proper disposal. For large spills,transfer to salvage vessels, and dispose of according to state, local and Federal regulations. Flush area with water toremove residue.Personal ProtectionVentilation: Use in well ventilated areas.Eye Protection: Wear safety glasses with side shields.Skin Protection: Impermeable (neoprene or rubber) gloves are recommended.Respiratory Protection: None normally required. Where ventilation is inadequate to control vapors, use aNIOSH/OSHA approved respirator with organic vapor cartridges. Do not enter confined spaces without anappropriate air supplied respirator.Health InformationPart A: Eye and skin irritant. Possible skin sensitizer. May be irritating to eyes, skin, nose and throat.Part B: Corrosive. May cause eye and skin burns. Vapors may be irritating. May cause burns if swallowed.Routes of Exposure: Contact. Inhalation.Medical Conditions Aggravated by Exposure: Eye, skin and respiratory conditions.Carcinogenicity: No ingredients are classified as carcinogens by IARC, NTP or OSHAHazard Categories: Immediate health hazard; delayed health hazardFirst Aid MeasuresEyes: Flush immediately with water for at least 15 minutes. Seek medical advice.Skin: Wash immediately with soap and water. Launder contaminated clothing before reuse.Inhalation: If symptoms occur, move to fresh air. Call a physician if symptoms persist.Ingestion: Rinse mouth and then drink large quantities of water. Don’t give anything by mouth to an unconsciousperson. Seek medical attention. Do not induce vomiting unless directed by a physician.Other: Referral to a physician is recommended if there is any question about the seriousness of the exposure.1 of 2G5 Epoxy AdhesiveRamset EpconG5TM7

M AT E R I A L S A F E T Y DATA S H E E TPAGE 2 OF 2CONCRETE ANCHORING SYSTEMSG5MATERIAL SAFETYDATA SHEETStability and ReactivityStability: StableHazardous Polymerization: Will not occur.Incompatibility: Strong acids and oxidizing agents.Decomposition Products: Thermal decomposition can yield COx, NOx, water and carbon.Conditions to Avoid: Avoid elevated temperatures which may shorten the shelf-life of this product.Fire and Explosion Hazard InformationFlash point: 212 FFlammable Limits: Not applicableExtinguishing Media: CO2, Dry Chemical, Foam, and Water Spray.Special Fire Fighting Procedures: Use self-contained breathing apparatus.Unusual Fire and Explosion Hazards: Thermal decomposition products can be formed including carbonmonoxide, sulfur and nitrogen oxide and other fumes and vapors.Material will not burn unless pre-heated. Do not enter confined space without full bunker gear. Firefighters shoulduse self-contained breathing apparatus and protective clothing.Federal Regulatory StatusRegulatory InformationHazard Communication: This MSDS has been prepared in accordance with the federal OSHA HazardCommunication Standard 29 CFR 1910.1200.HMIS Codes: Health 3, Flammability 1, Reactivity 0, PPE BDOT Shipping Name: Consumer commodity, ORM-DUN#: 2735Hazard Class: 8 CorrosivesEmergency Response Guide #153TSCA Inventory Status: Chemical components are listed on TSCA inventory or are exempt as impurities.SARA Title III, Section 313: This product contains an Amine Blend which is subject to reporting underSection 313 or SARA Title III (40 CFR Part 372).EPA Waste Code(s): Not regulated by EPA as a hazardous waste.Waste Disposal Methods: If this material becomes a waste, it would not be hazardous waste by RCRA criteria(40CFR261). Dispose according to federal, state and local regulations.Canadian Regulations: WHMIS hazard class: D2B.Canadian EPA: All ingredients are listed on the DSL or are exempt as impurities.The information and recommendations in this document are based on the best information available to us at thetime of preparation. We make no other warranty, expressed or implied, as to its correctness or completeness, or asto the results or reliance of this document.Ramset EpconG5TM2 of 2G5 Epoxy Adhesive8

