MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1SECTION 1200ITEM NO1200B12.01DESCRIPTIONQUANTITYRATEAMOUNT-ProvSumR 20 000,00%R 20 000,00GENERAL REQUIREMENTS AND PROVISIONS(i)(ii)B12.02UNITPayment of community liason officerHandling costs and profit in respect of B12.01(i)aboveStructured Trainning(as specified in part D of the project specification)(a)Generic Skills-ProvSumR 30 000,00(b)Entrepreneural Skills-ProvSumR 30 000,00(d)Provision of training venue (only if required)-LumpSum(e)Provision of a Health and Safety ConsultantProvSum(c)Handling costs and profit in respect of sub-items %(a) and (b) aboveR 160 000,00R 220 000,00Protection, removal,relocation and replacement ofUtility services.PS12.05(a) Utility services(i)Protection, removal,relocation and replacementof utility services.(ii)Handling costs and profit in respect of sub-items(a) (i) abovePC Sum%R 250 000,00Contractor's initial obligation in respect of the OHSAct and Construction RegulationsL/Sum1,00Contractor's Time related Obligations in respect of theOHS Act and Construction RegulationsMonth4,00Submission of Health and Safety FileL/Sum1,00Payment to affected land owners or toSubcontractorsL/SumR 1,00Handling cost and profit in respect of sub item (i) above%R 20 000,00PC Sum250 000,0020 000,00R 20 000,00PC Sum325 000,00B12/C1.1B12/C1.2B12/C1.3Compesation to Land OwnersB12/C1.4(a)Provisional Sum for payment of specialised servicesB12/C1,5Handling cost and profit in respect of sub item (i) aboveTOTAL CARRIED TO SUMMARY1200C2.2.2PC Sum%R 325 000,00

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1SECTION 1300ITEMNODESCRIPTION1300CONTRACTOR'S ESTABLISHMENT ON SITEAND GENERAL OBLIGATIONS13,01The Contractor's general obligations:1300UNIT QUANTITYRATE(a)Fixed obligations-lumpsum(b)Value-related obligations-lumpsum(c)Time-related obligationsmonth4TOTAL CARRIED TO SUMMARYC2.2.3AMOUNT

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1SECTION 1400ITEMNODESCRIPTIONUNITQUANTITYRATE1400 HOUSING, OFFICES AND LABORATORIESFOR THE ENGINEER'S SITE PERSONNEL14.01 Office and laboratory accommodation:(a)Offices (interior floor space only)m²50(e)Ablution unitsm²2014.02 Office and laboratory furniture:(a)Chairsnumber20(d)Desks, complete with drawers and locksnumber2(f)Conference tablesnumber114.03 Office and laboratory fittings, installations andequipment:(a)Items measured by number:(i)220/250 volt power pointsnumber4(iii)Double 80 watt fluorescent-light fittingscomplete with ballast and tubesnumber2Single incandescent-light fittingscomplete with 100 watt globesnumber1Wash-hand basins complete with tapsand drainsnumber1Fire extinguishers, 9,0 kg all purposedry powder type, complete, mountedon wall with bracketsnumber2Air-conditioning units with, 2,2 kWminimum capacity, mounted and withown power connectionnumber2(xiv) General-purpose steel cupboards withshelvesnumber2(xv) Steel filing cabinets with drawersnumber2-Prov(v)(vi)(x)(xi)(b)Prime-cost items and items paid for in a lumpsum(v) The provision of a fax apparatus asspecified1400SumTOTAL CARRIED FORWARDC2.2.4AMOUNT

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1ITEMNODESCRIPTIONUNITQUANTITYnumber4Provisional Sum for providing rentedhousing, hotel or other accommodation asdescribed in Subsubclause 1403(c)(ii)-ProvHandling costs and profit in respect ofsubitem 14.07(a)%R 20 000,00month4RATEAMOUNTBrought forward14.04 Car-ports14.07 Rented, hotel and other accommodation:(a)(b)14,10 Provision of photostat facilitiesSumR 20 000,00B14.11 Telecommunications System(a)Supply (1)Cellular Phone-LumpSumR 15 500,00(c)Costs of calls by Engineer-PCSumR 6 000,00(d)Handling costs and profit in respect ofsubsubitem 14.11(a), (c) above%R 21 500,00(e)Provision of Laptop for the use of Engineer.-LumpSumR 25 000,00Handling costs and profit in respect ofsubsubitem 14.11(a), (c) above%R 25 000,00Provision of an A3 Colour printer, including allconsumables.-LumpSumR 8 000,00Handling costs and profit in respect ofsubsubitem 14.11(a), (c) above%R 8 000,00Provision of digital camera.-LumpSumR 3 000,00Handling costs and profit in respect ofsubsubitem 14.11(a), (c) above%R 3 000,00(f)(g)1400TOTAL CARRIED TO SUMMARYC2.2.5C2.2.4

