DATA CENTERDECOMMISSIONING CHECKLISTTHE SEVEN STEP APPROACH

INTRODUCTIONDecommissioning a data center is no smallmatter. In this eBook, we share our years ofexperience to help guide your IT team through thedecommissioning process.Follow these seven steps to ensure your teardowngoes seamlessly:01. INITIAL SET-UP02. ITEMIZING03. PLANNING04. TOOLING-UP05. TEARING DOWN & WIPING06. PACKING & CLEAR UP07. COORDINATION & RECOVERY

01. INITIAL SET-UPLet’s start by documenting the scope of work.What is the purpose of the project?How long do you have to get the job done?Have you agreed on a budget?List the internal stakeholders associated with the work.Assign a dedicated project manager.Identify necessary workflows and backup systems toensure there is not a critical loss of power or data.Notes:CHECKBOX

02. ITEMIZINGHave you mapped out all of the hardware and software assetsearmarked for decommission?Conduct network discovery tools to identify items. Follow up with aphysical review. Compare results to pre-existing CMDBs (configurationmanagement databases).Compile a comprehensive inventory: servers, racks, storageequipment, hard drives, SSDs, HVAC equipment, networking gear,firewalls, routers, software licenses, virtualization hardware, keyboards,mice, power equipment, cabinets, and so on.Identify and retain all software licenses associated with servers andnetworking equipment.Create detailed asset map listing equipment and location of items tobe decommissioned. Again, compare with CMDBs.Work with your ITAD provider to determine the final designationfor each item: will you reuse, remarket, or recycle? What are theopportunities for asset recovery?Notes:CHECKBOX

03. PLANNINGCreate an implementation plan listing roles, responsibilities, andactivities to be performed.When will you implement the decommissioning, and how longdo you estimate it will take?Will the work coincide with peak hours? Do you need to issuewarnings about the potential for service downtime?Have you created necessary workflows and backup systems toensure there is not a critical loss of power or data.Have you put together a contact list of vendors you might needbefore, during, and after the work?Have you prepared tracking numbers for each earmarkedasset, and canceled vendor maintenance contracts for affectedequipment?Have you identified how will you data sanitize storage devices?Notes:CHECKBOX

04. TOOLING UPList out the tools and labor you will need for the job: forklifts,hoists, device shredders, degaussers, pallets, packing foam, handtools, labels, boxes, crates, etc.What kinds of hoist will best serve your needs for your particulardata center?What type of packing foam is required for the equipment you willbe boxing?Who will oversee and carry out the work? If you are hiring outsideresources, undertake the necessary background and securitychecks ahead of time.Notes:CHECKBOX

05. TEARING DOWN & WIPINGGather stakeholders ahead of the decommissioning. Run throughthe plan and iron out details.Are there critical steps that will require live authorization beforeproceeding?Do you plan to regroup once the work is underway to reviewprogress?On the day of the decommissioning, safely disconnect equipmentfrom the network according to the plan. Tag assets.For data storage equipment, will devices be transported offsite forsanitization and handling elsewhere?Notes:CHECKBOX

06. PACKING & CLEAR UPNow the teardown is complete and packing can begin, haveyou reserved a dedicated space for packing assets? Use theappropriate packing materials for each item as specified in theplan.For items earmarked for reuse within the organization, follow thehandoff protocol.For assets destined for refurbishing or recycling, pack and labelfor the intended recipients.Use asset management software to track all stages.If you are working in colocation, what are the requirements forhow the vacated space should be left?For on-premise, make sure you follow the stipulations laid out inthe project plan for clearing and cleaning the teardown space.Notes:CHECKBOX

07. COORDINATION & RECOVERYHave you liaised with your IT and accounting teams to ensuredisposed assets are recorded accordingly?For refurbished assets, coordinate with your ITAD provider toconfirm secure chain of custody and receipt of sanitizationcertificates for storage hardware.Ensure you receive itemized certificates of destruction for itemsearmarked for destruction and/or deemed as not recoverable.What is the total value recovered and returned to your IT budget?Assess similarly for recycled hardware. Your ITAD providerwill assist with each stage of the process to ensure you aremaximizing return from your retiring assets.Remember to review documentation before and after the processto ensure compliance with responsible recycling practices.Notes:CHECKBOX

PLANNING A DATA CENTERDECOMMISSIONING?CONTACT US TODAY FOR IMMEDIATE ASSISTANCE.info@horizontechnology.com 1 (949)-595-8244www.horizontechnology.com

Decommissioning a data center is no small matter. In this eBook, we share our years of experience to help guide your IT team through the decommissioning process. Follow these seven steps to ensure your teardown goes seamlessly: INTRODUCTION 01. INITIAL SET-UP 02. ITEMIZING 03. PLANNING 04. TOOLING-UP 05. TEARING DOWN & WIPING 06. PACKING .

Related Documents:

The primary objectives are to identify the alternatives available to Reed College with regards to decommissioning and to estimate the associated costs. Note that the removal of reactor fuel is done before commencement of decommissioning operations; therefore, this task is not included as part of decommissioning costs.

OIG conducted an Audit of NRC's Decommissioning Funds Program (OIG-16-A-16) that included a review of NRC's oversight of the decommissioning funds of both reactors and materials. The audit report was issued in June 2016. During that audit, OIG was not able to verify the accuracy of the Inventory List of material licensee decommissioning

The Connection Server brokers a connection to a Horizon Agent running on a Horizon-managed desktop or server. For this use case, the Horizon Agent is installed on physical Windows 10 machines. 3. The Horizon Client then forms a protocol session connection to a Horizon Agent in the physical machine.

Manager Opening Checklist Line Check Prep Checklist Station Setup Bar Opening Checklist Closing Checklist Host Opening/Closing Checklist Multi‐unit Inspections Checklist Periodic Maintenance Checklist Permits & License Review Staff Reviews/Evaluations

Audit of NRC’s Transition Process for Decommissioning Power Reactors . plant is dismantled and the property is decontaminated. The entire decommissioning process may take up to 60 years. For a map of si

Project Execution Plan Building 123 Decommissioning Project 91 1 1 I97 Page 5of 19 Document Number RFIRMRS-97-082 Revision 4 BUILDING 123 DECOMMISSIONING PROJECT EXECUTION PLAN 1.0 Project History/ Background 1.1 Introduction The purpose of this project is to decommission buildings 123, 113, 114, and 123S, stabilize in place o

3 International Atomic Energy Agency Decommissioning Planning -Key Elements Review of decommissioning strategies Specific studies to support selected strategy Feasibility/ Cost-Benefit analyses Cost estimate for the work at the actual site Schedule for performing the work at the site Technical scope of

9 MATHEMATICS - Week 1 Lesson 2: Properties of Operations Learning Objectives: Students will be able to simplify computations with integers, fractions and decimals by using the associative and commutative properties of addition and multiplication, and