DESIGN GUIDEPAGE 1 OF 9REBAR (FE460)Ramset EpconG5TM9

DESIGN GUIDEPAGE 2 OF 9REBAR (FE460)T10T12T13T20Ramset EpconG5TM10

DESIGN GUIDEPAGE 3 OF 9REBAR (FE460)Ramset EpconG5TM11

DESIGN GUIDEPAGE 4 OF 9REBAR (FE460)Ramset EpconG5TM12

DESIGN GUIDEPAGE 5 OF 9REBAR (FE460)Ramset EpconG5TM13

DESIGN GUIDERAMSET EPCON GRANITE 5Rebar (FE460)PAGE 6 OF 9REBAR (FE460)INSTALLATION IN G40 REINFORCED CONCRETERebar Ø (mm)Hole Ø (mm)Design Yield, NRd,s -52502.7Lb,rqd (mm)125145160200250300340455640n Lb,rqd/Rebar ØLb 321.7Chemical anchorsDesign embedment depth Lb,rqd and Design Tensile Load Table NRd338.1359.0397.4414.8453.1502.7Safety Factor for Bond γB 1.8Safety Factor for Concrete γΜc,N 1.5Safety Factor for Steel γΜs,N 1.15Min Edge Distance is based on 30mm concrete coverTensile development length Lb using Epcon G5:where the FRd NRd,s:Lb L b ,rqdfB fBConcrete GradeC16/20C20/25C25/30C30/37FRdN Rd , sINFLUENCE OF CONCRETEfB0.810.901.001.10Concrete mset EpconG5TM14