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1SECTION 1500ITEMNODESCRIPTION1500ACCOMMODATION OF TRAFFIC15,01Accommodating traffic and maintainingtemporary deviations15,02B15.03UNITQUANTITYkm2,00Earthworks for temporary deviations:(a)Shaping of temporary deviationskm1,50(b)Cut and borrow to fillm³50,00(c)Cut to spoilm³50,00Temporary traffic-control facilities:(a)Flagmenman-day400,00(b)Portable STOP and GO-RY signsnumber4,00(e)Road signs, R- and TR-series, (size indicated)number8,00(f)Road signs, TW-series, (size indicated)number5,00(g)Road signs, STW-, DTG-, TGS- and TGseries (excluding delineators and barricades)m²10,00(h)Delineators (DTG50J):(i)Singlenumber15,00(ii)Mounted back to backnumber7,00number7,00(j)Traffic cones 600mm(l)Movable barriers (type indicated)No2,00(n)Safety jackets and hatsNo2,0015.04Relocation of traffic-control facilitiesLumpSum15.05Gravelling and repair of temporary deviationsand existing gravel shoulders used astemporary deviations:Temporary deviationsm³40,0015.06Watering of temporary deviationskilolitre800,001500TOTAL CARRIED TO SUMMARY(a)C2.2.6RATEAMOUNT

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1SECTION 1500ITEMNODESCRIPTIONUNITQUANTITYRATEAMOUNTBrought forward15.0715.08B15.101500Blading by road grader of:(a)Temporary deviationskm-pass2,0(b)Existing roads used as temporary deviationskm-pass2,0-Provkm0,8Repairs, alterations and/or additions toexisting roads used as temporary deviationsAccommodating traffic where the road is constructedin half widths.TOTAL CARRIED TO SUMMARYC2.2.7SumRate Only

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1SECTION 1600ITEMNODESCRIPTION1600OVERHAUL16,02Overhaul on material in excess of 1.0 km (ordinaryoverhaul)1600TOTAL CARRIED TO SUMMARYUNITm3-kmQUANTITY10 362,50RATEAMOUNT

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1SECTION 1700ITEMNODESCRIPTION1700CLEARING AND GRUBBING17,01Clearing and grubbing17,02Removal and grubbing of large trees and treestumps(a)1700Girth exceeding 1 m up to and including 2mTOTAL CARRIED TO SUMMARYC2.2.9UNITQUANTITYha0,5No2RATEAMOUNT

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1SECTION UNTDAYWORKSLabourers:(i)Unskilledh-Rate Only(ii)Semi-skilledh-Rate Only(iii)Skilledh-Rate OnlyB18.02Foremanh-Rate OnlyB18.03Tipper trucks:(i)3 - 5 tonh-Rate Only(ii)h-Rate Only5.1 - 10 tonB18.04Loader (0,5m³)h-Rate OnlyB18.05Grader (CAT 140G or similar)h-Rate OnlyB18.06LDVkm-Rate OnlyB18.07Compaction rollers:B18.08(i)Vibratory rollerh-Rate Only(ii)Tamping rollerh-Rate Only(iii)Grid rollerh-Rate OnlyHand controlled compactors(i)Pedestrian roller (Bomag BW90)h-Rate Only(ii)Vibratory plateh-Rate Only(iii)Rammersh-Rate OnlyB18.09Water truck (min. 10000litre)h-Rate OnlyB18.10Dozer (D7 or similar)h-Rate Only1800TOTAL CARRIED TO SUMMARYC2.2.10

