OREGONDEPARTMENTOFTRANSPORTATIONDelivery and OperationsDivisionEngineering and TechnicalServices BranchEngineering AutomationSectionJoseph R. Thomas, PLSEngineering AutomationManagerChief of Surveys(503) 986-3316CONSTRUCTION SURVEYING MANUALFOR CONTRACTORSJanuary 15, 2021

This companion manual to Standard Specification 00305 provides detailedinformation on performing construction survey work for highways, bridges, signs,signals, illumination and associated work.Revision History--------For previous version revision history, please see past versions which are available from the ODOTEngineering Automation Section.--------Seventh Release - January 15, 2021- Removed previous version Revision History.Chapter 1.3- Revised timing of Pre-Survey Conference to match Pre-ConstructionConference.Chapter 4.6- Clarified Culvert/Pipe Data Sheet requirements.Chapter 8.1.1 - Added data format requirement for Grade Verification points.Chapter 9.4- Added final Vertical Clearance measurement instructions.This document is formatted for double sided printing

TABLE OF CONTENTSCHAPTER 1 - GENERAL INFORMATION . 11.1 Scope .11.2 Definitions.11.3 Mandatory Pre-Survey Conference.21.4 Review by the Engineer .31.5 Agency Responsibilities.31.6 Contractor Responsibilities .31.7 Survey Methods .61.8 Automated Machine Guidance .61.9 Survey Work Records .71.10 Communication With the Surveyor .7CHAPTER 2 - ELECTRONIC DATA . 82.1 General .82.2 File Formats For Digital Data Exchange .82.3 Other Documents - .8CHAPTER 3 - MATERIALS, EQUIPMENT, AND LABOR . 93.1 Materials .93.2 Survey Equipment .93.3 Personnel .9CHAPTER 4 - CONSTRUCTION STAKING . 114.1 Construction Staking Tolerances .114.2 Slope Stakes and References .114.3 Clearing Limits .124.4 Grade Stakes .124.5 Walls .124.6 Pipes and Culverts.124.7 Box Culverts .124.8 Manholes and Inlets .124.9 Stockpile Sites.134.9.1 Cross Section Method .13Page i

4.9.2 Digital Terrain Model (DTM) Method .134.10 Engineering Stationing.13CHAPTER 5 - HORIZONTAL AND VERTICAL CONTROL AND LAYOUT . 145.1 Horizontal Control .145.1.1 General Specifications .145.1.2 Terrestrial Networks .155.1.3 GNSS Networks.165.1.4 Traverses .175.2 Vertical Control .185.2.1 Field Procedures .185.2.2 Acceptance Standards .195.2.3 Data Requirements.195.3 Bridges .205.3.1 Bridge Survey Control Stations .205.3.2 Layout Marks and Reference Points .215.3.3 Bridge Deck Grades .225.4 Pavements .235.5 Signs, Signals, Illumination and Fabricated Items.23CHAPTER 6 - TEMPORARY PROTECTION, PRESERVATION, ANDMONUMENTATION . 256.1 Temporary Protection and Direction of Traffic .256.2 Preservation of Survey Markers.256.3 Project Monumentation .25CHAPTER 7 - THE PRE-CONSTRUCTION SURVEY . 267.1 Scope .267.2 Timing .267.3 Tasks .267.3.1 Gather Data .267.3.2 Check Control .267.3.3 Check the DTM .267.3.4 Search For and Tie New Monuments .277.3.5 Utility Relocation.277.3.6 Document Results .27CHAPTER 8 - LINE AND GRADE VERIFICATION . 288.1 General .28Page ii

8.1.1 Submittal Format .288.2 Collection of Grade Verification Points .288.2.1 Outside Subgrade Area .288.2.2 Within Subgrade Area .288.3 Construction Tolerances .298.3.1 Areas with Specified Tolerance values.298.3.2 Areas without Specified Tolerance values .298.4 Evaluation .29CHAPTER 9 – VERTICAL CLEARANCE . 319.1 General .319.2 Temporary Reduction .319.3 Permanent Reduction .319.4 Final Vertical Clearance Measurements .31Page iii