DESIGN GUIDEPAGE 7 OF 9REBAR (FE460)Ramset EpconG5TM15

DESIGN GUIDEPAGE 8 OF 9REBAR (FE460)Ramset EpconG5TM16

DESIGN GUIDEPAGE 9 OF 9REBAR (FE460)Ramset EpconG5TM17

DESIGN GUIDEPAGE 1 OF 4ZINC COATED ANCHOR STUD(G5.8) / CHEMSET Ramset EpconG5TM18

DESIGN GUIDEPAGE 2 OF 4ZINC COATED ANCHOR STUD(G5.8) / CHEMSET Ramset EpconG5TM19

DESIGN GUIDEPAGE 3 OF 4ZINC COATED ANCHOR STUD(G5.8) / CHEMSET Ramset EpconG5TM20

DESIGN GUIDEPAGE 4 OF 4ZINC COATED ANCHOR STUD(G5.8) / CHEMSET Ramset EpconG5TM21

DESIGN GUIDEPAGE 1 OF 4ZINC COATED ANCHOR STUD(G8.8) / CHEMSET Ramset EpconG5TM22

DESIGN GUIDEPAGE 2 OF 4ZINC COATED ANCHOR STUD(G8.8) / CHEMSET Ramset EpconG5TM23

DESIGN GUIDEPAGE 3 OF 4ZINC COATED ANCHOR STUD(G8.8) / CHEMSET Ramset EpconG5TM24

DESIGN GUIDEPAGE 4 OF 4ZINC COATED ANCHOR STUD(G8.8) / CHEMSET Ramset EpconG5TM25

DESIGN GUIDESTAINLESS STEEL ANCHOR STUD(SS316) / CHEMSET PAGE 1 OF 4Ramset EpconG5TM26

DESIGN GUIDESTAINLESS STEEL ANCHOR STUD(SS316) / CHEMSET PAGE 2 OF 4Ramset EpconG5TM27

DESIGN GUIDESTAINLESS STEEL ANCHOR STUD(SS316) / CHEMSET PAGE 3 OF 4Ramset EpconG5TM28

DESIGN GUIDESTAINLESS STEEL ANCHOR STUD(SS316) / CHEMSET PAGE 4 OF 4Ramset EpconG5TM29

T E S T R E P O R T S A N D A P P R O VA L SRamset EpconG5TM30

T E S T R E P O R T S A N D A P P R O VA L SRamset EpconG5TM31

T E S T R E P O R T S A N D A P P R O VA L SRamset EpconG5TM32

T E S T R E P O R T S A N D A P P R O VA L SRamset EpconG5TM33

T E S T R E P O R T S A N D A P P R O VA L SRamset EpconG5TM34

T E S T R E P O R T S A N D A P P R O VA L SRamset EpconG5TM35

T E S T R E P O R T S A N D A P P R O VA L SITW Construction Products ( SEA ) Pte Ltd8 Kaki Bukit Road 2, #02-34 Ruby Warehouse ComplexSingapore 417841Dear SirAPPLICATION FOR LISTING IN HDB'S MATERIALS LIST - STRUCTURALPRODUCTSWe refer to your application dated 17 March 2011.2. We have no objection for the following product to be listed in the Building & InfrastructureDepartment's internet website, http://www.eptc.sg under HDB's Materials List (ML): Section : Structural ProductsClassification : Anchor Bolt (for G20 concrete & above)Product : Medium Duty Mechanical AnchorBrand / Model : Ramset, Trubolt M12x120Section : Structural ProductsClassification : Anchor Bolt (for G20 concrete & above)Product : Heavy Duty Mechanical AnchorBrand / Model : Ramset, Triga Z Type V, M12x130Section : Structural ProductsClassification : Anchor Bolt (for G20 concrete & above)Product : Cartridge Injection Chemical AnchorBrand / Model : Ramset Epcon G5, M12x160Section : Structural ProductsClassification : Anchor Bolt (for G20 concrete & above)Product : Cartridge Injection Chemical AnchorBrand / Model : Ramset Epcon G5 M10x1303. The listing in HDB's ML is subject to the following conditions:a) HDB reserves the right to review the performance and testing requirements at any time.b) The listing in our ML does not relieve you the responsibility for the due performance of the productand compliance with HDB project specifications and drawings. Your product will be removed fromthe ML should we discover any lapse in quality standard or product performance.c) None of the product's part, mixture, chemical constituents or brands name shall be altered. Anysuch alteration without prior acceptance by HDB will lead to automatic suspension of the productfrom the ML when discovered.d) The supplier shall inform HDB if there is any change of the manufacturer or production plantlocation.e) Name of HDB or contents of this letter must not be used or quoted in any forms of advertisement,brochure or publication of the product.f) Your product may be subjected to site or factory sampling test. Following the product sampling byour officers, you are required to send the sample for laboratory testing. All testing cost incurred shallbe borne by you. The test report can be submitted for renewal applications.4. The listing for this product will expire on 31 May 2014. Please apply for renewal of this listing 3months before the expiry date.5. Please contact Senior Technical Officer Mr. Wu Ser Luen at Tel No: 64902548 if you need any1further information or clarification.Yours faithfullyTham Yew CheongSenior Executive Building OfficerBuilding & Infrastructure DepartmentHousing & Development BoardRamset EpconG5TM36

PROJECT REFERENCESPROJECTAPPLICATIONCONTRACTORMRT A&A DSMRT545K0Circle Line C822Circle Line C823Circle Line C828Circle Line C853Circle Line C856Circle Line C8282Downtown line C901Downtown line C905Downtown line C907Downtown line C909Downtown line C912Downtown line C929ADowntown line C935Downtown line 3 C923Downtown line 3 C933Tuas MRT ExtensionBridge Upgrading RD111Bridge Upgrading RD113Bridge Upgrading RD138Bridge Upgrading RD107Bridge Widening RD104RD145KPE C421KPE C424KPE C425KPE C426ER102C114 Bridge WalkwayBM101 Bridge WalkwayPPSE C3223ATerminal 3TRANSPORTATION FACILITIESSquare Steel Hollow Section FixingStarter bar – beams / slabsStrut FixingBracket FixingStarter bar - slabsStarter bar – slabsStarter bar – slabsStarter bar – slabsStarter bar - slabsStarter bar - slabsStarter bar - slabsStarter bar - slabsStarter bar - slabsStarter bar - slabsStarter bar - slabsStarter bar - slabsStarter barStarter bar – beamsStarter bar – beamsStarter bar – beamsStarter bar – beams / slabStarter bar – beams / slabStarter bar – beamsStarter bar – slabsStarter bar – slabsStarter bar – slabsStarter bar - slabsStarter barCovered walkway postsCovered walkway postsRailings FixingsRailings FixingsOKH ConstructionEcon-NCC JVNishimatsu-LumChang JVGin Lee ConstructionTaisei CorporationSembawang E&CChye Joo ConstructionHock Lian SengShimizuWai Fong ConstructionVSLLum Chang Building ContractorsNishimatsuLeighton Offshore / John HollandSamsung C & T CorporationPenta Ocean Construction Co LtdShanghai TunnelSingapore Piling & Civil EngineeringSingapore Piling & Civil EngineeringSingapore Piling & Civil EngineeringChye Joo ConstructionChye Joo ConstructionChye Joo ConstructionSembcorp E&CTaisei CorporationChan & Chan ConstructionChye Joo ConstructionSato Kogyo (S)Diethelm SingaporeWin Kiong Engineering ServiceUnited Central EngineeringUnited Central EngineeringGOVERNMENT BUILDINGSNew Supreme CourtStarter bar - CBP WallRedevelopment of Singapore Museum Starter bar - columnsSingapore Arts CentreStarter bar - slabsNew Civil Service Club, Bukit BatokStarter bar – beamsLaw Enforcement Agency SingaporeStarter bar – CBP wallSato Kogyo (S)Sato Kogyo (S)Sato Kogyo (S)Lian Soon ConstructionLian Soon ConstructionTiong Seng ConstructionRamset EpconG5TM37

