HVAC MOS Method Statement for Air Balancing of HVAC System FCU AHU Exhaust Fans &Pressurization Unit Air Balancing Method Statement Air Balancing For Fan Coil Units (FCU) 1. Check that all automatic controls are fully commissioned and operating properly 2. All pre-commissioning checks have been carried out 3. Select the specified speed of the Fan Coil 4. Set all the dampers in the grill outlet at full open position 5. Take initial total flow of the unit by adding up all the measured volume from each outlets (initial scan) 6. Compare the reading against the designed flow. Find out the percentage of the design flow. 7. Find out the index outlet (i.e. which has the very low percentage of reading) from the initial scan. 8. Keep the index outlet damper fully open (i.e. opposed blade damper of grill ) 9. Then throttle the air volume at each outlet to get the design percentage of flow proportionally by using the Flow hood (balometer). 10. Each time when you throttle the outlet by closing the diffuser / grill damper, the index outlet air flow raises gradually. Measure the index point each time. 11. By the time the last outlet is completed, air volume at all outlets including the index are proportionally balanced. 12. Note all the readings at all outlets and keep records. Air Balancing For Ventilation/Extract Fans 1. Check that all pre-commissioning checks has been carried out. 2. Measure the motor ampere & fan rpm of all fans and shall be set to provide total air volume within acceptable tolerances 3. Fan speed & motor current shall not exceed the maximum allowable range set by the manufacture 4. Set all the main duct & branch duct dampers at full open position 5. Check the total flow of the fan by traverse method, flow will be set to 105 % of design. 6. Check the flow in all branches and find out the index branch 7. Balance the branches in proportion with the same percentage of total flow by adjusting the volume control dampers and keeping the index branch damper at fully open position. 8. Measure the index branch and proportionally balance it to the same percentage. Page 1 4
HVAC MOS Method Statement for Air Balancing of HVAC System FCU AHU Exhaust Fans &Pressurization Unit Air Balancing Method Statement Air Balancing For Fan Coil Units (FCU) 1. Check that all automatic controls are fully commissioned and operating properly 2. All pre-commissioning checks have been carried out 3. Select the specified speed of the Fan Coil 4. Set all the dampers in the grill outlet at full open position 5. Take initial total flow of the unit by adding up all the measured volume from each outlets (initial scan) 6. Compare the reading against the designed flow. Find out the percentage of the design flow. 7. Find out the index outlet (i.e. which has the very low percentage of reading) from the initial scan. 8. Keep the index outlet damper fully open (i.e. opposed blade damper of grill ) 9. Then throttle the air volume at each outlet to get the design percentage of flow proportionally by using the Flow hood (balometer). 10. Each time when you throttle the outlet by closing the diffuser / grill damper, the index outlet air flow raises gradually. Measure the index point each time. 11. By the time the last outlet is completed, air volume at all outlets including the index are proportionally balanced. 12. Note all the readings at all outlets and keep records. Air Balancing For Ventilation/Extract Fans 1. Check that all pre-commissioning checks has been carried out. 2. Measure the motor ampere & fan rpm of all fans and shall be set to provide total air volume within acceptable tolerances 3. Fan speed & motor current shall not exceed the maximum allowable range set by the manufacture 4. Set all the main duct & branch duct dampers at full open position 5. Check the total flow of the fan by traverse method, flow will be set to 105 % of design. 6. Check the flow in all branches and find out the index branch 7. Balance the branches in proportion with the same percentage of total flow by adjusting the volume control dampers and keeping the index branch damper at fully open position. 8. Measure the index branch and proportionally balance it to the same percentage. Page 1 4
HVAC MOS TERMINAL BALANCING (Using Anemometer & Flow Hood) 1. Measure the flow at each outlet of the terminal branches 2. Find out the index terminal and keep the damper fully open 3. Balance the other outlets proportionally to the same percentage of flow set in the branch duct. 4. Check the flow in each outlet and record including the index terminal 5. Take the total flow in the main duct again and record by using traverse duct method. After Total System balance, the following values shall be measured and recorded: Fan RPM Motor voltage and amperes Static pressure entering the Fan Static pressure leaving the fan 6. Static pressure entering and leaving the fan shall be measured as follows: Static pressure readings leaving the fan shall be taken as far as from the fan as is practical, but shall be before any restrictions in the duct (such as duct turns ) No readings shall be taken directly at the fan outlet or through the flexible connection Static pressure entering the fan shall be measured in the inlet duct upstream of any flexible connection and downstream of any duct restriction. Static pressure entering a double inlet fan shall be measured through the wall of the plenum, which houses the fan In all cases, the reading shall be taken to represent as true a value as possible. True value is actual measured static pressure. Air Balancing for Air Handling Units (AHU) Set the fan rpm to provide design total air quantity within acceptable limits. Fan speed shall not exceed the maximum allowable rpm as established by the fan manufacturer. Set all the main duct & branch duct dampers and outlet dampers at full open position. Check the total flow of the fan by duct traverse method, flow will be set to 105 % of design flow Check the flow in all branches and find out the index branch. Balance the branches in proportion with the same percentage of total flow by adjusting the volume control dampers and keeping the index branch dampers at fully open condition. Page 2 4