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1ITEMNODESCRIPTIONUNITQUANTITYm720,00Prefabricated mountable kerb, SABS 927fig 7, as shown on the Drawingsm5,0Prefabricated mountable kerb, SABS 927fig 3, as shown on the Drawingsm5,0Edge beam (200mm deep x 200 wide mm)m³5,0m³5,0(1) F1 Surface finishm²1(2) F2 Surface fininshm²12300CONCRETE KERBING, CONCRETECHANNELLING, CHUTES AND DOWNPIPES,AND CONCRETE LININGS FOR OPEN DRAINS23.01Concrete kerbing:(a)(i) Prefabricated mountable kerb, SABS 927fig 8c, as shown on the Drawings(ii)(iii)(ii)23,04 Cast in situ concrete chutes (measured by components):(a) Concrete(1) Class 20/19(b) Formwork23,0723,08Trimming of excavations for concrete-lined opened drains:(a)In soft materialm²5(b)In hard materialm²0Cast insitu concrete lining ( V and trapezoidal drain) including m³formwork.Class U2 surface finish to cast in situ concrete(trapezoidal drain)m²71Concrete lining for open drains:(a)(b)23,10Sealed joints in concrete linings of open drains(Polysulphide sealants)710m40,00kg1404,0023,11 Concrete screed or backfill below chutes(b) Class 20/1923,12Steel reinforcement(a)2300Welded steel fabric ref 195TOTAL CARRIED FORWARD TO SUMMARYC2.2.15RATESECTION 2300AMOUNT

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1SECTION 3100ITEMNODESCRIPTION3100BORROW MATERIALS31.01Excess overburden31.03Finishing-off borrow areas in:3100UNITQUANTITYm³1 000(b)Intermediate materialha1,0(c)Soft materialha1,0TOTAL CARRIED TO SUMMARYC2.2.16RATEAMOUNT

CHOOL PHASE 1

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1SECTION 3200ITEMNODESCRIPTIONUNIT QUANTITY3200SELECTION, STOCKPILING AND BREAKINGDOWN THE MATERIAL FROM BORROW PITS,CUTTINGS AND EXISTING PAVEMENTLAYERS, AND PLACING AND COMPACTINGTHE GRAVEL LAYERS32.06Stockpiling of material3200TOTAL CARRIED TO SUMMARYm³C2.2.171 756RATEAMOUNT

CHOOL PHASE 1

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1SECTION 3300ITEMNODESCRIPTIONUNITQUANTITYCompacted to 90% of modifiedAASHTO densitym³3 916,5Rock fill (as specified in subclause 3209c)m³4003300MASS EARTHWORKS33,01Cut and borrow to fill, including free-haul up to0,5 km:(a)33.0333.04Extra over item 33.01 for excavating andbreaking down material in:(a)Intermediate excavationm³450(b)Hard rock excavationm³1 371m³3 201Cut to spoil, including free-haul up to 0,5 km.Material obtained from:(a)33.07B33.203300In layer thicknesses exceeding 200 mm:(i)Stable materialm³105(ii)Unstable materialm³126m³864Roadbed preparation and the compaction ofmaterial:(a)33.13Soft excavationRemoval of unsuitable material (includingfree-haul of 0,5 km):(b)33.10AMOUNTMaterial in compacted layer thicknessesof 200 mm and less:(i)(c)RATECompaction to 90% of modified AASHTOdensityFinishing-off cut and fill slopes(a)Cut slopesm²7 500(b)Fill slopesm²750m³Rate OnlyReshaping the road formation with material obtainedfrom the road reserve and compacted to 90% ofmodified AASTHO densityTOTAL CARRIED TO SUMMARYC2.2.18Rate Only

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1SECTION 3400ITEMNODESCRIPTION3400PAVEMENT LAYERS OF GRAVEL MATERIAL34.01Pavement layers constructed from graveltaken from cut or borrow including free-haulup to 1,0 km:(a)m³90095% of modified AASHTO density for acompacted layer thickness of 150 mmm³844m³788Base Course(iii)340093% of modified AASHTO density for acompacted layer thickness of 150 mmGravel subbase compacted to:(ii)(d)QUANTITYGravel Selected layer compated to:(i)(c)UNIT97% modified AASHTO in 150mmTOTAL CARRIED TO SUMMARYC2.2.19RATEAMOUNT

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1SECTION 3500ITEMNODESCRIPTIONUNIT QUANTITY RATE3500STABILIZATION35.01Chemical stabilization extra over unstabilizedcompacted layers:(c)35.02Gravel base, 150 mm thick*m³788t62kl120Chemical stabilizing agent:(a)Ordinary Portland cement35,04Provision and application of water for curing3500TOTAL CARRIED TO SUMMARYC2.2.20AMOUNT