ODOTConstruction Surveying Manual for ContractorsCHAPTER 1 - GENERAL INFORMATION1.1 Scope - This work consists of all surveying activities necessary to control the many phases ofwork required to construct a Project to the lines and grades as shown, specified, or established.Make all supporting computations and field notes required for control of the work and as necessaryto establish the exact position, orientation, and elevation of the work from control stations,including furnishing and setting construction stakes and marks, reference marks, and additionalcontrol stations.Plans, specifications and other data necessary to lay out the work will be available for inspectionat the Engineers office.1.2 Definitions:3D Engineered Model - The Agency prepared electronic file(s) that identify northing, easting,and elevation to represent the Work to be performed. The 3D Engineered Model may include thesurface model(s) or other designed Work elements and is an electronic representation of the line,grade, and cross section applicable to the project.3D Construction Model - Supplemental unstamped 3D Model, not furnished by the Agency, thatthe Contractor is required to submit to the Engineer.Automated Machine Guidance (AMG) - AMG is the computerized guidance of constructionequipment to follow the line and grade of the engineered design. Guidance is either by directcontrol of the machinery or through visual and/or audible signals to the operator. Operation isbased on digital input from positioning systems, and typically produces an increased level ofprecision, speed, and accuracy.Confidence Points - Random points measured in the field within the boundary of a digital terrainmodel (DTM), the purposes of which are to verify the accuracy of the DTM and to provideevidence just prior to construction that the DTM is a reasonable representation of the originalground for computation of volumes and pay quantities. For constructed Grade Verification seeChapter 8 “Line and Grade Verification.”Confidence point locations follow these guidelines: Randomly selected without regard for the location of DTM points or triangles Evenly distributed over the entire DTM area to be validated Proportionately distributed between confidence point types as applicable At a density sufficient to validate the surface, generally ten per instrument location as usedin collecting DTM data or if not applicable, as in LIDAR data, 2% of DTM pointsEngineering AutomationJanuary 15, 2021Page 1 of 31

Construction Surveying Manual for ContractorsODOTControl Network - An array of control stations either established by the Contractor or providedby the Agency.Control Station - Any item identified in the Project records as having a position and elevation onthe Project datum and intended to be used to control the many phases of the construction work.Digital Terrain Model (DTM) - An electronic computer model of the shape of the ground.Grade Verification Points - Points measured in the field used to verify that a constructed gradehas been built according to the line and grade of the design.Reference Stakes - Stakes set away from but with information relating back to the intendedlocation and grade.Slope Catch - The location where a design slope intersects the existing ground and whereexcavation or embankment work should begin to provide the intended earthwork.Slope Staking - The process of using measurements and calculations in the field to determine theslope catch. Slope staking shall normally include setting stakes to mark the slope catch and settinga reference stake for every catch stake.Stakes - Stakes, nails, marks, string lines, or other devices or mechanisms set or established forthe purpose of indicating or controlling the location, orientation, or grade of any feature intendedfor construction, or for the purpose of limiting or influencing the construction work.Staking - The act of placing stakes.Subgrade Area - The area of Subgrade from Subgrade shoulder to Subgrade shoulder.Survey Marker - Any survey monument, control station, or stake.Survey Monument - Any natural or man-made item specified or identified in a property deed,boundary survey, government document, or other instrument of public record, when the purposeof said item is to mark or reference a property boundary, geographical location, elevation, or otherposition.Surveyor - The individual designated by the Contractor and licensed in the state of Oregon as aProfessional Land Surveyor and placed in "responsible charge" of the survey work as defined inORS 672.002(6)(b).Temporary Bench Mark (TBM) - A control station established for the purpose of providingvertical control for the Project. A TBM may or may not have an established horizontal position.1.3 Mandatory Pre-Survey Conference - The prime Contractor, subcontractors, Surveyor,survey crew leader, and all surveying personnel who are to be involved in the survey work shallPage 2 of 31Engineering AutomationJanuary 15, 2021

ODOTConstruction Surveying Manual for Contractorsmeet with the Engineer at or near the time of the pre-Construction Conference, which shall occurprior to beginning survey work. The purpose of this meeting will be to discuss methods andpractices of accomplishing required survey work.1.4 Review by the Engineer - The Engineer may periodically review the notes, calculations andlayout work, including field locations, for compliance with these specifications. Survey work thatdoes not meet the tolerances in Chapter 4.1 of this manual may be rejected, and the work redoneat the Contractors expense to meet the tolerances.Review by the Engineer does not constitute approval or acceptance of the work, nor does it relievethe Contractor of responsibility for performing work in conformance with the plans andspecifications.1.5 Agency Responsibilities: Perform a Pre-Construction Survey in accordance with Chapter 7 of this manual. Provide copies of plans and specifications. Establish initial horizontal and vertical control stations in the proximity of the Project. Provide horizontal and vertical alignment data. Provide cross section grade elevations to establish lines, grades, slopes, cross sections, andcurve superelevations for each phase of roadwork. When available, provide 3D EngineeredModels. Evaluate grade for acceptance at each course of material. Perform measurements and calculations for pay quantities. Perform final "as constructed" measurements.1.6 Contractor Responsibilities - Perform or provide the following items of work: Make calculations, field notes and survey drawings for the layout and control of the workas are necessary to construct the Project as specified. Provide original or copies of notes, calculations and drawings as requested. Preserve survey monuments and control stations according to Chapter 6.2 of this manualand as governed by applicable law. Replace and augment control stations as necessary to control the Project. Establish additional control stations as necessary to control the Project.Engineering AutomationJanuary 15, 2021Page 3 of 31