HVAC 1. 2. 3. 4. MOS Measure the index branch and proportionally balance terminals. The final setting of fan rpm shall not result in overloading motor in any mode of operation .Dampers shall be modulated, ampere of the supply fan motor shall be measured to ensure motor overload can occur. After Total System Balancing, the following values shall be recorded: Fan rpm Motor voltage and current Entering static pressure Leaving static pressure. the air the fan and the that no Air Balancing for Air Terminals Depending upon location and access to air airflow measuring instruments will be utilized to terminals. Assuming adequate access provided, would be used which gives a direct reading of which cancels out the need for effective grille consideration and velocity corrections. terminals, various types of record the actual airflow at a direct reading balometer volume rather than velocity, areas, terminal configuration If access is restricted then a rotating vane anemometer shall be used velocity reading obtained would be converted to volume (velocity area volume) and a comparison between the pitot traverse reading made to obtain a correction factor which would be incorporated to true velocity reading . Alternatively, the effective area provided register / grille manufacturer will be incorporated in the design calculations. and the x free will be give a by the velocity Air quantities shall Guide 3/89 Standards. Any main branch may be chosen to start with but as normal practice and having carried out a rough balance of main and sub-branches, start with the most remote branch and then sub-branch. Locate the terminal, which is discharging the lowest percentage of its design flow rate. This is generally the last terminal in the run. if not, adjust the damper in the last terminal unit until it is working with the same percentage as the lowest one previously measured. Measure the flow from the terminal next to the index and work out the percentage flow as close as possible to that of the index. Fix the damper in position. Repeat the the index. As the dampers are closed along the run, more air will be driven towards the downstream terminals and the volume of air discharged at procedure be for measured the next according terminal, to again CIBSE Application comparing it with Page 3 4
HVAC MOS the terminal index will rise. This does not affect the balancing procedure since each terminal being adjusted is related in turn with the index. When all the terminals have been balanced on a sub-branch, each terminal will be running with an equal percentage of the design flow rate, within the allowable tolerances. The flow rates at each terminals must be measured and recorded. Once again a summation should be made to check that the total is in reasonable agreement with the measured sub-branch flow. Test results documents. shall be recorded in the approved test sheets and Air Balancing for Staircase Pressurization Fan Check all pre-commissioning checks has been carried out. Check Fire alarm interfacing and actuation will be done by the specialist. Set the all dampers in the grill outlet at full open position. Take the initial flow of fan by adding up all the measured volume from each outlet (Initial scan) Compare the readings against the design volume, find the percentage of design flow rate. Find the index outlet (least favoured outlet) from the scan. Keep the index outlet damper fully open. Then throttle the air volume at each outlet to get the design percentage of flow proportionally by anemometer with effective area. Each time when you throttle the outlet by closing the damper, the index outlet the air flow rises gradually, measure the index point of each time. Balance the air volume at all terminal (Including index) proportionally. PRESSURE MEASUREMENT Fan functional will be checked. All fire doors are closed during fan running will be confirmed. Differential pressure measurement will be carried floor & stair. Record the readings and compare with the specified pressure. out between the Page 4 4
Method Statement for Air Balancing of HVAC System FCU AHU Exhaust Fans &Pressurization Unit Air Balancing Method Statement Air Balancing For Fan Coil Units (FCU) 1. Check that all automatic controls are fully commissioned and operating properly 2. All pre-commissioning checks have been carried out 3. Select the specified speed of the Fan Coil 4.
Bruksanvisning för bilstereo . Bruksanvisning for bilstereo . Instrukcja obsługi samochodowego odtwarzacza stereo . Operating Instructions for Car Stereo . 610-104 . SV . Bruksanvisning i original
8. Load Balancing Lync Note: It's highly recommended that you have a working Lync environment first before implementing the load balancer. Load Balancing Methods Supported Microsoft Lync supports two types of load balancing solutions: Domain Name System (DNS) load balancing and Hardware Load Balancing (HLB). DNS Load Balancing
10 tips och tricks för att lyckas med ert sap-projekt 20 SAPSANYTT 2/2015 De flesta projektledare känner säkert till Cobb’s paradox. Martin Cobb verkade som CIO för sekretariatet för Treasury Board of Canada 1995 då han ställde frågan
service i Norge och Finland drivs inom ramen för ett enskilt företag (NRK. 1 och Yleisradio), fin ns det i Sverige tre: Ett för tv (Sveriges Television , SVT ), ett för radio (Sveriges Radio , SR ) och ett för utbildnings program (Sveriges Utbildningsradio, UR, vilket till följd av sin begränsade storlek inte återfinns bland de 25 största
Hotell För hotell anges de tre klasserna A/B, C och D. Det betyder att den "normala" standarden C är acceptabel men att motiven för en högre standard är starka. Ljudklass C motsvarar de tidigare normkraven för hotell, ljudklass A/B motsvarar kraven för moderna hotell med hög standard och ljudklass D kan användas vid
LÄS NOGGRANT FÖLJANDE VILLKOR FÖR APPLE DEVELOPER PROGRAM LICENCE . Apple Developer Program License Agreement Syfte Du vill använda Apple-mjukvara (enligt definitionen nedan) för att utveckla en eller flera Applikationer (enligt definitionen nedan) för Apple-märkta produkter. . Applikationer som utvecklas för iOS-produkter, Apple .
EPA Test Method 1: EPA Test Method 2 EPA Test Method 3A. EPA Test Method 4 . Method 3A Oxygen & Carbon Dioxide . EPA Test Method 3A. Method 6C SO. 2. EPA Test Method 6C . Method 7E NOx . EPA Test Method 7E. Method 10 CO . EPA Test Method 10 . Method 25A Hydrocarbons (THC) EPA Test Method 25A. Method 30B Mercury (sorbent trap) EPA Test Method .
The asset management plan also includes: clear links to (or incorporates) the organisation’s capital/procurement plan long-term (5-10 years) needs based on the direction of travel for the organisation the gap between the current and future asset base, and the way this will be addressed in the form of asset acquisitions and disposals, by each asset category plans for .