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1SECTION 4100ITEMNODESCRIPTION4100PRIME COAT41.01Prime coat:UNITQUANTITY(a)Quick drying MSP tar primelitreRate Only(b)MC-30 cut-back bitumenlitre3375,00m²0,0041.02Aggregate for blinding4100TOTAL CARRIED TO SUMMARYC2.2.21RATEAMOUNTRate OnlyRate Only

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1SECTION 4200ITEMNODESCRIPTION4200ASPHALT BASE AND SURFACING42,02Asphalt surfacing(a) Continuosly medium graded (25mm thick).42,04PS42.084200Tack coat of 30% stable-graded emulsion.100mm cores in asphalt pavingUNITQUANTITYm²4 380l2 409No.5TOTAL CARRIED TO SUMMARYC2.2.22RATEAMOUNT

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1SECTION 5100ITEMNO5100DESCRIPTIONUNIT QUANTITYPITCHING, STONEWORK AND PROTECTIONAGAINST EROSIONLI 51.01 Stone pitching:(b) Grouted stone pitching 150 mm thickness5100TOTAL CARRIED TO SUMMARYC2.2.23m²50RATEAMOUNT

CHOOL PHASE 1C2.2.23

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1SECTION 5600ITEMNODESCRIPTION5600ROAD SIGNS56.01Road sign boards with painted or colouredsemi-matt background. Symbols, letteringand borders in semi-matt black or Class Iretro-reflective material, where the signboard is constructed from:(a)Area not exceeding 2 m²Class Im²10m30m³6m³3Road sign supports (overhead road signstructures excluded):(b)Timber, 150 mm dia treated with creosoteLI 56.05 Excavation and backfilling for road signsupports (not applicable to kilometre posts)560010Background of retro-reflective material:(i)LI56.06m²Extra over item 56.01 for using:(a)56.03QUANTITYAluminium sheet (2,0 mm thick):(i)56.02UNITExtra over item 56.05 for cement-treated soilbackfillTOTAL CARRIED TO SUMMARYC2.2.24RATEAMOUNT

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1SECTION 5700ITEMNODESCRIPTION5700ROAD MARKINGS57,02Retro-reflective road-marking paint:5700UNITQUANTITY(a)White line (100mm wide broken or unbroken)km0,71(b)Yellow line (100mm wide broken or unbroken)km0,30(d)White lettering and symbolsm²20,0TOTAL CARRIED TO SUMMARYC2.2.25RATEAMOUNT

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1SECTION 5900ITEMNODESCRIPTION5900FINISHING THE ROAD AND ROAD RESERVEAND TREATING OLD ROADS59,01Finishing the road and road reserve:(b)5900Single-carriageway roadUNITQUANTITYkm0,71TOTAL CARRIED TO SUMMARYC2.2.26RATEAMOUNT

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1SECTION 8100ITEMNODESCRIPTION8100TESTING MATERIALS AND WORKMANSHIP81.02Other special tests requested by the Engineer:8100UNITQUANTITYRATESum(a)Cost of testing-PC(b)Charge on Prime Cost Sum%65 000TOTAL CARRIED TO SUMMARYC2.2.27AMOUNTR 65 000,00