Construction Surveying Manual for Contractors ODOTRemove and dispose of all flagging, lath, stakes and other temporary staking material afterthe Project is completed. Collect Grade Verification points according to Chapter 8.2 of this manual. Complete Vertical Clearance requirements according to Chapter 9 of this manual.Non-AMG controlled Work: Set stakes to define construction centerline, centerline offsets, detour lines, or other linesnecessary for control of the Project work. Set stakes to define and control the work, that may include but is not limited to thefollowing: Roadway location and grade. Fences and gates. Guardrail, barrier, barricades, and associated features. Traffic delineators, reflectors, and guide devices. Temporary and permanent pavement striping and pavement marking devices. Temporary and permanent signing.* Poles and footings, cabinets, junction boxes, sensors, and other features associatedwith illumination and signal facilities.* Curbs, walks, ADA ramps, stairs, walls, mailboxes, and other miscellaneousstructures.* Pipes, manholes, inlets, weirs, settlement basins and other drainage and waterquality structures and facilities.* *This includes field verification of fit and functionality or as instructedby the Engineer.Landscaping items. Earthwork features including guardrail flares, berms, and mounds Buildings and other structures and facilities. Environmental impact mitigation features.AMG controlled Work:Page 4 of 31Engineering AutomationJanuary 15, 2021

ODOT Construction Surveying Manual for ContractorsFor work being controlled by a 3D Model, as required by the Contract Section 00305.05,provide unstamped 3D Construction Models according to the Contract Section 00150.35which include the following: A Narrative outlining any changes made to the Agency prepared 3D EngineeredModels in the creation of the 3D Construction Models. A copy of the 3D Construction Models that will be used by the Contractor’sequipment for machine guidance or verification, which include and represent theAgency prepared 3D Engineered Models with changes identified in the Narrative.Provide files in LandXML format or as directed. A written AMG work plan as required in Chapter 1.8 of this manual.Bridge Work: Supply survey drawings depicting the location and elevations of the elements ofsubstructure and superstructure and place stakes for features including but not limited tothe following:Substructure: Piling Footings Columns, walls, and abutments Pile caps and cross beams Bearing pads or devicesSuperstructure: Horizontal alignment and deck edges Soffit grades Seismic restraints Wing walls and retaining walls Bridge end panels Deck elevationsEngineering AutomationJanuary 15, 2021Page 5 of 31

Construction Surveying Manual for Contractors Railings Deck drains and other bridge drainage facilitiesODOTSet reference stakes and elevations in the vicinity of the structure work, as are necessaryfor the Engineer to check the layout. This may include establishment of a control network.1.7 Survey Methods - Survey procedures shall be appropriate for the equipment being used andbe according to current Agency practices, which can be found in the current version of theODOT Survey Policy and Procedure Manual available here:http://www.oregon.gov/ODOT/ETA/Documents Geometronics/Survey-Policy-ProcedureManual.pdfNew survey procedures that are not according to current Agency practices shall be submitted tothe Engineer for review 21 days prior to conducting the work. The surveyor may be required todemonstrate the capabilities, accuracy, and reliability of the intended procedure. The Engineerwill evaluate the procedure and intended application and provide approval or rejection within21 days. Work may proceed immediately upon approval of procedures by the Engineer.Test and adjust survey equipment according to Agency’s procedures and maintain records of testresults and submit copies to the Engineer upon request. Information on Agency test proceduresmay be obtained from the Engineer.1.8 Automated Machine Guidance (AMG) - In lieu of setting stakes, the Contractor may useAMG. Inform and gain approval from the Engineer prior to the use of AMG on a project. Submit a plan in writing addressing the use of AMG on the project. The plan shall besubmitted 10 days prior to the Pre-Construction meeting or 21 days prior to use of AMG.The plan shall include but not be limited to the following items: Narrative outlining the overall AMG plan, including; Processes and procedures used with AMG equipment. Survey control procedures (verification and augmentation). Machine positioning technology method (GNSS, total station, laser, etc.). Data validation and data conversion process.List of pay items that will be constructed with AMG procedure for constructingeach type of construction material, including;Page 6 of 31 Construction equipment being used. Personnel being used & their experience using AMG.Engineering AutomationJanuary 15, 2021