PROJECT REFERENCESPROJECTAPPLICATIONCONTRACTOREDUCATION FACILITIESYishun Secondary SchoolStarter bars – cantilever slabsNanyang Junior CollegeStarter barVictoria SchoolStarter barChangkat Primary SchoolStarter barSaint Andrew Village A&AStarter barNTU School of Biological ScienceStarter barRaffles Junior CollegeStarter bar – cantilever staircaseEunos Primary SchoolStarter barDunman Secondary SchoolStarter barNTU Teaching & Laboratory FacilitiesStarter barSMUStarter barQueenstown Secondary SchoolStarter barMaha Bohdi SchoolStarter barAustralia International SchoolStarter bar – slab extensionYong Loo Lin School of Medcine (NUS)St. Andrew Autism CentrePrince Charles Primary SchoolNgee Ann PolytechnicSIT at Singapore PolytechnicYale-NUS CollegeCo LtdPUBLIC WATER FACILITIESChangi Water Reclamation PlantStarter bar – Diaphragm Wall / slabsDeep Tunnel SystemNew Water PipelinePipeline Bracket FixingsLian Soon ConstructionQuek Hock Seng ConstructionKay Lim Construction & TradingKay Lim Construction & TradingSEF ConstructionChina Construction (SP)China Construction (SP)Guan Ho Construction Co.Chiu Teng ConstructionChiu Teng ConstructionSato Kogyo (S)Koon Seng ConstructionQuek Hock Seng ConstructionChiu Teng Enterprise BCEG JVG. James SingaporeLian Soon ConstructionKian Hiap ConstructionKwan Yong Construction Pte LtdKwan Yong Construction Pte LtdKoon Seng Construction Pte LtdSsangyong Engineering & ConstructionLTH EngineeringSembcorp E&CSingapore Piling & Civil EngineeringKoh Brothers ConstructionSembcorp E&CToh Ban Seng ContractorHSC Pipeline EngineeringRamset EpconG5TM38