MOLEMOLE MUNICIPALITYCONTRACT NO:. TECH-004-2020/2021SURFACING OF ROAD LINKING KGWADI PRIMARY SCHOOL AND BOTLOKWA PRIMARY SCHOOL PHASE 1SUMMARY OF SCHEDULE OF QUANTITIES1200GENERAL REQUIREMENTS AND PROVISIONS .R1300CONTRACTOR'S ESTABLISHMENT ON SITE ANDGENERAL OBLIGATIONS. .R1400HOUSING, OFFICES AND LABORATORIESFOR THE ENGINEER'S SITE PERSONNEL .R1500ACCOMMODATION OF TRAFFIC R1600OVERHAUL .R1700CLEARING AND GRUBBING .R1800DAYWORKS R2300CONCRETE KERBING, CONCRETE CHANNELING, CHUTES AND DOWNPIPESAND CONCRETE LINING FOR OPEN DRAINS .RRates Only3100BORROW MATERIALS .R3200SELECTION, STOCKPILING AND BREAKING-DOWN THE MATERIAL FROMBORROW PITS, CUTTINGS AND EXISTING PAVEMENT LAYERS, ANDPLACING AND COMPACTING THE GRAVEL LAYERS .R3300MASS EARTHWORKS .R3400PAVEMENT LAYERS OF GRAVEL MATERIAL .R3500STABILIZATION .R4100PRIME COAT .R4200ASPHALT LAYER SURFACING .R5100PITCHING, STONEWORK AND PROTECTION AGAINST EROSION .5700ROAD MARKINGS .R5600ROAD SIGNS R5900FINISHING THE ROAD AND ROAD RESERVE ANDTREATING OLD ROADS .R8100TESTING MATERIAL AND WORKMANSHIPTREATING OLD ROADS RRTOTAL RCALCULATION OF TENDER SUMSUMMARY OF SCHEDULE OF QUANTITIES TOTAL . RADD CONTINGENCIESThe sum provided here is under the sole control of theEngineer and may be deducted in whole or in part. (The Tenderermust add 5% of the total of schedule of quantities) .RSUBTOTAL RADD VALUE-ADDED TAX (VAT)The tenderer shall add 15% of subtotal for VAT RTOTAL CARRIED TO FORM OF OFFERRSIGNED ON BEHALF OF TENDERER : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(a)(i) Prefabricated mountable kerb, SABS 927 fig 8c, as shown on the Drawings m 720,00 (ii) Prefabricated mountable kerb, SABS 927 fig 7, as shown on the Drawings m 5,0 (iii) Prefabricated mountable kerb, SABS 927 fig 3, as shown on the Drawin

Related Documents:

Tech Tray 030-709 Push-In Nylon Christmas Tree Fasteners Tech Tray 12 60 x Tech Tray 030-720 x GM/Chrysler Body Retainers Tech Tray 20 252 x Tech Tray 030-722 x Ford Body Retainers Tech Tray 13 160 x Tech Tray 030-724 x Import Body Retainers Tech Tray 15 195 x Tech Tra

Lazarev Vladislav Serghei Contract 15. Malinovschi Victor Gheorghe Contract 16. Nistor Haralambie Tudor Contract 17. Pereteatcă Andrei Leonid Contract . Redica Irina Boris Contract 15. Rotari Marin Constantin Contract 16. Solonari Teodor Victor Contract 17. Stan Egic Ghenadie Contract 18. Stratu Cristian Mihail Contract .

NEC 3 Professional Services Contract (PSC). NEC 3 Short Contract (ECSC) and Short Subcontract (ECSS). NEC 3 Adjudicator’s Contract (AC). NEC 3 Term Services Contract (TSC). NEC 3 Term Service Short Contract (TSSC). NEC 3 Framework Contract (Framework Contract). NEC 3 Supply Contract (SC).

management practices (ref. Texas Government Code, Chapter 2262 Statewide Contract Management, Subchapter C Contract Advisory Team). Contract Management: The entire contracting process from planning through contract administration, including contract closeout. Contract Manager: A person who is employed by UTRGV and has significant contract .

Second Edition ANSINCMA ASD 1-21 3 Structure of The Contract Management Standard Publication The Contract Management Standard Publication is comprised of five components (see FIGURE 1): 1 Guiding Principles—For contract management, these principles apply to all contract managers in all phases of the contract life cycle. 2 Contract Life Cycle Phases—The phases of a contract: pre .

Accreditation Programme for Nursing and Midwifery . Date of submission of report to Bangladesh Nursing and Midwifery Council_ 2) The Review Team During the site visit, the review team members validate the self-assessment for each of the criteria. . as per DGNM guideline. Yes ⃝No

Mr Nagaraj Kamath, M.Tech Mr Ramakrishna Nayak, M.Tech, MBA Mr Vinod T Kamath, M.Tech, MBA Mr Ramnath Shenoy, M.Tech, MBA Assistant Professors Ms Soujanya S Shenoy, BE, MBA Mr Sandeep Nayak Pangal, MBA, M.Tech Ms Bhagya R S, BE, M.Tech Mr Devicharan R, BE, M.Tech Mr Nithesh Kumar

Tourism and Hospitality Terms published in 1996 according to which Cultural tourism: General term referring to leisure trav el motivated by one or more aspects of the culture of a particular area. ('Dictionary of Travel, Tour ism and Hospitality Terms', 1996). One of the most diverse and specific definitions from the 1990s is provided by ICOMOS (International Scientific Committee on Cultural .