ODOTConstruction Surveying Manual for Contractors Survey equipment, GNSS, & sensors being used with each piece ofequipment. Procedure for collecting Grade Verification points on each type of material. Identify the Registered Professional Land Surveyor in charge of the surveyactivities Demonstrate capabilities, accuracy, and reliability of the intended AMG procedure ifrequired by the Engineer. Perform any supplemental staking as directed by the Engineer.1.9 Survey Work Records - Contractor’s survey personnel shall maintain a Project daily recordof work performed by the survey crew. The daily record shall contain the date, crew names, typeand location of work, and work accomplished. Upon request, furnish a copy of diary entries to theEngineer. Furnish a final copy of the diary when the Project is complete.Contractor’s survey personnel shall make all field notes and calculations in a manner consistentwith current Agency practices and on forms provided or approved by the Engineer. Computations,survey notes and other records necessary to accomplish the work shall be neat, legible andcomplete. Furnish copies of computations, notes and other records when requested by theEngineer.For bridges, furnish all computations, layout notes, and drawings of the structure to the Engineerfor review 7 Calendar Days before beginning construction.Upon completion of construction staking and prior to final acceptance of the Contract, furnish tothe Engineer, computations, survey notes, Project records and other data used to accomplish thework. Include an itemized list of the data.All data and original documentation associated with the Project will become the property of theAgency.1.10 Communication With the Surveyor - The Engineer has the right to communicate directlywith the surveyor.Engineering AutomationJanuary 15, 2021Page 7 of 31

Construction Surveying Manual for ContractorsODOTCHAPTER 2 - ELECTRONIC DATA2.1 General - The Engineer will not be responsible for any data translations. Compressed dataprovided by the Engineer or the Contractor will be in a "self-expanding executable" format. Themethod of exchange of electronic data will be mutually agreed upon at the pre-survey conference.2.2 File Formats For Digital Data Exchange - Below are the preferred formats for dataexchanged between the Agency and the Contractor. Other formats may be used, but must be preapproved by the Engineer. Alignments (Horizontal and Vertical) – LandXML alignments. CAD (graphics) - MicroStation Design File (.dgn). Coordinates (1D, 2D, and 3D) – LandXML coordinates. Digital Terrain Model (DTM) – LandXML surface.2.3 Other Documents - Adobe Acrobat Portable Document Format (pdf) is the preferred formatfor exchanging documents such as reports, drawings, maps.Page 8 of 31Engineering AutomationJanuary 15, 2021

ODOTConstruction Surveying Manual for ContractorsCHAPTER 3 - MATERIALS, EQUIPMENT, AND LABOR3.1 Materials - Furnish all materials including supplies, clothing, and incidentals required toaccomplish the work. Use materials of good quality and suitable for the purpose intended. Stakesand hubs are to be of sufficient length to provide a solid set in the ground. Mark the stakes in sucha way as to remain legible for the intended duration. Provide and use safety equipment requiredby State and federal regulations.3.2 Survey Equipment - Furnish survey equipment required to accomplish the work that meetsthe following requirements: Components designed to work together. Suitable for the purpose intended. Capable of achieving the necessary accuracy and precision appropriate for the work. In good operating condition. Maintained to meet manufacturers specifications. Kept in proper adjustment throughout the duration of the Project.Submit documentation on survey equipment that is new to the industry, to the Engineer for review21 days prior to its use. The Engineer will evaluate the equipment and intended application andprovide approval or rejection within 21 days. Equipment may be used immediately upon approvalby the Engineer.3.3 Personnel - Provide technically qualified personnel capable of performing required tasks in atimely and accurate manner. Perform work under the direction and review of the Surveyor.The Surveyor is responsible for: Maintaining registration as a Professional Land Surveyor in the State of Oregon. Performing or validating requirements for procedures and testing of equipment. Maintaining familiarity with the site conditions and progress of the Project. Becoming familiar with the plans and specifications. Determining notes and documentation required for types of survey work. Determining the accuracy required for each survey stake. Using appropriate equipment and methods. Maintaining close communication with the Project inspector(s), Engineer, and Agencysurvey crews working on the Project.Engineering AutomationJanuary 15, 2021Page 9 of 31