PROJECT REFERENCESPROJECTAPPLICATIONCONTRACTORRESIDENTIAL BUILDINGSHamilton ScottsStarter bar - beam / slabsCompassvale ViewStarter bar - beam / columnsFernvale VistaStarter bar - beam / columnsHDB Punggol C5AStarter bar – slabs / pilecapsHDB Sengkang N2C36HDB Punggol W C7Starter bar - beamHDB Seng Kang N4C24BTO at PunggolLUP42AStarter bar – slab / wallWater BayTopiaryCaribbeanBracket FixingSaint Regis Hotels & ApartmentsStarter bar – CBP wall / slabs / beamsRiveriaStarter barNewton SuiteStarter barAdmore ParkStarter bar – slabsThe MetzEvelynRiverEdgeStarter bar – slabsHillview RegencyPaterson ResidenceStarter bar – CBP wallOne AmberStarter bar - CBP WallThe ChuanStarter bar – CBP wallOrange Groove CondominiumStarter bar – CBP wall / slabsLa-Belle Townhouse2rvgStarter bar – CBP wall / slabsNo.11 Astrid HillBalestier Scenic HeightsSolitaire CondominiumStarter bar–retaining wall/slab/beamDraycott CondominiumStarter slab – CBP wallNova 88 CondominiumNova 48 CondominiumHalia Cluster HousingAlexis CondominiumStarter slab – CBP wallD’Leedon CondominiumStarter barLeedon HeightsStarter barEuHabitatStarter barYTL WestwoodStarter barRiver IsleStarter barA Treasure TroveStarter barWest Shore ResidencesStarter barYau Lee ConstructionQingdao ConstructionQingdao ConstructionKay Lim ConstructionKay Lim ConstructionKay Lim ConstructionQingJian InternationalPoh Cheong Concrete Product Pte. Ltd.Hock Guan CheongQingJian InternationalQingJian InternationalYodai Windows System EngineeringKajima-Tiong Seng JVChip Eng Seng Contractors (1988)Kajima Overseas AsiaShimizu CorporationShimizu CorporationShimizu CorporationTiong Seng ContractorsPoh Lian ConstructionChina Construction (SP)China Construction (SP)Low Keng Huat (S)Wee Hur ConstructionWai Fong ConstructionChiu Teng EnterprisesDaiya Engineering & ConstructionDbcorp IndustriesPoh Lian ConstructionTiong Seng ContractorsAdmin ConstructionAdmin ConstructionGTMS ConstructionKian Hiap ConstructionWoh Hup (Private) Ltd.Woh Hup (Private) Ltd.Woh Hup (Private) Ltd.YTL Construction (S) Pte. Ltd.NQCSim Lian Construction Co. Pte. Ltd.Ang Cheng Guan Construction Pte. Ltd.Ramset EpconG5TM39

PROJECT REFERENCESPROJECTAPPLICATIONFACTORIESJTC Factory 161 Kallang WayLight Industrial Factory @ Jalan Kilang Starter bar - CBP wallMicron (MSA 1.5 Project)Project EurekaPan Tech Industrial BuildingBiopolisBracket fixingBTR SingaporeAdhesive for Anchor BoltsSilo Plant at Jurong Port RoadCONTRACTORInterpoV3 ConstructionSato Kogyo (S)Kajima Overseas AsiaWin Kiong Engineering ServiceInnoVision FaçadeHiap Seng Engineering LtdYTL Construction (S) Pte. Ltd.COMMERCIAL OR MIXED DEVELOPMENTSouth Beach Mixed DevelopmentStarter bar - beamsHyundai E & CDoo Song Construction Co LtdMarina Bay Sands Integrated Resorts Starter bar - CBP Wall/Slabs/BeamsSato Kogyo (S)Sembawang E&CShanghai TunnelL & M FoundationOG Complex A & AStarter barsWing TuckOne Raffles QuayStarter bar – slabs / beamsObayashi CorporationGammon SkanskaHilton HotelTemporary worksHock Keng HengHSBCThreaded studs for Temporary Works Hock Keng HengMercedes ShowroomStarter bar – beams / slabsGammon SkanskaGinza Plaza A&AStarter barVigcon ConstructionSomerset UOL BuildingCBP WallKajima Overseas AsiaScotts SquareShimizu CorporationPaya Lebar SquareStarter barsLow Kheng Huat (S)UOB CentreA&AGennal IndustriesTET Engineering & Metal WorksBugis JunctionA&ATET Engineering & Metal WorksRamset EpconG5TM40