Construction Surveying Manual for ContractorsODOT Being familiar with varying construction survey requirements of each aspect of the Project,including various bridge construction techniques when applicable. Notifying the Project inspector of conflicts and changes necessary due to utilities, matchpoint variations, design revisions, or other variables. Ensure survey personnel’s adherence to the Prime Contractors on site personal protectiveequipment rulesThe survey crew leader is responsible for: Becoming familiar with the plans and specifications. Keeping close communication with the Project inspector(s), Engineer, and Agency surveycrews working on the Project. Notifying the Project inspector of conflicts and changes necessary due to utilities, matchpoint variations, design revisions, or other variables.Page 10 of 31Engineering AutomationJanuary 15, 2021

ODOTConstruction Surveying Manual for ContractorsCHAPTER 4 - CONSTRUCTION STAKING4.1 Construction Staking Tolerances - Set stakes or other devices at an adequate frequency andwithin the following tolerances. The Engineer may check the stakes in accordance with Chapter1.4.ItemHorizontalVerticalBox CulvertsBridge SubstructuresBridge SuperstructuresClearing and Grubbing StakesConstruction Centerline Control PointsConstruction Centerline Station PointsCurbs, Walks, and Bike PathsEngineering StationingGrade Stakes - Roadway SubgradeGrade Stakes - Top of RockAll ACP CoursesManholes, Inlets, and CulvertsPCC PavementSlope Stakes and ReferencesTraffic MarkingsWalls - Retaining, MSE, Sound, etc.Wetland Mitigation Control StakesLuminaire and Signal Poles (incl. footings) /- 0.10 ft. /- 0.03 ft. /- 0.02 ft. /- 1.00 ft. /- 0.05 ft. /- 0.10 ft. /- 0.03 ft. /- 1.00 ft. /- 0.20 ft. /- 0.20 ft. /- 0.10 ft. /- 0.10 ft. /- 0.10 ft. /

ODOT Construction Surveying Manual for Contractors Engineering Automation Page 1 of 31 January 15, 2021 CHAPTER 1 - GENERAL INFORMATION 1.1 Scope - This work consists of all surveying activities necessary to control the many phases of work required to construct a Project to

Related Documents:

Bruksanvisning för bilstereo . Bruksanvisning for bilstereo . Instrukcja obsługi samochodowego odtwarzacza stereo . Operating Instructions for Car Stereo . 610-104 . SV . Bruksanvisning i original

Sep 05, 2016 · Engineering Surveying -1 CE212 Compass Surveying Lecture 2016, September 03-04 Muhammad Noman. Compass Surveying Chain surveying can be used when the area to be surveyed is comparatively is

Route Surveying 20 Road Construction Plans and Specifications. 21. Land Surveying Lab 22 Legal Principles of Surveying 23 GPS/GIS Surveying 24 Advanced Surveying Practices 25 Soil Mechanics 26 Concrete and Hot-Mix Asphalt Testing 27. Water and Water Distribution. 28 Spec

10 tips och tricks för att lyckas med ert sap-projekt 20 SAPSANYTT 2/2015 De flesta projektledare känner säkert till Cobb’s paradox. Martin Cobb verkade som CIO för sekretariatet för Treasury Board of Canada 1995 då han ställde frågan

service i Norge och Finland drivs inom ramen för ett enskilt företag (NRK. 1 och Yleisradio), fin ns det i Sverige tre: Ett för tv (Sveriges Television , SVT ), ett för radio (Sveriges Radio , SR ) och ett för utbildnings program (Sveriges Utbildningsradio, UR, vilket till följd av sin begränsade storlek inte återfinns bland de 25 största

Hotell För hotell anges de tre klasserna A/B, C och D. Det betyder att den "normala" standarden C är acceptabel men att motiven för en högre standard är starka. Ljudklass C motsvarar de tidigare normkraven för hotell, ljudklass A/B motsvarar kraven för moderna hotell med hög standard och ljudklass D kan användas vid

LÄS NOGGRANT FÖLJANDE VILLKOR FÖR APPLE DEVELOPER PROGRAM LICENCE . Apple Developer Program License Agreement Syfte Du vill använda Apple-mjukvara (enligt definitionen nedan) för att utveckla en eller flera Applikationer (enligt definitionen nedan) för Apple-märkta produkter. . Applikationer som utvecklas för iOS-produkter, Apple .

Contractors may use a Government employee's Government Purchase Card as long as the Contracting Office authorizes its use and the contractor notifies the Contracting Officer of all purchases made by the contractor during the billing period. Unauthorized Use of the GPC Page 7 of 29 Knowledge Review Computer supplies from a GSA schedule. Food, drinks, clothing, lodging or travel related expenses .