PROJECT REFERENCESPROJECTAPPLICATIONCONTRACTORMARINE WORKSPSA Tanjong Pagar Reefer WharfPSA Tanjong Pagar Slab UpgradingStarter bar – slabsPSA Brani TerminalStarter bar – beamsLoyang Marine BaseStarter barJurong ShipyardStarter barPSA Beam StrengtheningStarter bar – beamsOTHERSSports HubStarter bar - slabs / beamsGardens by the BayStarter barPasir Ris Sports HubStarter bar - beamsNg Teng Fong HospitalStarter bar - beamsMerlion ParkMohd. Sultan Road Art CentreBuddha Tooth TempleStarter bar – CBP wall / beamsSingapore FlyersStarter barSentosa Cove Bus TerminalRoad kerbArt & Science MuseumStarter barSP Power Grid EW3Eng Lee EngineeringUnited SpecialistUnited SpecialistDGSJurong EngineeringMuhibbah Engineering (S’pore)DragagesQuek Hock SengPenta OceanAntara KohBuilding Structural InspectionSato Kogyo (S)TakenakaGammonPenta Ocean CorporationNishimatsu Construction & KTC JVRamset EpconG5TM41

Ramset TM EpconG5 7 CONCRETE ANCHORING SYSTEMS Product Name: G5 Epoxy Adhesive Date Prepared: July, 2007 Description: Part A: Epoxy Resin Part B: Amine Hardener General Use: Chemical anchor used for commercial construction. Manufacturer: ITW Red Head · 2171 Executive Drive, Suite 100 · Addison, IL 60101 Emergency Number: 1-800-424-9300

Related Documents:

COMPATIBLE GARAGE DOOR OPENERS / KOMPATIBILNÉ OTVÁRAČE GARÁŽOVÝCH DVERÍ . Polaris 500 Polaris 502 Polaris 700 Polaris 702 Power Master CSG . ROGER H70-103AC ROSSI DZ3 SK Ramset RAM 100 Ramset RAM 1000 . Ramset RAM 300 Ramset RAM 5500 Ramset Star 24 SEA GATE 2 DG RYTEC S

4 WWW .RAMSET .COM Ramset LEED Credit MR 5.1 MR 5 .1 was developed with the intent to increase demand for building materials an

RAM 5000 UL - 5100 UL - 5200 UL www.ramsetinc.com 5 RAMSET GENERAL SPECIFICATIONS: EMERGENCY RELEASE: CHAIN RELEASE. BBS: OPTIONAL BATTERY BACK-UP SYSTEM. RPI-120: OPTIONAL POWER INVERTER IS ALSO AVAILABLE ON RAM 5000 UL ONLY. MODEL: RAM 5000 UL RAM 5100 UL RAM 5200 UL Max. Gate Length: 40 feet 40 feet 40 feet Max. Gate Weight: 1000 lbs. 2000 lbs. 3500 lbs. Cycles: Continuous Continuous Continuous

this tool is for use only by licensed operators. you must obtain a license before using it. a tool operator's card will be issued to you after successfully completing the enclosed exam and returning it to receive your card and activate your warranty. operator's license can also be obtained at: www.ramset.com low velocity powder actuated tool

LOW VELOCITY POWDER ACTUATED TOOL Operator's Instruction & Training Manual The MasterShot is a low velocity piston type fastening tool. It is designed for use with Ramset .22 caliber CW powder loads and Ramset fasteners. Do not operate the MasterShot before studying this manual carefully and thoroughly understanding the material .

Uses Powers Fasteners, Inc. part number 50032. For minimum fastener embedment depths in steel or concrete, please consult www.powers.com. Pre-assembled drive pin from Powers Fasteners, Inc. works with SPIT P200, P45, P60; Ramset TS750P, TS60P; Hilti DX36M, DX350, DX351,

a. Expansion Anchors to be Hilti Kwik Bolt 3, ITW Redhead Trubolt, or approved equal. Sleeve anchors to be Hilti HLC Sleeve Anchor or ITW Redhead Dynabolt. b. Epoxy or chemical adhesive shall be Ramset Epcon A7 or C6;

1 The purpose of the Coronavirus Bill is to enable the Government to respond to an emergency situation and manage the effects of a Covid-19 pandemic. A severe pandemic could infect up to 80% of the population leading to a reduced workforce, increased pressure on health services and death management processes. The Bill contains temporary measures designed to either amend existing legislative .